Wild Horse Wind
Power Project
Application for Site Certification 2004- 01
Table of Contents
Please use the links below to
view the text of the Application for Site
Certification 2004-01 submitted by
Wind ridge Power Partners, L.L.C. to
EFSEC on March 9, 2004.
The following are PDF files. To obtain a free copy of Adobe Acrobat Reader for reading PDF files follow
this link.
|
Volume 1: Application for Site
Certification
- Volume 1 Table
of Contents
List of Figures
List of Tables
List of Acronyms used
1 SUMMARY
1.1 INTRODUCTION
1.2 PURPOSE AND NEED FOR THE PROJECT AND ASSOCIATED FACILITIES
1.3
DECISIONS TO BE MADE
1.4
DESCRIPTION OF ALTERNATIVES
1.5 SUMMARY OF POTENTIAL IMPACTS AND MITIGATION MEASURES
1.6 CUMULATIVE
IMPACTS
1.7 PUBLIC
INVOLVEMENT/CONSULTATION/COORDINATION
1.8
ISSUES TO BE RESOLVED
2 PROPOSED PROJECT AND
ALTERNATIVES
2.1 INTRODUCTION
2.2 DESCRIPTION OF THE PROPOSED PROJECT
2.3 ALTERNATIVES
2.4
BENEFITS OR DISADVANTAGES OF RESERVING PROJECT APPROVAL FOR A LATER DATE
2.5
REGULATIONS AND PERMITS
2.6 COORDINATION AND CONSULTATION WITH AGENCIES, INDIAN TRIBES, THE
PUBLIC, AND NON-GOVERNMENT ORGANIZATIONS
2.7 POTENTIAL FOR FUTURE ACTIVITIES AT SITE
3 EXISTING CONDITIONS,
IMPACTS, AND MITIGATION MEASURES
3.1 EARTH
3.2 AIR QUALITY
3.3 WATER RESOURCES
3.4 VEGETATION AND WETLANDS
3.5
AGRICULTURAL CROPS AND LIVESTOCK
3.6 WILDLIFE
3.7 FISHERIES
3.8 ENERGY AND
NATURAL RESOURCES
3.9 NOISE
3.10 LAND USE
3.11 VISUAL
RESOURCES/LIGHT AND GLARE
3.12 POPULATION, HOUSING, AND
ECONOMICS
3.13 PUBLIC
SERVICES AND UTILITIES/RECREATION
3.14 CULTURAL
RESOURCES
3.15
TRAFFIC AND TRANSPORTATION
3.16 HEALTH AND
SAFETY
3.17
CUMULATIVE IMPACTS
3.18
RELATIONSHIP BETWEEN SHORT TERM USES OF THE ENVIRONMENT AND THE
MAINTENANCE OF LONG TERM PRODUCTIVITY
3.19 IRREVERSIBLE OR IRRETRIEVABLE COMMITMENTS OF RESOURCES
4 REQUIRED EFSEC
INFORMATION
4.1 ASSURANCES
4.2
SOURCES OF INFORMATION
4.3 LEGAL DESCRIPTIONS AND OWNERSHIPS
4.4
CONSTRUCTION MANAGEMENT
4.5 NPDES
4.6 EMERGENCY
PLANS
4.7 CRITERIA USED FOR TRANSMISSION ROUTE AND DESIGN
4.8 INITIAL SITE RESTORATION PLAN
4.9 STUDY
SCHEDULES
4.10 LIST OF
PREPARERS
VOLUME II: Exhibits
Exhibit 1
Exhibit 2
Interconnection Substation Electrical One-Line Diagram
Exhibit 3
;
17.61-Utilities,
B Additional Pertinent
Sections of the Kittitas County Code
C Kittitas County Comprehensive Plan
D Pertinent Sections from
the RCW
Exhibit
4 Geotechnical Data Report
Exhibit 5
Soils Map
Exhibit 6
Exhibit 7
Temporary Air Quality Permit Application for Rock Crushing on Site
Exhibit 8 National Pollution Discharge Elimination System (NPDES) Permit
Application
Exhibit 9 Shadow Flicker Briefing Memo
Exhibit 10 FEMA Flood Zone Map
Exhibit 11 WDFW Hydraulic Permit Waiver Letter
Exhibit 12 Habitat
Characterization and Rare Plant Resources Report
Exhibit 13 Letter of Interest from City of Kittitas for Project Water Supply
Exhibit 14 Wildlife Baseline Study
Exhibit 15
Exhibit 16 Land Use Map
Exhibit 17 Zoning Designations
Exhibit 18
Exhibit 19
Property Value Study
Exhibit 20
ECONorthwest Economic Impact Analysis
Exhibit 21 Project Area Fire
Districts
Exhibit 22 Recreational Areas
Surrounding Project Site (25 miles)
Exhibit 23
List of Accepted Waste Materials - Kittitas County Land Fill Site
Exhibit 24
Exhibit 25 Tribal
Correspondence:
Summary,
Correspondence
Exhibit 26 Project
Site Surrounding Roadway Network & Transportation Routes
Exhibit 27
Project Site Icing Conditions
Exhibit 28 DOE Sand and
Gravel General Permit Application
Exhibit 29
Surrounding Land Parcels
Exhibit 30
Exhibit 31 Electric
and Magnetic Fields (EMF)
Exhibit 32 BPA Letter of Non-participation in SEPA Process
Back
to Wild Horse Wind Power Project Page
Top of Page
|