The Draft Transmission Programmatic Environmental Impact Statement (EIS) was released on March 31, 2025. To review the document visit the Transmission PEIS webpage
There has been an extension to comment on the Draft PEIS until May 15th. 

The Carriger Solar Draft Order #899 is available for comment April 29th through May 1st 11:59 pm. You can see the Draft Order under the "Orders" header towards the bottom of the Carriger Solar webpage.  

There are two Special Meetings for the Carriger Solar project set for May 5th and May 6th. For more information, visit the Carriger Solar webpage

If you would like to submit a comment for either of the above visit our comment database: https://comments.efsec.wa.gov

EFSEC Document Set

Document Search

Chehalis Generation Facility - PacifiCorp

Adjudication

Council Resolutions for the Chehalis Generation Facility

File Datesort descending Document Process Type
08/10/1998 Resolution 292 Preliminary Site Preparation Adjudication Resolutions
11/12/2002 Resolution 301 Water Use Mitigation Adjudication Resolutions
03/10/2003 Resolution 304 Water Use Mitigation - Hamilton Water Rights Adjudication Resolutions
07/27/2005 Notice of the Governor's Decision Recommendation to Governor Notice
02/01/2007 Figure 3.1-1 Geotechnical Test Pit and Fault Locations SEPA Final EIS
02/01/2007 Figure 2-18 Desert Claim Proposed Site Layout SEPA Final EIS
02/01/2007 Figure 2-11 Manastash Ridge SEPA Documents
02/01/2007 Figure 3.6-3 Recreational Areas SEPA Final EIS
02/01/2007 Figure 3.10-1 Existing Average Daily Traffic Volumes for 2001 SEPA Final EIS
02/01/2007 Figure 2-17 Wild Horse Wind Power Project Proposed Site Layout Most Likely Scenario SEPA Documents
02/01/2007 Figure 2-7 Alternative A Site Layout SEPA Documents
02/01/2007 Figure 3.14-8 Viewpoint 2: Simulated Conditions Cumulative Scenario SEPA Final EIS
02/01/2007 Figure 2-10 Springwood Ranch SEPA Documents
02/01/2007 Figure 2-9 Swauk Valley Ranch SEPA Documents
02/01/2007 Figure 2-16 Springwood Ranch Proposed Site Layout SEPA Documents
02/01/2007 Figure 3.6-2 Existing Zoning SEPA Final EIS
02/01/2007 Figure 3.14-7 Viewpoint 2: Existing Conditions SEPA Final EIS
02/01/2007 Figure 1-2 Project Site Map SEPA Documents
02/01/2007 Figure 2-8 Offsite Wind Power Project Locations SEPA Documents
02/01/2007 Figure 2-15 Swauk Valley Ranch Proposed Site Layout SEPA Documents
02/01/2007 Figure 3.6-1 Existing Land Use SEPA Final EIS
02/01/2007 Figure 3.14-6 Viewpoint 1: Simulated Conditions Cumulative Scenario SEPA Final EIS
02/01/2007 Figure 1.1 Vicinity Map SEPA Documents
02/01/2007 Figure 2-6 Comparison of Various Wind Turbine Technologies SEPA Documents
02/01/2007 Figure 2-14 Quilomene SEPA Documents
02/01/2007 Figure 3.4-2 Typical Electromagnetic Levels for Transmission Lines SEPA Final EIS
02/01/2007 Figure 3.14-5 Simulated Conditions Desert Claim Wind Power Project SEPA Final EIS
02/01/2007 Figure 3.9-15 Proposed FAA Nighttime Lighting of Turbines SEPA Final EIS
02/01/2007 Figure 2-5 Electrical and Communications System SEPA Documents
02/01/2007 Figure 2-13 Skookumchuck Creek SEPA Documents
02/01/2007 Figure 3.4-1 1996-2000 Lightning Flash Density SEPA Final EIS
02/01/2007 Figure 3.14-4 Viewpoint 1: Simulated Conditions Kittitas Valley Wind Power Project SEPA Final EIS
02/01/2007 Figure 3.9-6 Proposed FAA Nighttime Lighting of Turbines SEPA Final EIS
02/01/2007 Figure 2-4 Typical Nacelle SEPA Documents
02/01/2007 Figure 2-12 Boylston Mountains SEPA Documents
02/01/2007 Figure 3.2-5 Mule Deer and Elk Winter Ranges SEPA Final EIS
02/01/2007 Figure 3.14-3 Viewpoint 1: Existing Conditions SEPA Final EIS
02/01/2007 Figure 3.9-2 Photograph Locations Within Project Area SEPA Final EIS
02/01/2007 Figure 3.13-1 Fire Districts SEPA Final EIS
02/01/2007 Figure 2-3 Typical Modern Three-Bladed Upwind Turbine Generator SEPA Documents