01/19/2021 |
Attachment J ~ Visual Impact Assessment |
Application |
Application |
01/19/2021 |
Attachment I ~ Acoustic Assessment Report |
Application |
Application |
01/19/2021 |
Attachment G ~ Plant and Big Game Assessment |
Application |
Application |
01/19/2021 |
Redacted Attachment F ~ Wildlife and Habitat Survey Redacted |
Application |
Application |
01/19/2021 |
Attachment B ~ Preliminary Site Plan |
Application |
Application |
01/19/2021 |
Attachment E ~ Additional Site Maps |
Application |
Application |
01/19/2021 |
Attachment P ~ Socioeconomic |
Application |
Application |
01/19/2021 |
Attachment D ~ Vegetation and Weed Management Plan |
Application |
Application |
02/08/2021 |
Appendix F - Land Owner List and Legal Descriptions |
Application |
Application |
02/08/2021 |
Appendix S - Economic Impact Assessment |
Application |
Application |
02/08/2021 |
Appendix E - Turbine and Acess Road Displacement Area |
Application |
Application |
02/08/2021 |
Appendix U - Consultation Documents |
Application |
Application |
02/08/2021 |
Appendix I Wetlands Water Delination Report |
Application |
Application |
02/08/2021 |
Appendix V - TLG Transportation Study |
Application |
Application |
02/08/2021 |
Appendix D - Preliminary County Zoning Determination |
Application |
Application |
02/08/2021 |
Appendix T - Notice for Intent for National Pollutant Discharge Elimination System (NPDES) |
Application |
Application |
02/08/2021 |
Appendix C - SEPA Checklist |
Application |
Application |
02/08/2021 |
Original Application Submitted February 8, 2021 |
Application |
Application |
02/08/2021 |
Appendix A - Decommissioning Plan |
Application |
Application |
02/08/2021 |
Appendix B - Preliminary Geotech Report |
Application |
Application |
02/08/2021 |
Original Application Cover Letter February 8, 2021 |
Application |
Letter |
02/08/2021 |
Appendix N - Revegetation and Noxious Weed Control Plan |
Application |
Application |
02/08/2021 |
Appendix K - REDACTED Biological Reports |
Application |
Application |
02/08/2021 |
Appendix J Water Source Documentation |
Application |
Application |
02/08/2021 |
Appendix Q - Visual Simulation |
Application |
Application |
02/08/2021 |
Appendix H - Glare Analysis Report |
Application |
Application |
02/08/2021 |
Appendix O - Acoustic Modeling Results by Noise Sensitive Receptor |
Application |
Application |
02/08/2021 |
Appendix G - Shadow Flicker Analysis |
Application |
Application |
02/08/2021 |
Appendix P - Emergency Response Plan |
Application |
Application |
03/17/2021 |
Appendix O additional information - Baseline Sound Survey |
Application |
Documents |
10/07/2021 |
Attachment P - Visual and Glare Impact Assessment |
Application |
Application |
10/07/2021 |
Attachment F - 2021 Rare Plant Survey Report |
Application |
Application |
10/07/2021 |
Badger Mountain Original Application Cover Letter |
Application |
Application |
10/07/2021 |
Attachment G - 2021 Wildlife and Habitat Survey Report |
Application |
Application |
10/07/2021 |
Attachment H - Geotechnical Engineering Reports |
Application |
Application |
10/07/2021 |
Attachment I - Wetland Delineation Report |
Application |
Application |
10/07/2021 |
Attachment J - Preliminary Stormwater Management Plan |
Application |
Application |
10/07/2021 |
Badger Mountain Original Application Main |
Application |
Application |
10/07/2021 |
Attachment K - Preliminary Hydrology Report |
Application |
Application |
10/07/2021 |
Attachment A - Maps |
Application |
Map |