EFSEC Document Search
Filter documents by Facility or Post Date.
Document Group | Document Name | File Date | |
---|---|---|---|
Desert Claim | Picture 7 | 04/11/2018 | |
Desert Claim | Picture 8 | 04/11/2018 | |
Desert Claim | Picture 9 | 04/11/2018 | |
EFSEC general documents | Policy 15-01 Enforcement Guidance | 08/18/2015 | |
EFSEC general documents | Policy 15-01 Gravity Criteria Scoring Sheet | 08/18/2015 | |
EFSEC general documents | Policy 15-1 Gravity Criteria Notes | 08/15/2015 | |
EFSEC general documents | Policy 16-01 Delegation Authority | 03/04/2016 | |
Horse Heaven Wind Farm | Population Viability Analysis of Ferruginous Hawk (Buteo regalis) in Eastern Washington | 11/14/2022 | |
Tesoro Savage | port of vancouver reimbursement 2013 | 10/03/2013 | |
Desert Claim | Post-Hearing Conference Transcript | 07/22/2009 | |
Columbia Generating Station | Potable Water Report June 2018 | 07/09/2018 | |
Columbia Solar | Poulsen Land Use Comments (018) | 12/22/2017 | |
Cascade Renewable Transmission Project | Pre-App Info Meeting Cascade Renewable Power Point Presentation | 02/06/2024 | |
Cascade Renewable Transmission Project | Pre-App Info Meeting EFSEC Power Point Presentation | 02/06/2024 | |
Cascade Renewable Transmission Project | Pre-Application Info Meeting Notice | 01/24/2024 | |
Cascade Renewable Transmission Project | Pre-Application Plan | 12/20/2023 | |
Cascade Renewable Transmission Project | Pre-Application Request | 12/20/2023 | |
Horse Heaven Wind Farm | Pre-Hearing Conference Order #1 | 03/17/2023 | |
Horse Heaven Wind Farm | Pre-Hearing Conference Order #2 | 05/19/2023 | |
Horse Heaven Wind Farm | Pre-Hearing Conference Order #3 | 07/31/2023 |