You are here

Home » EFSEC Document » Columbia Solar » Columbia Solar / Permits

The Draft Transmission Programmatic Environmental Impact Statement (EIS) was released on March 31, 2025. To review the document visit the Transmission PEIS webpage
There has been an extension to comment on the Draft PEIS until May 15th. 

The Carriger Solar Draft Order #899 is available for comment April 29th through May 1st 11:59 pm. You can see the Draft Order under the "Orders" header towards the bottom of the Carriger Solar webpage.  

There are two Special Meetings for the Carriger Solar project set for May 5th and May 6th. For more information, visit the Carriger Solar webpage

If you would like to submit a comment for either of the above visit our comment database: https://comments.efsec.wa.gov

Columbia Solar / Permits

Columbia Solar - TUUSSO Energy - Docket:170823

Process Type Document Group(s) Document link File Date Document Set
Permits Legal Ad Columbia Solar Stormwater permit public comment Legal Ad - CAMAS 05/19/2021 00252
Legal ad Stormwater Permit Public comment period for Camas...
Permits Legal Ad Columbia Solar Stormwater permit public comment Legal Ad - PENSTEMON 05/19/2021 00252
Legal ad Stormwater Permit Public comment period for Camas...
Permits Legal Ad Columbia Solar Stormwater permit public comment Legal Ad - URTICA 05/19/2021 00252
Legal ad Stormwater Permit Public comment period for Camas...
Permits Permit Tuusso JARPA Application Form 12/22/2017 00073
Joint Aquatic Resources Permit Application (JARPA) on...
Permits Report Tuusso JARPA Application Attachments 07/10/2017 00073
Joint Aquatic Resources Permit Application (JARPA) on...