Kittitas Valley Permits
Permits
Document Title | Document Date | |
---|---|---|
Construction Stormwater General Permit | 10/23/2008 | |
Nation Wide Permit | 05/03/2007 |
The Draft Transmission Programmatic Environmental Impact Statement (EIS) was released on March 31, 2025. To review the document visit the Transmission PEIS webpage.
There has been an extension to comment on the Draft PEIS until May 15th. If you would like to submit a comment visit our comment database: https://comments.efsec.wa.gov
Document Title | Document Date | |
---|---|---|
Construction Stormwater General Permit | 10/23/2008 | |
Nation Wide Permit | 05/03/2007 |
© Copyright 2019 by the Washington State Energy Facility Site Evaluation Council (EFSEC)