11/05/2013 |
EF-131590 Scoping Comnts 102-150 |
|
Comment |
09/22/2008 |
Resolution 325 Transfer to PacifiCorp, Termination of TNA Merchant Project's Guaranty, and Approval of Revised Site Restoration Plan |
Adjudication |
Resolutions |
03/10/2003 |
Resolution 304 Water Use Mitigation - Hamilton Water Rights |
Adjudication |
Resolutions |
11/12/2002 |
Resolution 301 Water Use Mitigation |
Adjudication |
Resolutions |
08/10/1998 |
Resolution 292 Preliminary Site Preparation |
Adjudication |
Resolutions |
07/26/2018 |
NPDES Approval Groundwater Mounding Study |
Compliance |
Letter |
09/06/2018 |
Groundwater Mounding Study Scoping Calculations Report |
Compliance |
Report |
09/06/2018 |
Revised Dehalogenation Chemical Feed Project Engineering Report |
Compliance |
Report |
09/18/2018 |
Transcript |
Compliance |
Meeting Transcripts |
01/15/2019 |
January 15, 2019 Council Meeting Minutes |
Compliance |
Transcript |
03/19/2019 |
March 19 2019 Monthly Council Meeting Minutes |
Compliance |
Transcript |
04/16/2019 |
April 16, 2019 Monthly Council Meeting Minutes |
Compliance |
Transcript |
05/21/2019 |
May 21, 2019 Council Meeting Minutes |
Compliance |
Meeting Transcripts |
04/02/2021 |
General Comments 0001 - 0050 |
Compliance |
Comment |
04/02/2021 |
General comments 0051 - 0100 |
Compliance |
Comment |
04/02/2021 |
General comments 0101 - 0150 |
Compliance |
Comment |
04/02/2021 |
General comments 0151 - 0200 |
Compliance |
Comment |
04/02/2021 |
General comments 0201 - 0250 |
Compliance |
Comment |
04/02/2021 |
General comments 0251 - 0300 |
Compliance |
Comment |
04/02/2021 |
General comments 0301 - 0350 |
Compliance |
Comment |
06/08/2021 |
General comments 0351 - 0396 |
Compliance |
Comment |
02/04/2022 |
0061 |
Compliance |
Comment |
07/27/2005 |
Notice of the Governor's Decision |
Recommendation to Governor |
Notice |
02/01/2007 |
Figure 3.14-5 Simulated Conditions Desert Claim Wind Power Project |
SEPA |
Final EIS |
02/01/2007 |
Figure 3.9-15 Proposed FAA Nighttime Lighting of Turbines |
SEPA |
Final EIS |
02/01/2007 |
Figure 3.14-4 Viewpoint 1: Simulated Conditions Kittitas Valley Wind Power Project |
SEPA |
Final EIS |
02/01/2007 |
Figure 3.9-6 Proposed FAA Nighttime Lighting of Turbines |
SEPA |
Final EIS |
02/01/2007 |
Figure 3.9-2 Photograph Locations Within Project Area |
SEPA |
Final EIS |
02/01/2007 |
Figure 3.14-3 Viewpoint 1: Existing Conditions |
SEPA |
Final EIS |
02/01/2007 |
Figure 3.9-1 Photograph Locations Outside Project Area |
SEPA |
Final EIS |
02/01/2007 |
Figure 3.14-2 Photograph Locations for Cumulative Analysis |
SEPA |
Final EIS |
02/01/2007 |
Figure 3.7-1 Construction Employment Schedule |
SEPA |
Final EIS |
02/01/2007 |
Figure 3.14-1 Cumulative Study area for Kittitas Valley, Desert Claim, & Wild Horse Wind Power Projects |
SEPA |
Final EIS |
02/01/2007 |
Figure 3.1-2 Soils |
SEPA |
Final EIS |
02/01/2007 |
Figure 3.1-1 Geotechnical Test Pit and Fault Locations |
SEPA |
Final EIS |
02/01/2007 |
Figure 3.10-1 Existing Average Daily Traffic Volumes for 2001 |
SEPA |
Final EIS |
02/01/2007 |
Figure 2-9 Swauk Valley Ranch |
SEPA |
Documents |
02/01/2007 |
Figure 2-8 Offsite Wind Power Project Locations |
SEPA |
Documents |
02/01/2007 |
Figure 2-6 Comparison of Various Wind Turbine Technologies |
SEPA |
Documents |
02/01/2007 |
Figure 2-5 Electrical and Communications System |
SEPA |
Documents |