EFSEC Document Search
Filter documents by Facility or Post Date.
Document Group | Document Name | File Date | |
---|---|---|---|
EFSEC general documents | February 23, 2023 Hop Hill Land Use Hearing Minutes - Corrected | 02/23/2023 | |
Horse Heaven Wind Farm | FECHA DE PUBLICACIÓN DECLARACIÓN PRELIMINAR DE IMPACTO AMBIENTAL | 12/22/2022 | |
Whistling Ridge Energy Project | FEIS Appendix H (Secured) | 08/01/2011 | |
Kittitas Valley Wind Power Project | Fig 3.13-1 Fire District Map | 02/01/2007 | |
Whistling Ridge Energy Project | Figure 1-1 Project Location | 05/01/2010 | |
Kittitas Valley Wind Power Project | Figure 1-2 Project Site Map | 02/01/2007 | |
Kittitas Valley Wind Power Project | Figure 1.1 Vicinity Map | 02/01/2007 | |
High Top and Ostrea Solar Project | Figure 2-1 Project location map | 10/03/2022 | |
Kittitas Valley Wind Power Project | Figure 2-1 Site Layout | 02/01/2007 | |
Kittitas Valley Wind Power Project | Figure 2-10 Springwood Ranch | 02/01/2007 | |
Kittitas Valley Wind Power Project | Figure 2-11 Manastash Ridge | 02/01/2007 | |
Kittitas Valley Wind Power Project | Figure 2-12 Boylston Mountains | 02/01/2007 | |
Kittitas Valley Wind Power Project | Figure 2-13 Skookumchuck Creek | 02/01/2007 | |
Kittitas Valley Wind Power Project | Figure 2-14 Quilomene | 02/01/2007 | |
Kittitas Valley Wind Power Project | Figure 2-15 Swauk Valley Ranch Proposed Site Layout | 02/01/2007 | |
Kittitas Valley Wind Power Project | Figure 2-16 Springwood Ranch Proposed Site Layout | 02/01/2007 | |
Kittitas Valley Wind Power Project | Figure 2-17 Wild Horse Wind Power Project Proposed Site Layout Most Likely Scenario | 02/01/2007 | |
Kittitas Valley Wind Power Project | Figure 2-18 Desert Claim Proposed Site Layout | 02/01/2007 | |
Kittitas Valley Wind Power Project | Figure 2-2 Typical Wind Turbine Dimensions | 02/01/2007 | |
Kittitas Valley Wind Power Project | Figure 2-3 Typical Modern Three-Bladed Upwind Turbine Generator | 02/01/2007 |