You are here

Home » EFSEC Document Set » EFSEC Document Set

EFSEC Document Set

Document Search

Horse Heaven Wind Farm - Horse Heaven Wind Farm

SEPA

File Datesort ascending Document Process Type
01/31/2024 WDFW Comment Regarding Council Proposed Mitigations SEPA Comment
01/21/2024 LIUNA Comment Regarding Council Proposed Mitigations SEPA Comment
01/20/2024 Public Comments 0001 - 0050 SEPA Comment
01/20/2024 Public Comments 0051 - 0090 SEPA Comment
01/19/2024 Applicant Comment Regarding Council Proposed Mitigations SEPA Comment
02/04/2022 0061 Compliance Comment
06/08/2021 General comments 0351 - 0396 Compliance Comment
04/02/2021 General comments 0201 - 0250 Compliance Comment
04/02/2021 General comments 0251 - 0300 Compliance Comment
04/02/2021 General comments 0301 - 0350 Compliance Comment
04/02/2021 General Comments 0001 - 0050 Compliance Comment
04/02/2021 General comments 0051 - 0100 Compliance Comment
04/02/2021 General comments 0101 - 0150 Compliance Comment
04/02/2021 General comments 0151 - 0200 Compliance Comment
05/21/2019 May 21, 2019 Council Meeting Minutes Compliance Meeting Transcripts
04/16/2019 April 16, 2019 Monthly Council Meeting Minutes Compliance Transcript
03/19/2019 March 19 2019 Monthly Council Meeting Minutes Compliance Transcript
01/15/2019 January 15, 2019 Council Meeting Minutes Compliance Transcript
09/18/2018 Transcript Compliance Meeting Transcripts
09/06/2018 Groundwater Mounding Study Scoping Calculations Report Compliance Report
09/06/2018 Revised Dehalogenation Chemical Feed Project Engineering Report Compliance Report
07/26/2018 NPDES Approval Groundwater Mounding Study Compliance Letter
11/05/2013 EF-131590 Scoping Comnts 102-150 Comment
09/22/2008 Resolution 325 Transfer to PacifiCorp, Termination of TNA Merchant Project's Guaranty, and Approval of Revised Site Restoration Plan Adjudication Resolutions
02/01/2007 Figure 3.4-1 1996-2000 Lightning Flash Density SEPA Final EIS
02/01/2007 Figure 2-13 Skookumchuck Creek SEPA Documents
02/01/2007 Figure 3.14-4 Viewpoint 1: Simulated Conditions Kittitas Valley Wind Power Project SEPA Final EIS
02/01/2007 Figure 3.9-6 Proposed FAA Nighttime Lighting of Turbines SEPA Final EIS
02/01/2007 Figure 2-4 Typical Nacelle SEPA Documents
02/01/2007 Figure 3.2-5 Mule Deer and Elk Winter Ranges SEPA Final EIS
02/01/2007 Figure 2-12 Boylston Mountains SEPA Documents
02/01/2007 Figure 3.14-3 Viewpoint 1: Existing Conditions SEPA Final EIS
02/01/2007 Figure 3.9-2 Photograph Locations Within Project Area SEPA Final EIS
02/01/2007 Figure 3.13-1 Fire Districts SEPA Final EIS
02/01/2007 Figure 3.2-4 Approximate Raptor Nest Locations SEPA Final EIS
02/01/2007 Figure 2-3 Typical Modern Three-Bladed Upwind Turbine Generator SEPA Documents
02/01/2007 Figure 3.14-2 Photograph Locations for Cumulative Analysis SEPA Final EIS
02/01/2007 Figure 3.9-1 Photograph Locations Outside Project Area SEPA Final EIS
02/01/2007 Figure 3.11-1 Kittitas Valley Area Wind Rose SEPA Final EIS
02/01/2007 Figure 3.2-3 Approximate Perches and Flight Paths of Bald Eagles SEPA Final EIS

Pages