You are here

Home » Energy Facilities » Whistling Ridge Energy Project » Whistling Ridge Energy Project Adjudication

The Draft Transmission Programmatic Environmental Impact Statement (EIS) was released on March 31, 2025. To review the document visit the Transmission PEIS webpage
There has been an extension to comment on the Draft PEIS until May 15th. 

The Carriger Solar Draft Order #899 is available for comment April 29th through May 1st 11:59 pm. You can see the Draft Order under the "Orders" header towards the bottom of the Carriger Solar webpage.  

There are two Special Meetings for the Carriger Solar project set for May 5th and May 6th. For more information, visit the Carriger Solar webpage

If you would like to submit a comment for either of the above visit our comment database: https://comments.efsec.wa.gov

Whistling Ridge Energy Project Adjudication

EFSEC is reviewing Application No. 2009-01 under the procedures set forth in Chapter 80.50 of the Revised Code of Washington (RCW) and Title 463 of the Washington Administrative Code (WAC) for reviewing applications for new major energy facilities. EFSEC is holding an adjudicative proceeding under Chapter 34.05 RCW, the Administrative Procedure Act. EFSEC has commenced the adjudicative hearing related to Application No. 2009-01 in accordance with the procedural requirements found in Chapter 463-30 WAC and Chapter 34.05 RCW.

For information regarding the Whistling Ridge adjudicative proceedings call EFSEC at (360) 664-1345