You are here

Home » EFSEC Document » Kittitas Valley Wind Power Project

The Draft Transmission Programmatic Environmental Impact Statement (EIS) was released on March 31, 2025. To review the document visit the Transmission PEIS webpage
There has been an extension to comment on the Draft PEIS until May 15th. 

The Carriger Solar Draft Order #899 is available for comment April 29th through May 1st 11:59 pm. You can see the Draft Order under the "Orders" header towards the bottom of the Carriger Solar webpage.  

There are two Special Meetings for the Carriger Solar project set for May 5th and May 6th. For more information, visit the Carriger Solar webpage

If you would like to submit a comment for either of the above visit our comment database: https://comments.efsec.wa.gov

Kittitas Valley Wind Power Project

Kittitas Valley Wind Power Project - EDP Renewables North America, LLC - Docket:180298

Process Type Document Group(s) Document link File Date Document Set
SEPA Final EIS Section 3.7 SocioEconomics 02/01/2007 00021
Final Environmental Impact Statement Sections for the...
SEPA Final EIS Section 3.9 Visual Resources 02/01/2007 00021
Final Environmental Impact Statement Sections for the...
SEPA Final EIS Section 3 Affected Environment, Impacts, and Mitigation Measures 02/01/2007 00021
Final Environmental Impact Statement Sections for the...
SEPA Final EIS Section 4 References 02/01/2007 00021
Final Environmental Impact Statement Sections for the...
SEPA Final EIS Section 5 Acronyms and Abbreviations 02/01/2007 00021
Final Environmental Impact Statement Sections for the...
SEPA Final EIS Section 6 Distribution List 02/01/2007 00021
Final Environmental Impact Statement Sections for the...
SEPA Final EIS Section 7 List of Preparers 02/01/2007 00021
Final Environmental Impact Statement Sections for the...
SEPA Final EIS Cover Letter 02/01/2007 00021
Final Environmental Impact Statement Sections for the...
SEPA Final EIS Factsheet 02/07/2007 00021
Final Environmental Impact Statement Sections for the...
SEPA Final EIS Section 1 Table 1.5 Summary of Potential Impacts of Offsite Alternatives 02/01/2007 00021
Final Environmental Impact Statement Sections for the...
SEPA Final EIS Section 1 Table 1.4 Summary of Impacts and Mitigation 02/01/2007 00021
Final Environmental Impact Statement Sections for the...
SEPA Final EIS Table of Contents 02/01/2007 00021
Final Environmental Impact Statement Sections for the...
SEPA Final EIS Fig 3.13-1 Fire District Map 02/01/2007 00022
Location Maps for Kittitas County Wind Power Project
SEPA Final EIS Figure 2-18 Desert Claim Proposed Site Layout 02/01/2007 00022
Location Maps for Kittitas County Wind Power Project
SEPA Final EIS Figure 3.10-1 Existing Average Daily Traffic Volumes for 2001 02/01/2007 00022
Location Maps for Kittitas County Wind Power Project
SEPA Final EIS Figure 3.10-2 Bowers Field Protected Airspace with Existing Visual Flight Rules Traffic Pattern 02/01/2007 00022
Location Maps for Kittitas County Wind Power Project
SEPA Final EIS Figure 3.11-1 Kittitas Valley Area Wind Rose 02/01/2007 00022
Location Maps for Kittitas County Wind Power Project
SEPA Final EIS Figure 3.12-1 Noise Monitoring Locations 02/01/2007 00022
Location Maps for Kittitas County Wind Power Project
SEPA Final EIS Figure 3.13-1 Fire Districts 02/01/2007 00022
Location Maps for Kittitas County Wind Power Project
SEPA Final EIS Figure 3.14-1 Cumulative Study area for Kittitas Valley, Desert Claim, & Wild Horse Wind Power Projects 02/01/2007 00022
Location Maps for Kittitas County Wind Power Project
SEPA Final EIS Figure 3.14-2 Photograph Locations for Cumulative Analysis 02/01/2007 00022
Location Maps for Kittitas County Wind Power Project
SEPA Final EIS Figure 3.14-3 Viewpoint 1: Existing Conditions 02/01/2007 00022
Location Maps for Kittitas County Wind Power Project
SEPA Final EIS Figure 3.14-4 Viewpoint 1: Simulated Conditions Kittitas Valley Wind Power Project 02/01/2007 00022
Location Maps for Kittitas County Wind Power Project
SEPA Final EIS Figure 3.14-5 Simulated Conditions Desert Claim Wind Power Project 02/01/2007 00022
Location Maps for Kittitas County Wind Power Project
SEPA Final EIS Figure 3.14-6 Viewpoint 1: Simulated Conditions Cumulative Scenario 02/01/2007 00022
Location Maps for Kittitas County Wind Power Project
SEPA Final EIS Figure 3.14-7 Viewpoint 2: Existing Conditions 02/01/2007 00022
Location Maps for Kittitas County Wind Power Project
SEPA Final EIS Figure 3.14-8 Viewpoint 2: Simulated Conditions Cumulative Scenario 02/01/2007 00022
Location Maps for Kittitas County Wind Power Project
SEPA Final EIS Figure 3.1-1 Geotechnical Test Pit and Fault Locations 02/01/2007 00022
Location Maps for Kittitas County Wind Power Project
SEPA Final EIS Figure 3.1-2 Soils 02/01/2007 00022
Location Maps for Kittitas County Wind Power Project
SEPA Final EIS Figure 3.2-1 Vegetation Types 02/01/2007 00022
Location Maps for Kittitas County Wind Power Project
SEPA Final EIS Figure 3.2-2 Stream Survey Locations 02/01/2007 00022
Location Maps for Kittitas County Wind Power Project
SEPA Final EIS Figure 3.2-3 Approximate Perches and Flight Paths of Bald Eagles 02/01/2007 00022
Location Maps for Kittitas County Wind Power Project
SEPA Final EIS Figure 3.2-4 Approximate Raptor Nest Locations 02/01/2007 00022
Location Maps for Kittitas County Wind Power Project
SEPA Final EIS Figure 3.2-5 Mule Deer and Elk Winter Ranges 02/01/2007 00022
Location Maps for Kittitas County Wind Power Project
SEPA Final EIS Figure 3.4-1 1996-2000 Lightning Flash Density 02/01/2007 00022
Location Maps for Kittitas County Wind Power Project
SEPA Final EIS Figure 3.4-2 Typical Electromagnetic Levels for Transmission Lines 02/01/2007 00022
Location Maps for Kittitas County Wind Power Project
SEPA Final EIS Figure 3.6-1 Existing Land Use 02/01/2007 00022
Location Maps for Kittitas County Wind Power Project
SEPA Final EIS Figure 3.6-2 Existing Zoning 02/01/2007 00022
Location Maps for Kittitas County Wind Power Project
SEPA Final EIS Figure 3.6-3 Recreational Areas 02/01/2007 00022
Location Maps for Kittitas County Wind Power Project
SEPA Final EIS Figure 3.7-1 Construction Employment Schedule 02/01/2007 00022
Location Maps for Kittitas County Wind Power Project
SEPA Final EIS Figure 3.9-15 Proposed FAA Nighttime Lighting of Turbines 02/01/2007 00022
Location Maps for Kittitas County Wind Power Project
SEPA Final EIS Figure 3.9-1 Photograph Locations Outside Project Area 02/01/2007 00022
Location Maps for Kittitas County Wind Power Project
SEPA Final EIS Figure 3.9-2 Photograph Locations Within Project Area 02/01/2007 00022
Location Maps for Kittitas County Wind Power Project
SEPA Final EIS Figure 3.9-6 Proposed FAA Nighttime Lighting of Turbines 02/01/2007 00022
Location Maps for Kittitas County Wind Power Project
SEPA Letter Cover Letter 12/12/2003 00029
Draft Environmental Impact Statement for Kittitas Valley...
SEPA Report Appendix A Oct 2003 Final Report - Cumulative Impacts Analysis For Avain Resources from Proposed Wind Projects in Kittitas Co., WA 10/01/2003 00020
Final Environmental Impact Statement Appendices for...
SEPA Report Appendix B Nov 2005 Shadow Flicker Simulations 11/01/2005 00020
Final Environmental Impact Statement Appendices for...

Pages