Tesoro Savage - Tesoro Savage Petroleum Terminal LLC

SEPA Scoping Comments #102 - #150.

File Date Document Processsort descending Type
11/05/2013 EF-131590 Scoping Comnts 102-150 Comment
09/22/2008 Resolution 325 Transfer to PacifiCorp, Termination of TNA Merchant Project's Guaranty, and Approval of Revised Site Restoration Plan Adjudication Resolutions
03/10/2003 Resolution 304 Water Use Mitigation - Hamilton Water Rights Adjudication Resolutions
11/12/2002 Resolution 301 Water Use Mitigation Adjudication Resolutions
08/10/1998 Resolution 292 Preliminary Site Preparation Adjudication Resolutions
07/26/2018 NPDES Approval Groundwater Mounding Study Compliance Letter
09/06/2018 Groundwater Mounding Study Scoping Calculations Report Compliance Report
09/06/2018 Revised Dehalogenation Chemical Feed Project Engineering Report Compliance Report
09/18/2018 Transcript Compliance Meeting Transcripts
01/15/2019 January 15, 2019 Council Meeting Minutes Compliance Transcript
03/19/2019 March 19 2019 Monthly Council Meeting Minutes Compliance Transcript
04/16/2019 April 16, 2019 Monthly Council Meeting Minutes Compliance Transcript
05/21/2019 May 21, 2019 Council Meeting Minutes Compliance Meeting Transcripts
04/02/2021 General Comments 0001 - 0050 Compliance Comment
04/02/2021 General comments 0051 - 0100 Compliance Comment
04/02/2021 General comments 0101 - 0150 Compliance Comment
04/02/2021 General comments 0151 - 0200 Compliance Comment
04/02/2021 General comments 0201 - 0250 Compliance Comment
04/02/2021 General comments 0251 - 0300 Compliance Comment
04/02/2021 General comments 0301 - 0350 Compliance Comment
06/08/2021 General comments 0351 - 0396 Compliance Comment
02/04/2022 0061 Compliance Comment
07/27/2005 Notice of the Governor's Decision Recommendation to Governor Notice
02/01/2007 Figure 3.14-5 Simulated Conditions Desert Claim Wind Power Project SEPA Final EIS
02/01/2007 Figure 3.9-15 Proposed FAA Nighttime Lighting of Turbines SEPA Final EIS
02/01/2007 Figure 3.14-4 Viewpoint 1: Simulated Conditions Kittitas Valley Wind Power Project SEPA Final EIS
02/01/2007 Figure 3.9-6 Proposed FAA Nighttime Lighting of Turbines SEPA Final EIS
02/01/2007 Figure 3.9-2 Photograph Locations Within Project Area SEPA Final EIS
02/01/2007 Figure 3.14-3 Viewpoint 1: Existing Conditions SEPA Final EIS
02/01/2007 Figure 3.9-1 Photograph Locations Outside Project Area SEPA Final EIS
02/01/2007 Figure 3.14-2 Photograph Locations for Cumulative Analysis SEPA Final EIS
02/01/2007 Figure 3.7-1 Construction Employment Schedule SEPA Final EIS
02/01/2007 Figure 3.14-1 Cumulative Study area for Kittitas Valley, Desert Claim, & Wild Horse Wind Power Projects SEPA Final EIS
02/01/2007 Figure 3.1-2 Soils SEPA Final EIS
02/01/2007 Figure 3.1-1 Geotechnical Test Pit and Fault Locations SEPA Final EIS
02/01/2007 Figure 3.10-1 Existing Average Daily Traffic Volumes for 2001 SEPA Final EIS
02/01/2007 Figure 2-9 Swauk Valley Ranch SEPA Documents
02/01/2007 Figure 2-8 Offsite Wind Power Project Locations SEPA Documents
02/01/2007 Figure 2-6 Comparison of Various Wind Turbine Technologies SEPA Documents
02/01/2007 Figure 2-5 Electrical and Communications System SEPA Documents