You are here

Home » Energy Facilities » Carriger Solar » Carriger SEPA

The Draft Transmission Programmatic Environmental Impact Statement (EIS) was released on March 31, 2025. To review the document visit the Transmission PEIS webpage
There has been an extension to comment on the Draft PEIS until May 15th. 

The Carriger Solar Draft Order #899 is available for comment April 29th through May 1st 11:59 pm. You can see the Draft Order under the "Orders" header towards the bottom of the Carriger Solar webpage.  

There are two Special Meetings for the Carriger Solar project set for May 5th and May 6th. For more information, visit the Carriger Solar webpage

If you would like to submit a comment for either of the above visit our comment database: https://comments.efsec.wa.gov

Carriger SEPA

Mitigated Determination of Non-Significance (MDNS)

A 14-day comment period will be open for the MDNS from April 7 through April 20 11:59 pm. Comments can be submitted electronically online by visiting the EFSEC comment database at https://comments.efsec.wa.gov/.

Written comments can be submitted by mail to:
The Energy Facility Site Evaluation Council
PO Box 47250
Olympia, WA 98504-7250

Carriger MDNS Public Comments