The Draft Transmission Programmatic Environmental Impact Statement (EIS) was released on March 31, 2025. To review the document visit the Transmission PEIS webpage
There has been an extension to comment on the Draft PEIS until May 15th. 

The Carriger Solar Draft Order #899 is available for comment April 29th through May 1st 11:59 pm. You can see the Draft Order under the "Orders" header towards the bottom of the Carriger Solar webpage.  

There are two Special Meetings for the Carriger Solar project set for May 5th and May 6th. For more information, visit the Carriger Solar webpage

If you would like to submit a comment for either of the above visit our comment database: https://comments.efsec.wa.gov

EFSEC Document Set

Document Search

Whistling Ridge Energy Project - Whistling Ridge Energy LLC

SEPA

Draft Environmental Impact Statement for Whistling Ridge

File Datesort descending Document Process Type
05/01/2010 Appendix D SEPA Draft EIS
05/01/2010 Cover Letter SEPA Draft EIS
05/01/2010 Appendix C SEPA Draft EIS
05/01/2010 Chapter 7 - Index SEPA Draft EIS
05/01/2010 Appendix B SEPA Draft EIS
05/01/2010 Chapter 6 - List of Preparers SEPA Draft EIS
05/01/2010 Chapter 5 SEPA Draft EIS
05/01/2010 Chapter 4 - Environmental Consultation SEPA Draft EIS
05/01/2010 Chapter 3 - Affected Environment SEPA Draft EIS
05/01/2010 Chapter 2 - Proposed Action and Alternatives SEPA Draft EIS
05/01/2010 Chapter 1 - Purpose and Need SEPA Draft EIS
05/01/2010 Appendix A SEPA Draft EIS
05/01/2010 Table of Contents SEPA Draft EIS
05/01/2010 Notice of extension SEPA Draft EIS
05/01/2010 Appendix F SEPA Draft EIS
05/01/2010 Figure 1-1 Project Location SEPA Draft EIS