Part 2: APPENDICES
- Table of contents
- Appendix
A: Assurances (463-42-075 WAC) (2 pages, 84.9 KB)
- A.1
463-42-075 WAC General - Assurances
- Appendix
B: General Sources of Information (19 pages, 210 KB)
- Section
2: Proposed Action
- Section
3: Existing Conditions, Impacts and Mitigation Measures
- Appendix
C: Legal Descriptions and Ownership Interests (463-42-135 WAC)
(9 pages, 141 KB)
- C.1
463-42-135 WAC Proposal - Legal Descriptions and Ownership
- Interests
- C.2
Principal Facility:Generation Plant Site
- C.3
Natural Gas Transmission and Lateral Pipelines
- C.4
Electrical Transmission Lines
- C.5 Water
Pipeline and Well
- C.6 SPP
Access Roads
-
- Appendix
D: Starbuck Power Company - Engineering Report (61 pages,
8.72 MB)
- D.1
Introduction
- D.2
Supporting Documentation
- Appendix
E: Spillage Prevention and Control (8 pages, 152 KB)
- E.1
Generation Plant
- E.2 Water
Pipeline Alternative
- E.3
Access Roads
- E.4
Wastewater Facilities
- Appendix
F: Construction Management (10 pages, 169 KB)
- F.1
Construction Management Organization
- F.2
Quality Assurance and Quality Control
- F.3
Construction QA/QC Program
- F.4
Control and Monitoring Plans QA/QC
- F.5
Equipment Quality Assurance/Quality Control
- Appendix
G: Prevention of Significant Deterioration and Notice of Construction Permit
Application (122 pages, 5.93 MB)
- G.1
Introduction
- G.2
Applicable Standards
- G.3 Air
Quality Impact Analysis
- Appendix
H: NPDES Permit Application (43 pages, 5.07 MB)
- Letter
and Application to Ecology Regarding Stormwater Permit for
- Operations
-
Application for NPDES General Permit for Stormwater Associated
- with
Construction Activity
- 1.0
Purpose of Plan
- 2.0 Site
Evaluation
- 3.0 Site
Construction Plan
- 4.0
Stormwater Management System
- 5.0
Erosion and Sediment Control Requirements
- 6.0
Minimum Requirements
- 7.0
Additional BMPs
- 8.0
Record Maintenance
- 9.0 SWPPP
Modifications
- 10.0
Contractor Certifications
- 11.0
Project Completion
-
- Appendix
I: Emergency Plan (29 pages, 385 KB)
- I.1
Construction
- I.2 Plant
Evacuation
- I.3 Fire
or Explosion
- I.4
Onsite Natural Gas Release
- I.5
Chemical Spill or Release
- I.6 Oil
Spill or Release
- I.7
Abnormal Weather (Fog or Icing)
- I.8
Earthquake
- I.9
Volcanic Eruption
- I.10
Medical Emergencies
- I.11
Facility Blackout
- I.12
Facility Bomb Threat
- I.13
Onsite Ammonia Release
- I.14
Offsite Ammonia Release
- Appendix
J: Criteria, Standards, and Factors Utilized to Develop Transmission Route
(1 page, 80.3 KB)
- Appendix
K: Initial Site Restoration Plan (7 pages, 112 KB)
- K.1
Preface
- K.2
Introduction
- K.3
Assumptions
- K.4
Financial Assurance
- K.5
Restoration Plan upon the Permanent Cessation of
- Construction of the
Starbuck Power Project
- K.6
Restoration Plan upon the Permanent Cessation of Operations
- of the Starbuck
Power Project
- Appendix
L: Study Schedules (5 pages, 94.8 KB)
- L.1
Meteorological Studies
- L.2
Geotechnical Studies
- L.3 Oral
History Studies
- L.4
Cultural Resources Studies
- L.5
Vegetation Studies
- Appendix
M: Mitigation Measures (19 pages, 218 KB)
- M.1 Earth
- M.2 Air
Quality
- M.3 Water
Resources
- M.4
Wetlands and Vegetation
- M.5
Agricultural Crops and Livestock
- M.6
Wildlife
- M.7
Fisheries Resources
- M.8
Energy and Natural Resources
- M.9 Noise
- M.10 Land
Use
- M.11
Visual Resources/Light and Glare
- M.12
Population, Housing, and Economics
- M.13
Public Services and Utilities
- M.14
Cultural Resources
- M.15
Traffic and Transportation
-
M.16
Health and Safety
Back to
the Application for Site Certification Table of Contents
Back to
Starbuck Power Project Page
Top of Page
|