Due to public health concerns related to the spread of the novel corona virus (COVID-19), the Energy Facility Site Evaluation Council office (EFSEC) is closed to the public as of March 16, 2020. All EFSEC staff are telecommuting until further notice and EFSEC operations will continue remotely. You may reach EFSEC by phone (360) 664-1345 or by email efsec@utc.wa.gov during regular business hours, 8 am – 5 pm, Monday through Friday. EFSEC Council meetings will be held by teleconference until further notice. Please check this site regularly for updates.

You are here

Home » Energy Facilities » High Top and Ostrea Solar Project

High Top and Ostrea Solar Project

Project Description:

Cypress Creek Renewables, LLC (CCR) proposes to construct and operate the High Top Solar, LLC (High Top Project) and Ostrea Solar, LLC (Ostrea Project) Projects (collectively referred to as “Projects”).
Each Project will utilize solar Photovoltaic (PV) panels organized in arrays and aggregated to an injection capacity limited to 80 megawatts (MW) of alternating current (AC) solar capacity at the point of interconnection to the electric power grid located in Yakima County, Washington.

June 1, 2022 Informational Meeting and Land Use Hearing

Video Recording

Informational Meeting and Land Use Hearing Documents

Mailing list:

If you would like to be added to the project mailing list, please click here

NOTE: This link takes you to a UTC mailing list form that will directly add you to the Hightop & Ostrea Project mailing list. Please enter your email address and it will sign you up for this project mailing list.