The Draft Transmission Programmatic Environmental Impact Statement (EIS) was released on March 31, 2025. To review the document visit the Transmission PEIS webpage
There has been an extension to comment on the Draft PEIS until May 15th. 

The Carriger Solar Draft Order #899 is available for comment April 29th through May 1st 11:59 pm. You can see the Draft Order under the "Orders" header towards the bottom of the Carriger Solar webpage.  

There are two Special Meetings for the Carriger Solar project set for May 5th and May 6th. For more information, visit the Carriger Solar webpage

If you would like to submit a comment for either of the above visit our comment database: https://comments.efsec.wa.gov

Horse Heaven Wind Farm

Horse Heaven Wind Farm - Horse Heaven Wind Farm - Docket:210011

Process Type Document Group(s) Document link File Date Document Set
SEPA Draft EIS Table of Contents 12/16/2022
SEPA Draft EIS Chapter 9 - Distribution 12/16/2022
SEPA Draft EIS Chapter 3 - Affected Environment 12/16/2022
SEPA Draft EIS Appendix 3.10-2 SWCA 2022 Visual Impact Assessment Report 12/16/2022
SEPA Draft EIS FECHA DE PUBLICACIÓN DECLARACIÓN PRELIMINAR DE IMPACTO AMBIENTAL 12/22/2022
SEPA Draft EIS HOJA INFORMATIVA 12/22/2022
SEPA Draft EIS Complete DRAFT EIS Document 12/16/2022 001
SEPA Final EIS Final EIS - FULL DOCUMENT 10/31/2023 FEIS
SEPA Final EIS Appendix 4.11-1 Noise Modeling Assessment - Final EIS 10/31/2023 FEIS
SEPA Final EIS Appendix 4.16-1 Economic Impact Analysis Methodology - Final EIS 10/31/2023 FEIS
SEPA Final EIS Appendix 10-1 Comments and Responses on Draft EIS - Final EIS 10/31/2023 FEIS
SEPA Final EIS Ch.1 Project Background - Final EIS 10/31/2023 FEIS
SEPA Final EIS Ch.2 Proposed Action and Alternatives - Final EIS 10/31/2023 FEIS
SEPA Final EIS Ch.3 Affected Environment - Final EIS 10/31/2023 FEIS
SEPA Final EIS Ch.4 Analysis of Potential Impacts - Final EIS 10/31/2023 FEIS
SEPA Final EIS Ch.5 Cumulative Impacts - Final EIS 10/31/2023 FEIS
SEPA Final EIS Ch.6 References - Final EIS 10/31/2023 FEIS
SEPA Final EIS Ch.7 List of Preparers - Final EIS 10/31/2023 FEIS
SEPA Final EIS Ch.8 Glossary - Final EIS 10/31/2023 FEIS
SEPA Final EIS Ch.9 Distribution - Final EIS 10/31/2023 FEIS
SEPA Final EIS Ch.10 Comments & Responses on Draft EIS - Final EIS 10/31/2023 FEIS
SEPA Final EIS Appendix 3.5-1 Habitat Photos - Final EIS 10/31/2023 FEIS
SEPA Final EIS Appendix 3.8-1 LSU Consistency Analysis - Final EIS 10/31/2023 FEIS
SEPA Final EIS Appendix 3.10-1 Sky Glow Comparisons - Final EIS 10/31/2023 FEIS
SEPA Final EIS Appendix 3.10-2 Updated SWCA Visual Study - Final EIS 10/31/2023 FEIS
SEPA Final EIS Appendix 3.16-1 Proximity to Environmental Stressors - Final EIS 10/31/2023 FEIS
SEPA Final EIS Appendix 4.3-1 Air Quality Emission Calculations - Final EIS 10/31/2023 FEIS
SEPA Final EIS Appendix 4.3-2 Tetra Tech 2023 Air Quality Dispersion Modeling Evaluation - Final EIS 10/31/2023 FEIS
SEPA Final EIS Appendix 4.6-1 Wildlife Collision Study - Final EIS 10/31/2023 FEIS
SEPA Final EIS Appendix 4.6-1 Wildlife Collision Study - Final EIS 10/31/2023 FEIS
SEPA Final EIS Appendix 4.10-1 Glare Analysis Report - Final EIS 10/31/2023 FEIS
SEPA Letter Cover Letter 12/16/2022
SEPA Letter Data Request 1 letter 05/27/2021 00043
Data Request 1
SEPA Letter Data Request 2 07/16/2021 00044
Data Request 2
SEPA Letter Data Request 3 07/22/2021 00045
Data Request 3
SEPA Letter Applicant letter regarding Determination of Significance 04/05/2021 00056
Applicant letter regarding Determination of Significance
SEPA Letter Data Request 7 03/22/2023 001
SEPA Letter Cover letter - Final EIS 10/31/2023 FEIS
SEPA Letter Table of Contents - Final EIS 10/31/2023 FEIS
SEPA Letter Title Page - Final EIS 10/31/2023 FEIS
SEPA Map Data Request 2 Topographical Earth Maps 09/10/2021 00044
Data Request 2
SEPA Map Figure X0.1-1 Turbine Layout Option 1 01/22/2024 FEIS
SEPA Map Figure X0.1-2 Turbine Layout Option 2 01/22/2024 FEIS
SEPA Map Council Exclusion Considerations 1 through 4 01/22/2024 FEIS
SEPA Map Figure X0.2-1 Turbine Layout Option 1 01/22/2024 FEIS
SEPA Map Figure X0.2-2 Turbine Layout Option 2 01/22/2024 FEIS
SEPA Map Figure X0.3-1 Turbine Layout Option 1 01/22/2024 FEIS
SEPA Map Figure X0.3-2 Turbine Layout Option 2 01/22/2024 FEIS
SEPA Map Figure X0.4-1 Turbine Layout Option 1 01/22/2024 FEIS
SEPA Map Figure X0.4-2 Turbine Layout Option 2 01/22/2024 FEIS