You are here

Home » EFSEC Document » Columbia Generating Station » Columbia Generating Station / Compliance » Columbia Generating Station / Compliance / Letter

The Draft Transmission Programmatic Environmental Impact Statement (EIS) was released on March 31, 2025. To review the document visit the Transmission PEIS webpage
There has been an extension to comment on the Draft PEIS until May 15th. If you would like to submit a comment visit our comment database: https://comments.efsec.wa.gov

There are two Special Meetings for the Carriger Solar project set for May 5th and May 6th. For more information, visit the Carriger Solar webpage

Columbia Generating Station / Compliance / Letter

Columbia Generating Station - - Docket:180299

Process Type Document Group(s) Document link File Date Document Set
Compliance Letter Columbia Generating Station Evaporation Pond Line Break Notification 06/07/2018 00008
Columbia Generating Station Evaporation Pond Line Break...
Compliance Letter Cover Letter 07/18/2018 00013
Updated Operation and Maintenance Manual for Stormwater/...
Compliance Letter NPDES Approval Groundwater Mounding Study 07/26/2018 00022
Documents Related to NPDES Groundwater Mounding Study...