How to Review Interested persons can review the Draft Programmatic EIS on this website, or at library locations available here: Draft PEIS Library Access List. Printed copies, or digital copies on USB drives, can be provided at cost of production to those who request them. |
Transmission Programmatic EIS
Contacts for the Project Sean Greene Patricia Betts |
Draft Programmatic Environmental Impact Statement (EIS)
The Energy Facility Site Evaluation Council (EFSEC) is pleased to announce the release of the Draft Programmatic Environmental Impact Statement (EIS) for electrical transmission facilities with a nominal voltage of 230 kilovolts (kV) or greater. This Programmatic EIS was prepared in accordance with the Washington State Environmental Policy Act (SEPA) under Chapter 43.21C.405 of the Revised Code of Washington (RCW) and Chapters 197-11 of the Washington Administrative Code (WAC).
As directed by the Washington State Legislature in RCW 43.21C.405, this Draft Programmatic EIS analyzes potential direct, indirect, and cumulative impacts of the construction, operation and maintenance, and upgrade or modification of transmission facilities in the State of Washington. It includes an analysis of potential impacts on the elements of the natural and built environment specified under RCW 43.21C.405(3), WAC 197-11-444, and WAC 463-60-535.
The Draft Programmatic EIS and supporting documents can be found below:
You can view the April 8, 2025 Draft PEIS Informational Meeting Recording here.
You can view the April 22, 2025 Draft PEIS Public Comment Meeting Recording here.
You can view the April 24, 2025 Draft PEIS Public Comment Meeting Recording here.
Note: due to the length of some of these documents, it is recommended reviewers make use of document bookmarks when viewing in browser, or when downloaded for review through a PDF reader.
Draft Programmatic EIS Documents
Draft PEIS Meeting Documents
Document Title | Document Date | |
---|---|---|
Draft PEIS Info Meeting Agenda | 04/08/2025 | |
Draft PEIS Presentation | 04/08/2025 |
For more information on the Programmatic EISs currently being developed by the WA State Department of Ecology on wind, solar, and green hydrogen, please visit their website: https://ecology.wa.gov/regulations-permits/sepa/clean-energy/programmatic-eis
How the Programmatic EIS will be Used
This Programmatic EIS analyzes the adverse environmental impacts of large electrical transmission facilities but does not analyze any specific transmission proposal. Any specific transmission facility proposal would require additional SEPA environmental review.
This Programmatic EIS is unique from most other SEPA EISs. The Legislature directed it to be prepared in RCW 43.21C.405 and required analysis of additional topics in the EIS. Additionally, in RCW 43.21C.408 the legislature mandated that a SEPA lead agency for a transmission facility covered by this Programmatic EIS must consider this document in its environmental review. Furthermore, when the recommendations (mitigation measures) identified in this Programmatic EIS are implemented for site-specific proposals, those proposals “are considered to have mitigated the probable significant adverse project-specific environmental impacts under this chapter for which recommendations were specifically developed.”
This Draft Programmatic EIS is intended to:
- Provide a broad environmental impact assessment
- Facilitate streamlined planning
- Support informed decision-making
- Identify mitigation strategies
- Initiate public and stakeholder engagement
The Geographic Scope, or Study Area, of this Draft Programmatic EIS includes areas throughout the State of Washington where transmission facilities are likely to be developed. For the purpose of this Draft Programmatic EIS, Tribal lands and undersea cables are not included in the Study Area. Additional information can be found in Section 1.5.1 Geographic Scope of the Programmatic EIS.
This Programmatic EIS is unique in another way. It includes a framework and requirements for project level environmental review that are separated into three categories: General Conditions, Avoidance Criteria, Mitigation Measures. Additional information can also be found in Sections 3.1.3.1 General Conditions, 3.1.3.2 Avoidance Criteria, and 3.1.3.3 Mitigation Measures of the Programmatic EIS.
Project-specific applications would include details about the precise location and site-specific conditions. For most elements of the environment, this Draft Programmatic EIS provides a GoldSET suitability map (see Section 3.1.6 Suitability Map) that, when incorporated with project-specific applications, could be used to facilitate more informative and efficient environmental planning.
Review, Comment, and Public Meeting
EFSEC invited public review and comment on the Draft Programmatic EIS in a 30-day public comment period which began on March 31, 2025 and planned to end on April 30, 2025, but which was subsequently extended to May 15, 2025. During that time there was a public informational meeting held on April 8, 2025, and two public comment hearings held on April 22 and April 24, 2025. The collected comments are available below. Please note: some comments are being reviewed for confidential content and will only be posted for public review after appropriate redactions are made out of respect to the furnishing commentor.
Draft PEIS Agency and Tribal Comments
Document Title | Document Date | |
---|---|---|
Confederated Tribes of the Colville Reservation Comments | 04/22/2025 | |
WDFW Comments | 04/28/2025 | |
Confederated Tribes of Warm Springs Comments | 05/15/2025 | |
CRITFC Comments | 05/15/2025 | |
Yakama Nation Comments | 05/15/2025 | |
Umatilla CTUIR Comments | 05/15/2025 | |
Department of Commerce Comments | 05/15/2025 | |
WDNR Comments | 05/15/2025 | |
Department of Ecology Comments | 05/15/2025 |
Draft PEIS NGO Comments
Document Title | Document Date | |
---|---|---|
PSE Comments | 05/15/2025 | |
Columbia Riverkeeper Comments | 05/15/2025 | |
Conservation Northwest Comments | 05/15/2025 | |
The Nature Conservancy Comments | 05/15/2025 | |
Washington Conservation Action Comments | 05/15/2025 |
Draft PEIS All Campaign Comments
Document Title | Document Date | |
---|---|---|
All Campaign Comments 001 - 096 | 05/15/2025 |
Draft PEIS SEPA Scoping
A comment campaign was open from June 28, 2024 through July 28 2024 11:59pm PDT.
There were two virtual public comment meetings held via Teams or phone:
Thursday, July 18, 2024 (5:00pm to 8:00pm PDT)
-
- Microsoft Teams: https://bit.ly/PEIS_ScopingPubCmtMtg1
- Or via Phone Number: (564)-999-2000 Conference ID: 335 336 413#
Tuesday, July 23, 2024 (5:00pm to 8:00pm PDT)
-
- Microsoft Teams: https://bit.ly/PEIS_ScopingPubCmtMtg2
- Or via Phone Number: (564)-999-2000 Conference ID: 152 730 471#
July 18, 2024 Public Comment Meeting
Or view on YouTube: https://youtu.be/Rx2xjcrwLB8
July 23rd, 2024 Public Comment Meeting
Or view on Youtube: https://youtu.be/Sv3Pbnl83bw?si=H1QLYuJPcvWBuzIz
PEIS-SEPA Scoping