You are here

Home » EFSEC Document » Goose Prairie Solar » Goose Prairie Solar / SEPA » Goose Prairie Solar / SEPA / Documents

The Draft Transmission Programmatic Environmental Impact Statement (EIS) was released on March 31, 2025. To review the document visit the Transmission PEIS webpage
There has been an extension to comment on the Draft PEIS until May 15th. 

The Carriger Solar Draft Order #899 is available for comment April 29th through May 1st 11:59 pm. You can see the Draft Order under the "Orders" header towards the bottom of the Carriger Solar webpage.  

There are two Special Meetings for the Carriger Solar project set for May 5th and May 6th. For more information, visit the Carriger Solar webpage

If you would like to submit a comment for either of the above visit our comment database: https://comments.efsec.wa.gov

Goose Prairie Solar / SEPA / Documents

Goose Prairie Solar - One Energy Renewables - Docket:210012

Process Type Document Group(s) Document link File Date Document Set
SEPA Documents SEPA Checklist 06/24/2021 00034
Mitigated Determination of Non-significance (MDNS)
SEPA Documents Mitigated Determination of Non-significance 06/24/2021 00034
Mitigated Determination of Non-significance (MDNS)
SEPA Documents [No group] 20210624_Staff Memo 00034
Mitigated Determination of Non-significance (MDNS)
SEPA Documents Staff memo 06/24/2021 00034
Mitigated Determination of Non-significance (MDNS)
SEPA Documents Revised MDNS 07/30/2021 00037
Revised MDNS documents