You are here

Home » EFSEC Activity (last 90 days)

EFSEC Activity (last 90 days)

Energy Facility Document Date Document
Horse Heaven Wind Farm 11/29/2023 Mitigation Presentation - Final EIS Special Meeting
Horse Heaven Wind Farm 11/28/2023 Agenda - Final EIS Special Meeting
Horse Heaven Wind Farm 11/16/2023 Notice - Final EIS Special Meeting
EFSEC general documents 11/15/2023 November 15, 2023 Council Meeting Agenda
EFSEC general documents 11/15/2023 November 15, 2023 Council Meeting Packet
Horse Heaven Wind Farm 11/15/2023 November 15 2023 FEIS Presentation
Horse Heaven Wind Farm 11/13/2023 Hoja Informativa - Declaración Final de Impacto Ambiental
Horse Heaven Wind Farm 11/08/2023 Appendix G - Shadow Flicker Analysis Memo (Revised)
Horse Heaven Wind Farm 11/08/2023 Appendix T - Notice of Intent for NPDES Permit
Horse Heaven Wind Farm 11/08/2023 Final ASC - Redline (Redacted)
Horse Heaven Wind Farm 11/08/2023 Appendix H - Glare Analysis Report
Horse Heaven Wind Farm 11/08/2023 Appendix U - Consultation
Horse Heaven Wind Farm 11/08/2023 Final ASC
Horse Heaven Wind Farm 11/08/2023 Appendix L - Draft Wildlife Habitat Mitigation Plan - Redline (Redacted)
Horse Heaven Wind Farm 11/08/2023 Appendix I - Wetland and Other Waters Delineation Report (Revised Aug 2021)
Horse Heaven Wind Farm 11/08/2023 Appendix V - TLG Transportation Study
Horse Heaven Wind Farm 11/08/2023 Response Letter RE Special Meeting
Horse Heaven Wind Farm 11/08/2023 Appendix L - Draft Wildlife Habitat Mitigation Plan (Redacted)
Horse Heaven Wind Farm 11/08/2023 Appendix J - Water Source Documentation
Horse Heaven Wind Farm 11/08/2023 Appendix W - Air Quality Dispersion Modeling Evaluation (New)
Horse Heaven Wind Farm 11/08/2023 Appendix M -Bird and Bat Conservation Strategy (Redacted)
Horse Heaven Wind Farm 11/08/2023 Appendix N - Revegetation and Noxious Weed Control Plan
Horse Heaven Wind Farm 11/08/2023 Appendix W - Air Quality Dispersion Modeling Evaluation (New) - Redline
Horse Heaven Wind Farm 11/08/2023 Appendix A - Decommissioning Plan
Horse Heaven Wind Farm 11/08/2023 Appendix O - Acoustics Reports
Horse Heaven Wind Farm 11/08/2023 Appendix X - Traffic Impact Analysis
Horse Heaven Wind Farm 11/08/2023 Appendix B - Preliminary Geotechnical Investigation Report
Horse Heaven Wind Farm 11/08/2023 Appendix P - Draft Emergency Response Plan (Revised)
Horse Heaven Wind Farm 11/08/2023 Appendix X - Traffic Impact Analysis - Redline
Horse Heaven Wind Farm 11/08/2023 Appendix C - SEPA checklist
Horse Heaven Wind Farm 11/08/2023 Appendix P - Draft Emergency Response Plan (Revised) Redline
Horse Heaven Wind Farm 11/08/2023 Appendix D - County Zoning Determination
Horse Heaven Wind Farm 11/08/2023 Appendix Q - Visual Simulations (Revised) Redline
Horse Heaven Wind Farm 11/08/2023 Appendix E - Turbine and Access Road Displacement
Horse Heaven Wind Farm 11/08/2023 Appendix Q - Visual Simulations (Revised)
Horse Heaven Wind Farm 11/08/2023 Appendix F - Project Lease Boundary Landowner List with Legal Descriptions
Horse Heaven Wind Farm 11/08/2023 Appendix S - Economic Impact Study
Horse Heaven Wind Farm 11/07/2023 890 - Horse Heaven TCC Petition for Reconsideration
Horse Heaven Wind Farm 10/31/2023 Notice - Final EIS
Horse Heaven Wind Farm 10/31/2023 Ch.3 Affected Environment - Final EIS
Horse Heaven Wind Farm 10/31/2023 Appendix 3.10-2 Updated SWCA Visual Study - Final EIS
Horse Heaven Wind Farm 10/31/2023 Ch.4 Analysis of Potential Impacts - Final EIS
Horse Heaven Wind Farm 10/31/2023 Appendix 3.16-1 Proximity to Environmental Stressors - Final EIS
Horse Heaven Wind Farm 10/31/2023 Ch.5 Cumulative Impacts - Final EIS
Horse Heaven Wind Farm 10/31/2023 Appendix 4.3-1 Air Quality Emission Calculations - Final EIS
Horse Heaven Wind Farm 10/31/2023 Final EIS - FULL DOCUMENT
Horse Heaven Wind Farm 10/31/2023 Ch.6 References - Final EIS
Horse Heaven Wind Farm 10/31/2023 Appendix 4.3-2 Tetra Tech 2023 Air Quality Dispersion Modeling Evaluation - Final EIS
Horse Heaven Wind Farm 10/31/2023 Cover letter - Final EIS
Horse Heaven Wind Farm 10/31/2023 Ch.7 List of Preparers - Final EIS
Horse Heaven Wind Farm 10/31/2023 Appendix 4.6-1 Wildlife Collision Study - Final EIS
Horse Heaven Wind Farm 10/31/2023 Table of Contents - Final EIS
Horse Heaven Wind Farm 10/31/2023 Ch.8 Glossary - Final EIS
Horse Heaven Wind Farm 10/31/2023 Appendix 4.6-1 Wildlife Collision Study - Final EIS
Horse Heaven Wind Farm 10/31/2023 Title Page - Final EIS
Horse Heaven Wind Farm 10/31/2023 Ch.9 Distribution - Final EIS
Horse Heaven Wind Farm 10/31/2023 Appendix 4.10-1 Glare Analysis Report - Final EIS
Horse Heaven Wind Farm 10/31/2023 Fact Sheet - Final EIS
Horse Heaven Wind Farm 10/31/2023 Ch.10 Comments & Responses on Draft EIS - Final EIS
Horse Heaven Wind Farm 10/31/2023 Appendix 4.11-1 Noise Modeling Assessment - Final EIS
Horse Heaven Wind Farm 10/31/2023 Executive Summary - Final EIS
Horse Heaven Wind Farm 10/31/2023 Appendix 3.5-1 Habitat Photos - Final EIS
Horse Heaven Wind Farm 10/31/2023 Appendix 4.16-1 Economic Impact Analysis Methodology - Final EIS
Horse Heaven Wind Farm 10/31/2023 Ch.1 Project Background - Final EIS
Horse Heaven Wind Farm 10/31/2023 Appendix 3.8-1 LSU Consistency Analysis - Final EIS
Horse Heaven Wind Farm 10/31/2023 Appendix 10-1 Comments and Responses on Draft EIS - Final EIS
Horse Heaven Wind Farm 10/31/2023 Ch.2 Proposed Action and Alternatives - Final EIS
Horse Heaven Wind Farm 10/31/2023 Appendix 3.10-1 Sky Glow Comparisons - Final EIS
Horse Heaven Wind Farm 10/30/2023 Judge Torem's Response to Requests for Oral Argument
Horse Heaven Wind Farm 10/27/2023 Order Denying Yakama Nation Petition for Reconsideration
Horse Heaven Wind Farm 10/24/2023 Councilmember Sandison Resignation
Badger Mountain 10/23/2023 Data Request 4 Letter
Badger Mountain 10/23/2023 Data Request 4 Maps
Desert Claim 10/18/2023 Resolution 353 - Desert Claim SCA Amendment 2
EFSEC general documents 10/18/2023 October 18, 2023 Council Meeting Packet
EFSEC general documents 10/18/2023 October 18, 2023 Council Meeting Agenda
EFSEC general documents 10/18/2023 October 18, 2023 Council Meeting Minutes
Horse Heaven Wind Farm 10/18/2023 October 18 2023 FEIS Presentation
Horse Heaven Wind Farm 10/13/2023 The Yakama Nation Post-Hearing Brief
Horse Heaven Wind Farm 10/13/2023 Benton County Post-Hearing Brief
Horse Heaven Wind Farm 10/13/2023 Scout Clean Energy Post-Hearing Brief
Horse Heaven Wind Farm 10/13/2023 Tri-Cities Cares Post-Hearing Brief
Wautoma Solar 10/10/2023 Second Extension Request Letter
Horse Heaven Wind Farm 10/02/2023 T.C.C. Petition for Reconsideration of Order on Post-Hearing Motions to Supplement Record; Denying Further Adjudicative Hearings for Cross-Examination of Supplemental and Rebuttal Witness Testimony
Horse Heaven Wind Farm 09/28/2023 EXH-5503_R - Rich Simon Rebuttal
Horse Heaven Wind Farm 09/28/2023 EXH-5602_T - Pre-Filed Testimony of TCC Witness Pam Minelli
Horse Heaven Wind Farm 09/28/2023 EXH-5900_R - Pre-Filed Testimony of TCC Witness Richard Hagar
Horse Heaven Wind Farm 09/28/2023 Refiled By Order As Public Comment: EXH-5604_R - Pre-Filed Testimony of TCC Witness Kevin Leary
Horse Heaven Wind Farm 09/28/2023 EXH-3017_X Erik Jansen Cross Examination (Redacted)
Horse Heaven Wind Farm 09/28/2023 Refiled By Order As Public Comment: EXH-5608_R - Pre-Filed Testimony of TCC Witness Frank Kliewer
Horse Heaven Wind Farm 09/28/2023 EXH-3019_X Erik Jansen Cross Examination (Redacted)
Horse Heaven Wind Farm 09/28/2023 EXH-1000_T_REVISED - Direct Testimony and Attachments of Brynn Guthrie on behalf of SCE
Horse Heaven Wind Farm 09/28/2023 EXH-1018 - Devine-Wright (2004) Article
Horse Heaven Wind Farm 09/28/2023 EXH-4004_T - Pre-Filed Direct Testimony of Jerry Meninick
Horse Heaven Wind Farm 09/28/2023 EXH-5303_T - Pre-Filed Direct Testimony of TCC Witness Paul Krupin
Horse Heaven Wind Farm 09/28/2023 EXH-5307_R - Pre-Filed Direct Testimony of TCC Witness Paul Krupin - Graphics
Carriger Solar 09/25/2023 889 - Carriger Solar Land Use Order
Horse Heaven Wind Farm 09/25/2023 Yakama Nation Petition for Reconsideration of Order 888
Horse Heaven Wind Farm 09/25/2023 Scout Clean Energy Letter - Project Update Responding to Adjudication Concerns
Horse Heaven Wind Farm 09/25/2023 Layout Option 1

Pages