You are here

Home » EFSEC Document » Horse Heaven Wind Farm » Horse Heaven Wind Farm / Application » Horse Heaven Wind Farm / Application / Application

The Draft Transmission Programmatic Environmental Impact Statement (EIS) was released on March 31, 2025. To review the document visit the Transmission PEIS webpage
There has been an extension to comment on the Draft PEIS until May 15th. If you would like to submit a comment visit our comment database: https://comments.efsec.wa.gov

Horse Heaven Wind Farm / Application / Application

Horse Heaven Wind Farm - Horse Heaven Wind Farm - Docket:210011

Process Type Document Group(s) Document link File Date Document Set
Application Application Appendix K - REDACTED Biological Reports 02/08/2021 00001
Application Application Appendix A - Decommissioning Plan 02/08/2021 00001
Original Application
Application Application Appendix B - Preliminary Geotech Report 02/08/2021 00001
Original Application
Application Application Appendix C - SEPA Checklist 02/08/2021 00001
Original Application
Application Application Appendix D - Preliminary County Zoning Determination 02/08/2021 00001
Original Application
Application Application Appendix E - Turbine and Acess Road Displacement Area 02/08/2021 00001
Original Application
Application Application Appendix F - Land Owner List and Legal Descriptions 02/08/2021 00001
Original Application
Application Application Appendix G - Shadow Flicker Analysis 02/08/2021 00001
Original Application
Application Application Appendix H - Glare Analysis Report 02/08/2021 00001
Original Application
Application Application Appendix I Wetlands Water Delination Report 02/08/2021 00001
Original Application
Application Application Appendix J Water Source Documentation 02/08/2021 00001
Original Application
Application Application Original Application Submitted February 8, 2021 02/08/2021 00001
Original Application
Application Application Appendix N - Revegetation and Noxious Weed Control Plan 02/08/2021 00001
Original Application
Application Application Appendix O - Acoustic Modeling Results by Noise Sensitive Receptor 02/08/2021 00001
Original Application
Application Application Appendix P - Emergency Response Plan 02/08/2021 00001
Original Application
Application Application Appendix Q - Visual Simulation 02/08/2021 00001
Original Application
Application Application Appendix S - Economic Impact Assessment 02/08/2021 00001
Original Application
Application Application Appendix T - Notice for Intent for National Pollutant Discharge Elimination System (NPDES) 02/08/2021 00001
Original Application
Application Application Appendix U - Consultation Documents 02/08/2021 00001
Original Application
Application Application Appendix V - TLG Transportation Study 02/08/2021 00001
Original Application
Application Application Updated ASC Appendix H - Glare Analysis Report 06/15/2022 001
Application Application Updated Application for Site Certification (ASC) 12/29/2022 001
Application Application Updated ASC Appendix I - Wetlands Water Delineation Report 06/15/2022 001
Application Application Updated ASC Appendix J - Water Source Documentation 06/15/2022 001
Application Application Updated Application for Site Certification (ASC) Redline 12/01/2022 001
Application Application Updated ASC Appendix N - Revegetation and Noxious Weed Control Plan 06/15/2022 001
Application Application Updated ASC Redline Appendix I - Wetlands Water Delineation Report 12/01/2022 001
Application Application Updated ASC Appendix O - Acoustic Modeling Results by Noise Sensitive Receptor 06/15/2022 001
Application Application Updated ASC Redline Appendix Q - Visual Simulation 12/01/2022 001
Application Application Updated ASC Appendix A - Decommissioning Plan 12/29/2022 001
Application Application Updated ASC Appendix P - Emergency Response Plan 06/15/2022 001
Application Application Updated ASC Appendix B - Preliminary Geotech Report 12/29/2022 001
Application Application Updated ASC Appendix Q - Visual Simulation 06/15/2022 001
Application Application Updated ASC Appendix C - SEPA Checklist 12/29/2022 001
Application Application Updated ASC Appendix S - Economic Impact Assessment 06/15/2022 001
Application Application Updated ASC Appendix D - Planning Determination 12/29/2022 001
Application Application Updated ASC Appendix T - Notice for Intent for National Pollutant Discharge Elimination System (NPDES) 06/15/2022 001
Application Application Updated ASC Appendix E - Turbine and Access Road Displacement Area 12/29/2022 001
Application Application Updated ASC Appendix U - Consultation Documents 06/15/2022 001
Application Application Updated ASC Appendix U - Consultation Documents 12/29/2022 001
Application Application Updated ASC Appendix F - Land Owner List and Legal Descriptions 12/29/2022 001
Application Application Updated ASC Appendix V - TLG Transportation Study 06/15/2022 001
Application Application Updated ASC Appendix V - TLG Transportation Study 12/29/2022 001
Application Application Updated ASC Appendix G - Shadow Flicker Analysis 12/29/2022 001
Application Application Updated ASC Appendix M - Bird and Bat Conservation Strategy 06/15/2022 001
Application Application Updated ASC Appendix L - Habitat Mitigation Plan 12/29/2022 001
Application Application Population Viability Analysis of Ferruginous Hawk (Buteo regalis) in Eastern Washington 11/14/2022 001
Application Application Updated ASC Appendix H - Glare Analysis Report 12/29/2022 001
Application Application Updated ASC Appendix M - Bird and Bat Conservation Strategy 12/29/2022 001
Application Application Multi-scale Resource Selection of Ferruginous Hawk (Buteo regalis) Nesting in Eastern Washington and at the Horse Heaven Clean Energy Center, Benton County, Washington 09/23/2022 001

Pages