Notice of Extension of Opportunity for

Public Comment

 

Title V Air Operating Permit for

Grays Harbor Energy, LLC

Electrical Generating Facility

Elma, WA

What projects are proposed?

 

Energy Facility Site Evaluation Council Draft Air Operating Permit and Technical Support Document

 

In accordance with Revised Code of Washington (RCW) 80.50 and Washington Administrative Code (WAC) 463-78-010 and WAC 463-78-005, NOTICE is hereby given that the Washington State Energy Facility Site Evaluation Council (EFSEC) has made a tentative determination to issue for public comment an Air Operating Permit (AOP) and associated Technical Support Document (TSD) Permit No. EFSEC/XXXX-XX. The Grays Harbor Energy Center is located at 401 Keys Rd, Elma WA 98541. Permit compliance will be governed by applicable provisions of RCW 80.50, WAC 463-78, and WAC 463-70.

 

The facility is referred to as the Grays Harbor Energy Center (GHEC). GHEC is capable of generating up to 650 megawatts (MW) of electricity from a combined-cycle power plant comprised of two combustion turbines, each equipped with a duct burner and heat recovery steam generator and a single steam turbine and bank of cooling towers shared in common. GHEC also operates an auxiliary boiler, a diesel emergency generator and an emergency fire water pump. Commercial operation of GHEC began on April 25, 2008.

 

The GHEC has the potential to emit several regulated air pollutants above their major source thresholds. In addition, GHEC is an affected source under Title IV (Acid Deposition Control) of the federal Clean Air Act, which independently triggers the requirement to obtain a Title V AOP. AOPs are required pursuant to Title V of the Federal Clean Air Act and are designed to help ensure compliance with applicable air quality regulations and standards. Because GHEC is capable of generating up to 650 MW of electricity and is a “major source” as defined in WAC 173-401-200(19), GHEC is required to operate under an AOP issued by EFSEC.

 

What is EFSEC is proposing to do?

EFSEC is proposing to issue AOP No. EFSEC/XXXX-XX and associated TSD.

 

How can you review the proposed permits?

Copies of the proposed No. EFSEC/XXXX-XX and the associated TSD are available at:

  • EFSEC
    621 Woodland Square Loop
    PO Box 43172
    Lacey, WA 98503-3172

The commenting period for this proposal has been extended. You may comment on the proposed permit and supporting documents from Monday, February 10, 2020 through close of business on Wednesday, March 11, 2020, on the EFSEC website at https://comments.efsec.wa.gov or in writing to the EFSEC office (see address above).

 

Can a decision be appealed?

Yes. This Order is subject to review pursuant to the WAC 463-78-140(3).

 

For more information about the draft AOP and TSD, contact Amí Kidder at (360) 664-1305 or ami.kidder@utc.wa.gov

 

To request ADA accommodation or materials in a format for the visually impaired, contact the EFSEC office at (360) 664-1345.