The Draft Transmission Programmatic Environmental Impact Statement (EIS) was released on March 31, 2025. To review the document visit the Transmission PEIS webpage
There has been an extension to comment on the Draft PEIS until May 15th. 

The Carriger Solar Draft Order #899 is available for comment April 29th through May 1st 11:59 pm. You can see the Draft Order under the "Orders" header towards the bottom of the Carriger Solar webpage.  

There are two Special Meetings for the Carriger Solar project set for May 5th and May 6th. For more information, visit the Carriger Solar webpage

If you would like to submit a comment for either of the above visit our comment database: https://comments.efsec.wa.gov

Columbia Solar MDNS

Project Background

The Columbia Solar Project is an alternative energy proposal by TUUSSO Energy, LLC (TUUSSO). The proposed Columbia Solar Application for Site Certification (ASC) proposes to construct five new photovoltaic (PV) facilities at five site locations in Kittitas County, Washington. Two generation tie lines would also be constructed. Each new PV solar array would be capable of providing up to 5 Megawatts (MW) of solar energy within the Puget Sound Energy (PSE) service area, for a total of 25 MWac of electrical power generation. The five solar arrays and two generation tie lines are to be constructed on 200 of approximately 232 leased acres within Kittitas County. The five solar project sites are named as follows:

  • Camas
  • Fumaria
  • Penstemon
  • Typha
  • Urtica

The Kittitas Valley is one of the sunniest areas of the state, and the array sites are in close proximity to existing PSE electrical infrastructure. The locations selected by the applicant were based on several criteria, including consistency with the Kittitas County zoning code and comprehensive plan, land use efficiencies, placement on previously disturbed farmland to avoid environmentally sensitive areas, and the minimization of new electrical infrastructure by locating close to existing distribution lines.

How to comment:

The comment period closed on March 13 2018 at 5 PM PST. Thank you for your participation.

Received comments

Important Note: Public comments submitted to the Council via the internet or in writing become public records under the Washington State Public Records Act (RCW 42.56). Information included in the comment such as the commenter's e-mail and mailing address becomes a public record once it is provided to EFSEC and may be subject to public inspection and copying if not protected by federal or state law. For additional information please see our Privacy Notice