Assigned Site Specialist
John Barnes
Wallula Gap
Assigned CFE
Yuriy Korol
Appliant: OneEnergy Development LLC
Facility: 60-megawatt (MW) solar photovoltaic (PV) project with an optional battery energy storage system (BESS)
Recent Activity
04/23/2024 - Wallula Gap Info Meeting and Land Use Hearing Notice
03/13/2024 - CFE Appoints Yuriy Korol
03/13/2024 - Spokane Tribe Deferral
03/01/2024 - Attachment L - CRS Confidential Placeholder
03/01/2024 - Attachment M - WASR Final
03/01/2024 - Attachment N - ALTA ACSM Land Survey
03/01/2024 - Attachment O - FAA Letter
03/01/2024 - Wallula Gap Application
03/01/2024 - Attachment P - Glare Analysis Memo
Project Background
On February 23, 2024, EFSEC received from Wallula Gap Solar, LLC an application to construct and operate Wallula Gap Solar, a 60-megawatt (MW) solar photovoltaic (PV) project with an optional battery energy storage system (BESS) located in Benton County, Washington.
The Facility is proposed to be located approximately 4 miles northwest of the unincorporated community of Plymouth on parcels located north of SR-14, approximately 5 miles west of its intersection with Interstate 82. The Facility would be located across a portion (approximately 437 acres) of three parcels. The parcels are owned by Farmland Reserve, Inc. (Landowner), and are known herein as the “Facility Parcels” (approximately 1,220 acres).
The Facility would consist of PV modules mounted on single-axis trackers supported on stationary piles. Each row of solar panels would be strung together in a north-south orientation and the panels would tilt on a single axis (facing east in the morning and tilting toward the west, following the sun, through the course of each day to maximize energy output).
The optional BESS would not exceed the nominal 60-MW capacity of the Facility. As currently designed, the optional BESS would be connected to the DC side of the transformer. The battery would store power generated by the Facility and dispatch it to the electrical grid at a later time. The Facility is currently proposed to utilize lithium-ion battery energy technology. However, pending commercial interest, the Facility could be designed to utilize other battery technology.
The Facility would interconnect through a line tap to Benton Public Utility District’s (PUD) 115-kV line near the Prior #2 substation. The generation would then be connected to the Bonneville Power Administration’s (BPA) facilities at the Plymouth tap (aka Paterson Tap), where Benton PUD and BPA facilities connect at BPA’s McNary substation.
The Applicant intends for the Facility to have a Commercial Operations Date (COD) as early as Q4 2026. To meet this schedule, it is expected that construction would begin in Q4 2025
Wallula Gap Informational Meeting and Land Use Hearing
The Informational Meeting and Land Use Hearing took place on April 23rd, 2024. You can view the recordings here:
Informational Meeting
Land Use Hearing
Meeting Location: The Public Information Hearing and Land Use Consistency Hearing will be held partially in person AND virtually via Microsoft Teams.
You may attend the meeting in person at:
Kennewick Valley Grange #731
2611 S Washington St
Kennewick, WA 99337
You may attend the meeting via Microsoft Teams online or via phone at:
- https://bit.ly/WallulaGap_InfoMtg_LUH
- Phone number +1 564-999-2000 Conference ID: 958652323#
To facilitate these remote meetings, EFSEC would like to invite speakers to sign up ahead of the meeting. Anyone wishing to speak during the Public Information Hearing or the Land Use Hearing, please notify EFSEC by phone at (360) 664-1345 or email at efsec@efsec.wa.gov before 5:00 pm on April 23, 2024.
Please review EFSEC’s public meeting rules on our website: https://www.efsec.wa.gov/about-efsec/public-meeting-ground-rules
Public Comment: Public Comment will be accepted during both the Public Information Hearing and Land Use Consistency Hearing. If you are unable to attend the hearings, please send your comment in writing to efsec@efsec.wa.gov or an online database will also be open during the meeting at https://comments.efsec.wa.gov/ for submission of written comments.
The recording links for the Informational Meeting and the Land Use Hearing.
Wallula Info Meeting and Land Use Hearing
Document Title | Document Date | |
---|---|---|
Wallula Gap Info Meeting and Land Use Hearing Notice | 04/23/2024 | |
Wallula Gap Info Meeting and Land Use Hearing Notice - SPANISH | 04/23/2024 |
CFE
Document Title | Document Date | |
---|---|---|
CFE Appoints Yuriy Korol | 03/13/2024 |
Tribal Comments
Document Title | Document Date | |
---|---|---|
Spokane Tribe Deferral | 03/13/2024 |