EFSEC Orders and Resolutions

EFSEC Orders

Project

Order #

Regarding

Date

Pacific Mountain Energy Center  06-01 835 Clarifying Order No. 833 12/21/07
Pacific Mountain Energy Center  06-01 834 Schedule of Adjudicative Hearings and Parties' Issues List 11/29/07
Pacific Mountain Energy Center  06-01 833 Adjudicative Order: Staying Adjudicative Proceeding 11/27/07
Pacific Mountain Energy Center  06-01 832 Prehearing Order: Granting, on Condition, Petitions for Intervention 9/27/07
Kittitas Valley Wind Power 03-01 831 Order on Remand Letter from Governor Gregoire Modifying the Draft Site Certification Agreement Accompanying Order No. 826  
Desert Claim Wind Power 06-02 830 Order on Determination that Desert Claim Wind Power has Satisfied WAC 463-28-030(1) 5/8/07
Desert Claim Wind Power 06-02 829 Request for Extension to File Request for Preemption 4/30/07
Pacific Mountain Energy Center  06-01 828 Order on Consistency with Local and Regional Land Use Plans or Zoning Ordinances 4/26/07
Kittitas Valley Wind Power 03-01 827 Order on Motions for Reconsideration of Order No. 826 by Kittitas County and Mr. Ed Garrett and Ms. Rosemary Monaghan 4/26/07
Kittitas Valley Wind Power 03-01 826 Finding of Facts, Conclusions of Law, and Order Recommending Approval of Site Certification on Condition 3/27/07
Desert Claim Wind Power 06-02 825 Order on Consistency with Local Land Use Plans and Zoning Ordinances

3/7/07
Kittitas Valley Wind Power 03-01 824 Order on Schedule for Post-Hearing Briefs 10/13/06
Kittitas Valley Wind Power 03-01 823 Prehearing Conference Order Regarding Hearing Schedule and Other Procedural Matters. 10/13/06
Kittitas Valley Wind Power 03-01 822 Prehearing Conference order regarding Renewable Northwest Project's Request for public comment hearing in Western Washington. 8/31/06
Kittitas Valley Wind Power 03-01 821 Prehearing Conference order regarding status of pre-hearing matters. 8/31/06
Kittitas Valley Wind Power 03-01 820 Prehearing Conference order regarding schedule for pre-hearing submittals and other procedural matters. 6/21/06
Kittitas Valley Wind Power 03-01 819 Prehearing conference order regarding status of land use consistency negotiations and scheduling of adjudicative hearings. 6/6/06
Kittitas Valley Wind Power 03-01 818 Prehearing conference order regarding project status and scheduling of adjudicative hearings. 5/9/06
Kittitas Valley Wind Power 03-01 817 Prehearing Conference Order Regarding Scheduling of Adjudicative Hearings. 3/14/06
Kittitas Valley Wind Power 03-01 816 Prehearing Order 19:Prehearing Conference Order Regarding Applicant's Updates on Land-use Negotiations, Procedural Items, and Motion to Move DEIS and Public Comments into the Adjudicative Record. 10/10/05
Wild Horse Wind Power 04-01 815 Order on Application for Transfer of Site Certification Agreement, and Approval of Other Assurances Pursuant to Article VIII.D.3 of the Site Certification Agreement 8/30/05
Wild Horse Wind Power 04-01 814 Findings of Fact, Conclusions of Law, and Order Recommending Approval of Site Certification on Condition 5/25/05
Starbuck Power 01-02 813 Order on Termination, Dismissal, and directing closeout of Application No. 2001-02 4/12/05
Satsop CT - 94-1 812 Order on Financial Assurances for Site Restoration 3/15/05
Wild Horse Wind Power 04-01 811 Prehearing Order No. 6: Order on Prehearing to Receive Status Report on Scheduled Hearing Dates, and to Discuss Hearing and Witness Schedules. 3/1/05
Wild Horse Wind Power 04-01 810 Prehearing Order No. 5: Order on Applicant's Objections and Motion to Strike Testimony. 2/25/05
Satsop CT 98-1 809 Order on Application for Transfer of Control 2/23/05
Wild Horse Wind Power 04-01 808 Prehearing Order No. 4: Prehearing Order Amending Hearing Guidelines and Noticing Status Conference 2/10/05
Wild Horse Wind Power 04-01 807 Prehearing Order No. 3: Prehearing Order Denying Intervenor Lathrop’s Objection to Prehearing Order No. 1. 1/27/05
Wild Horse Wind Power 04-01 806 Prehearing Order No. 2::
Prehearing Order Granting Applicant’s Request for Extension  of Time to Resolve Land Use Inconsistency, and Establishing Hearing Schedule and Pre-Filed Testimony Topics
1/5/05
Wild Horse Wind Power 04-01 805 Prehearing Order No. 1: Prehearing Order Granting, On Condition, Petitions for Intervention.Errata correcting Order No. 804, Prehearing Order No. 1 to Order No. 805 (12/14/2004) 12/7/04
Kittitas Valley Wind Power 03-01 804 Prehearing Order 18: Prehearing Conference Order Granting Joint Motion to Continue Hearing Date 9/28/04
BP Cherry Point Cogen 02-01 803 REVISED - Findings of Fact, Conclusions of Law, and Order Recommending Approval of Site Certification on Condition 10/26/04
Kittitas Valley Wind Power 03-01 802 Order on Motions to Strike Testimony 9/21/04
Kittitas Valley Wind Power 03-01 801 Prehearing Order 16: Order on Post-hearing Schedule of Events 9/1/04
Kittitas Valley Wind Power 03-01 800 Prehearing Order 15: Order Denying Kittitas County Prehearing Motions 9/1/04
Kittitas Valley Wind Power 03-01 799 Prehearing Order 14: Order Denying Intervenor Residents Opposed to Kittitas turbines Motion to Stay Adjudicative hearing until Issuance of Final Environmental Impact Statement 9/1/04
BP Cherry Point Cogen 02-01 798 Post Hearing Order No. 3: Order on Determination Made in Connection with the Land use Hearing Under RCW 80.50.090 (2), WAC 463-14-030, and WAC 463-26-110. 8/24/04
BP Cherry Point Cogen 02-01 797 Post Hearing Order No. 2: Order on Amended Stipulation and Settlement Agreement Between Applicant and Whatcom County 8/25/04
Kittitas Valley Wind Power 03-01 796 Prehearing Order 13: Prehearing Conference Order Denying Kittitas County's Request for Issuance of Initial Responses to Comments to Draft EIS. 8/17/04
Kittitas Valley Wind Power 03-01 795 Prehearing Order 12: Prehearing Conference Order Granting Applicant's Motion to Continue and Setting New Hearing Schedule and Deadlines. 8/13/04
Kittitas Valley Wind Power 03-01 794 Prehearing Order 11: Order Denying F. Steven Lathrop's Motion to Dismiss Applicant's Motion for Preemption 8/12/04
Kittitas Valley Wind Power 03-01 793 Prehearing Order 10: Order Denying F. Steven Lathrop's Motion to Stay Adjudicative Hearing 8/10/04
Kittitas Valley Wind Power 03-01 792 Prehearing Order 9: Order Setting Deadlines for Submittal of Schedules for Witnesses, Pre-Hearing Statements, and Pre-Hearing Motions. 8/9/04
Wild Horse Wind Power Project 04-01 791 Order On Consistency With Local And Regional Land Use Plans Or Zoning Ordinances (4 pages) 6/8/04
Kittitas Valley Wind Power 03-01 790 Prehearing Order No. 8: Order on Discovery procedures, Prefiled Testimony, and Setting Schedule for Adjudicative Hearings 3/12/04
Kittitas Valley Wind Power 03-01 789 Prehearing Order No. 7: Order Granting Applicant’s Request for Extension of Time to Resolve Land Use Inconsistency 2/9/04
BP Cherry Point Cogen 02-01 788 Post Hearing Order No. 1, Council Order No. 788: Order on Request by Applicant and Whatcom County to Delay Council Decision on Land Use Consistency and Postpone Posthearing Briefing Schedule: 2/9/04
BP Cherry Point Cogen 02-01 787 Prehearing Order No. 6 - Order on Amended Stipulation Between the Applicant and Counsel for the Environment 1/27/04
Kittitas Valley Wind Power 03-01 786 Prehearing Order No.6 - Decision of the Energy Facility Site Evaluation Council, Councilmember Richard Fryhling, and Councilmember Tony Ifie in Response to Intervenor F. Steven Lathrops's Petition for Review 1/13/04
BP Cherry Point Cogen 02-01 785 Prehearing Order No.5: Fourth Prehearing Conference Order Regarding Withdrawal of the Province of British Columbia and Adjudicative Proceedings Schedule 12/18/03
BP Cherry Point Cogen 02-01 784 Prehearing Order No. 4:  Third Prehearing Conference Order Receiving Proposed Settlement Agreement, Setting Hearing Dates, and Dealing with Hearing Procedures and Proposed Permits  11/17/03
Kittitas Valley Wind Power 03-01 783

PREHEARING ORDER NO. 5
Decision of the E
nergy Facility Site Evaluation Council in Response to Intervenor F. Steven Lathrop's Motion to Disqualify the Department of Natural Resources and the Department of  Community, trade and Economic Development

10/14/03
Kittitas Valley Wind Power 03-01 782

PREHEARING ORDER NO. 4
Decision and Declaration of Councilmember Richard Fryhling in Response to Intervenor F. S
teven Lathrop's Disqualification Motion

10/14/03
Kittitas Valley Wind Power 03-01 781

PREHEARING ORDER NO. 3
Decision and Declaration of Councilmember Tony Ifie in Response to Intervenor F. Steven Lathrop's Disqualification Motion

10/14/03
BP Cherry Point Cogen

02-01

780 PREHEARING ORDER NO. 3
Order on Motion of the Washington Utilities and Transportation Commission to Withdraw Notice of Intent to Participate as a Party.
10/13/03
BP Cherry Point Cogen

02-01

779 Second Prehearing Order Finalizing Intervention, Reviewing Stipulations and Agreements and Discovery Matters and Setting Hearing Date.
Appendix A - Consolidated Issues List
7/28/03
Kittitas Valley Wind Power 03-01 778 Prehearing Order No. 2: Order On Motion To Disqualify Council Members Ifie And Fryhling, Motion To Clarify Issues, And Motion For Reconsideration Or Alternatively Objection To Limitation Of Issues 7/10/03
Kittitas Valley Wind Power 03-01 777 Prehearing Order No. 1: Granting, On Condition, Petitions for Intervention; Adopting Hearing Guidelines and Taking Further Action
Appendix A Final HEARING GUIDELINES, Appendix B Service List 7-1-03
7/3/03
Kittitas Valley Wind Power 03-01 776 Order On Consistency With Local And Regional Land Use Plans And Zoning Ordinances (PDF - 6 pages) on May 7, 2003. 5/7/03
Wallula Power 01-01 775 Order on Application for Transfer of Ownership 3/10/03
Starbuck Power 01-02 774 PREHEARING ORDER NO. 1 Additional Suspension of Adjudicative Hearing 3/10/03
BP Cherry Point 2002-1 773 PREHEARING ORDER NO. 1 Granting, on Condition, Petitions for Intervention; and Adopting Hearing Guidelines 12/16/02
Wallula Power 01-01 772 Findings of Fact, Conclusions of Law, and Order Recommending of Site Certification on Condition 10/8/02
Wallula Power 01-01 771 PREHEARING ORDER No.4 Order on Settlement Agreements 6/19/02
Sumas Energy 2 – 99-1 770

Constance Hoag's Motion for Reconsideration of Council Order No. 768 and Motion for Reconsideration of Order 768 by Parties NW Energy Coalition and Washington Environmental Council; Whatcom County; and Counsel for the Environment.

6/19/02
Wallula Power 01-01 769 PREHEARING ORDER No.3 Order on Settlement Agreements and Order setting Adjudication Hearing 6/14/02
Sumas Energy 2 – 99-1 768 Findings of Fact, Conclusions of Law, and Order Recommending Approval of Site Certification on Condition 5/24/02
Wallula Power 01-01 767 PREHEARING ORDER No.2 Order on Scheduling, Deadline for Late Intervention, Adopting Hearing Guidelines, and Establishing Procedure for Settlements 4/9/02
Satsop Phase II Power 01-01 766 Finding of Consistency Grays Harbor County Land Use Plans and Zoning Ordinances 3/27/02
Wallula Power 01-01 765 PREHEARING ORDER No.1 Granting, Granting on Condition Petitions for Intervention, and Setting Procedure for Late Intervention 3/12/02
Sumas Energy 2 – 99-1 764 POSTHEARING ORDER No. 1 in consideration of Second Revised Application 2/7/02
Sumas Energy 2 – 99-1 763

PREHEARING ORDER No. 4 consideration of Second Revised Application

10/29/01
  762 In the Matter of the petition of FPL Energy Inc. for a declaratory order, Council Order No. 762, Declaratory Order 10/22/01
Sumas Energy 2 – 99-1 761 PREHEARING ORDER No. 3 in consideration of Second Revised Application 10/4/01
Sumas Energy 2 – 99-1 760 PREHEARING ORDER No. 2 in consideration of Second Revised Application 8/9/01
Sumas Energy 2 – 99-1 759 PREHEARING ORDER No. 1 in consideration of Second Revised Application 7/26/01
Sumas Energy 2 – 99-1 758 Order on Whatcom County's Motion for Reconsideration of Council Order No. 757 5/16/01
Sumas Energy 2 – 99-1 757 Order on applicant's Motion for Reconsideration 4/20/01
Sumas Energy 2 – 99-1 756 Posthearing Order No. 4,  Order On Abbotsford And Abbotsford Chamber Of Commerce’s Motion For Additional Time To Respond To NESCO’s Motion For Reconsideration 3/1/01
Sumas Energy 2 – 99-1 755 Posthearing Order No. 3, Council Order No. 755: Order on SE2's Motion to Stay Council Order No. 754 (2 pages) 3/1/01
Sumas Energy 2 – 99-1 754 Findings of Fact, Conclusions of Law, and Order Recommending Denial of Site Certification and Order Denying Motion to Reopen Record 64 pages 208 KB 2/16/01
Chehalis Amd. 1 753 Findings of Fact, Conclusions of Law, and Order Recommending Approval of Amendments on Condition 2/12/01
Chehalis Amd. 1 752 Findings of Fact, Conclusions of Law, and Order Recommending Approval of Amendments on Condition 12/5/00
Sumas Energy 2 – 99-1 751 Post-hearing order No. 2 answering request for clarification and/or objection to Post-hearing order No. 1 9/12/00
Sumas Energy 2 – 99-1 750 Post-hearing order No. 1 on notice of hearing to receive additional evidence from members of the public (9/27/00); notice of hearing on the draft PSD permit (9/28/00); order on stipulations, settlement agreements and stipulated withdrawal; order on briefing schedule, order on surrebuttal 8/28/00
Sumas Energy 2 – 99-1 749 PHO 6: Order on Stipulations 7/20/00
Sumas Energy 2 – 99-1 748
App A
App B
PHO 5: Order on hearing guidelines, format and procedure (and Appendices A and B) 7/20/00
Sumas Energy 2 – 99-1 747,

App 1

PHO4: Order describing hearing format, the marking of exhibits, and notice of prehearing conference. (July 13, 2000) 6/21/00
Sumas Energy 2 – 99-1 746 PHO 3: Order on Revised Schedule: Notice of Prehearing conferences (June 12, 2000 and July 17, 2000); Notice of Commencement of Hearing to Receive Evidence from Members of the Public (July 25 and 27, 2000); Order on Prefiled Rebuttal Evidence 5/26/00
Chehalis Amend. No. 1 745 PHO 4: Order on Stipulations, EFSEC Pretreatment Authority, CTED’s Dispositive Motion 5/26/00
Sumas Energy 2 – 99-1 744 PHO 2: Order on Stipulations 5/17/00
Sumas Energy 2 – 99-1 743 PHO 1: Prehearing Order Granting on Condition, and Denying Petitions for Intervention 5/10/00
Chehalis Amend. No. 1 742 PHO 3: Order on Motion to Exclude Issues, Schedule for Exhibits and Testimony Lists, Notice of Prehearing Conference (May 22, 2000); Notice of Commencement of Hearing (May 24, 2000); and Notice of Hearing to Receive Evidence from Members of the Public (May 24, 2000) 5/9/00
Chehalis Amend. No. 1 741 PHO 2: Order on Scheduling, Identifying dates for Issues List Development, Discovery, Depositions, and Hearings 4/24/00
Chehalis Amend. No. 1 740 PHO 1: Order Granting Intervention, Denying Motion for Postponement of Prehearing Conference, and Limiting Scope of Adjudication – PHC Order No. 1
(Note: this order was erroneously issued as Order No. 738, corrected to Order No. 740 on 4/14/2000)
4/3/00
Olympic Pipeline - 96-1 739 Order Directing Close Out of Application No. 96-1 7/13/99
Olympic Pipeline - 96-1 738 Order of Dismissal on Withdrawal 7/13/99
Olympic Pipeline - 96-1 737 Order Denying Motion for Indefinite Recess 6/30/99
Olympic Pipeline - 96-1 736 Clarification of Council Order 732 6/11/99
Satsop CT 98-1 735 Order on Reconsideration Reaffirming Order 731 and Denying Stay 6/14/99
Olympic Pipeline - 96-1 734 Order on Late Intervention of Worldcom Network Services, Inc., and AT&T Corp 6/1/99
Olympic Pipeline - 96-1 733 Order on Motions In Limine and Motions to Strike Portions of Applicant’s March 1999 Prefiled Testimony (Leffler) 5/19/99
Olympic Pipeline - 96-1 732 Order on Stipulation between Applicant and Yakama Indian Nation 5/12/99
Satsop SC 98-1 731 PHO 30: Order recommending Gov Approval of Amendment of Site Certification Agreement for Satsop Power Plant Site 4/20/99
Olympic Pipeline - 96-1 730 PHO 29: Prehearing Conference Order: Order Deciding Motions; Notice of Prehearing Conf 4/7/99
Olympic Pipeline - 96-1 729 PHO 28: Discovery order re applicant’s motion to compel production of tidewater information and documents. 3/15/99
Olympic Pipeline - 96-1 728 PHO 27: Order responding to motions regarding adequacy of the draft environmental impact statement 3/8/99
Olympic Pipeline - 96-1 727 PHO 26: Order granting motions for late filing of prefiled testimony 3/8/99
Olympic Pipeline - 96-1 726 PHO 25: Order on requests for late intervention 3/8/99
Olympic Pipeline - 96-1 725 PHO 24: Order denying motions for declaratory order; modifying schedule for application review 3/8/99
Olympic Pipeline - 96-1 724 PHO 23: Stipulation Protective Order 3/2/99
Olympic Pipeline - 96-1 723 PHO 22: Prehearing order 2/5/99
Olympic Pipeline - 96-1 722 PHO 21: Prehearing order 1/25/99
Olympic Pipeline - 96-1 721 PHO 20: Order on Stipulations 1/25/99
Olympic Pipeline - 96-1 720 PHO 19: Order on Motion to continue land use consistency hearings 1/12/99
Olympic Pipeline - 96-1 719 PHO 18: Notice of Stipulation Hearing (Jan 14, 1999) & Prehearing Conference (Jan 14, 1999) 12/8/98
Olympic Pipeline - 96-1 718 PHO 17: On Intervention Issues 12/8/98
Olympic Pipeline - 96-1 717 PHO 16: Notice of Stipulation Hearing (Jan 14 & 15, 1999) 9/24/98
Olympic Pipeline - 96-1 716 PHO 15: Responding to Thurston County Superior Court Ruling on Intervention 9/24/98
Olympic Pipeline - 96-1 715 PHO 14: Setting schedule for application review 8/21/98
Olympic Pipeline - 96-1 714 PHO 13: Notice of prehearing conference (September 24, 1998) 8/4/98
Olympic Pipeline - 96-1 713 PHO 12: Request for draft schedules 4/20/98
Olympic Pipeline - 96-1 712 PHO 11: Notice of prehearing conference (March 26, 1998) 12/23/97
Cowlitz Cogen - 93-1 711 Approving request for extension of SCA until 2004 and adding terms and recommending Governor approval 10/20/97
Olympic Pipeline - 96-1 710 PHO 10: Notice of prehearing conference December 4, 1997 10/9/97
KVA/NRPF - 93-2 709 Declaratory Order on phased construction of the NRPF 6/10/97
Olympic Pipeline - 96-1 708 PHO 9: Addressing procedural matters 4/21/97
Olympic Pipeline - 96-1 707 PHO 8: Modifying PHO #7 2/25/97
Olympic Pipeline - 96-1 706 PHO 7: Notice of prehearing conference April 1, 1997 2/10/97
Chehalis GF - 94-2 706 Denying motion for reconsideration 1/3/97
Chehalis GF - 94-2 705 Order on remand amending order no. 698 12/20/96
Olympic Pipeline – 96-1 704 PHO 6: Addressing administrative issues 11/8/96
Olympic Pipeline – 96-1 703 PHO 5: Order on objections to PHO 3 10/15/96
Olympic Pipeline – 96-1 702 PHO 4: Continuing Prehearing Conference 9/13/96
Chehalis GF - 94-2 702 A Denying motions for reconsideration 8/19/96
Olympic Pipeline – 96-1 701 PHO 3: Granting, in-part, on condition & denying petition for intervention 8/15/96
Olympic Pipeline – 96-1 700 PHO 2: Denying Objections to PHO 1 8/15/96
Olympic Pipeline - 96-1 699 PHO 1: Addressing procedural matters & state agency requests for intervention 7/11/96
Chehalis GF - 94-2 698 Granting site certification, on condition 6/17/96
KVA/NRPF - 93-2 697 Granting site certification, on condition 6/10/96
Chehalis GF - 94-2 696 Denying reconsideration 5/13/96
Satsop CT - 94-1 695 Granting motions received for reconsideration and modifying Order 694 recommending site certification, on condition, and draft SCA 4/15/96
Satsop CT - 94-1 694 (modified) Recommending site certification, on condition 4/15/96
Satsop CT - 94-1 694 Recommending site certification, on condition 3/14/96
Chehalis GF - 94-2 693 PHO 5:Granting motion to strike portions of reply briefs of CFE, Ecology/ and striking portions of the CIC surrebuttal brief 3/4/96
Chehalis GF - 94-2 692 PHO 4: Denying motion to strike and admitting public petition into the record 12/18/95
KVA/NRPF - 93-2 691 PHO 11: Denying reconsideration; rejecting objections to PHC 10 10/13/95
KVA/NRPF - 93-2 690 PHO 10: Notice of continued PHC (October 5, 1995) 9/25/95
Satsop CT - 94-1 689 LU 2: Finding consistency w/ county and regional land use and zoning ordinance 8/24/95
Chehalis GF - 94-2 688 PHO 3: Granting motions to exclude issues, in part 8/4/95
Satsop CT - 94-1 687 PHO 4: Addressing procedural matters 8/4/95
Satsop CT - 94-1 686 PHO 3: Granting motion, in-part, to exclude certain issues 8/3/95
Satsop CT - 94-1 685 LU 1: Reopening land use consistency hearing re: Thurston Co. 8/2/95
Chehalis GF - 94-2 684 PHO 2: Addressing scheduling matters and administrative issues 7/31/95
KVA/NRPF - 93-2 683 PHO 9: Addressing scheduling matters and administrative issues 7/31/95
KVA/NRPF - 93-2 682 PHO 8: Granting motion, in-part; modifying PHC 4 7/18/95
Satsop CT - 94-1 681 PHO 2: Addressing procedural issues 6/30/95
KVA/NRPF - 93-2 680 PHO 7: Addressing scheduling matters and administrative issues 6/30/95
KVA/NRPF - 93-2 679 PHO 6: Denying summary judgment; denying continuance 6/21/95
Chehalis GF - 94-2 678 PHO 1: Denying petition for intervention 5/17/95
KVA - 93-2 677 PHO 5: Amending schedule 4/19/95
Satsop CT - 94-1 676 PHO 1: Granting and denying petitions for intervention 4/11/95
KVA/NRPF - 93-2 675 PHO 4: Addressing scheduling matters and administrative issues 4/11/95
KVA - 93-2 674 PHO 3: Notice of Prehearing Conference (3/16/95) 3/3/95
KVA - 93-2 673 PHO 2: Clarifying & affirming PHO 1 2/14/95
KVA - 93-2 672 PHO 1: Granting on condition/denying petition for intervention 1/20/95
Chehalis GF - 94-2 671 Findings of Consistency with Lewis County and Chehalis Comprehensive land use plans 12/19/94
Satsop CT - 94-1 670 Finding inconsistency with Thurston County zoning ordinances and land use plans 12/19/94
  669 No order associated with this number  
Satsop CT - 94-1 668 A Finding of consistency w/ Grays Harbor County land use and zoning ordinance 11/14/94
KVA/NRPF - 93-2 668 Finding of consistency w/local zoning ordinance 7/11/94
KVA/NRPF - 93-2 667 Order denying NRPF expedited processing 2/14/94
KVA/NRPF - 93-2 666 Finding of inconsistency w/ local zoning ordinance 2/14/94
Cowlitz Cogen - 93-1 665 Order approving application and recommendation that Governor certify site for construction and operation 12/21/93
Cowlitz Cogen - 93-1 664 Granting expedited processing and waving certain application requirements 11/3/93
Cowlitz Cogen - 93-1 663 Finding of consistency w/ Cowlitz Co/ land use and zoning regulations 9/23/93
 

662

No order associated with this number

 

EFSEC Resolutions

Project

Resolution #

Regarding

Date

  324 Recognition of Michael E. Mills 3/11/08
BP Cogen 02-01 323 Amendment No. 3 - BP to fund a project that would reduce water use at Intalco and make the unused water available for use by the Cogeneration project 3/11/08
BP Cogen 02-01 322 Amendment No. 2 -Transfer of SCA to New LLC, Removal of Certain Laydown Areas and Modification to Wetland Mitigation Provisions 3/11/08
Wild Horse Wind Power 04-01 321 Amendment No. 4 - Approval of Solar Demonstration Project 4/10/07
BP Cogen 02-01 320 Withdrawal of request to amend SCA and laydown use within NPDES permit 2/13/07
Wild Horse Wind Power 04-01 319 Amendment No. 3 - Installation of exempt well 2/13/07
Columbia Generating
 Station
318 Removal of on-site Visitor's Center and closeout of Resolution No. 225 11/14/06
BP Cogen 02-01 317 Amendment No. 1 to BP Cogen Site Certification Agreement 10/10/06
Sumas Energy 99-01 316 Sumas 2 Generation Facility - Termination of Site Certification Agreement 5/9/06
Wild Horse Wind Power 04-01 315 Amendment No. 2 to the Wild Horse Wind Power Project Site Certification Agreement 7/26/05
Wild Horse Wind Power 04-01 314 Modifications to the Wild Horse Wind Power Project Site Certification Agreement 7/26/05
WNP-1 & 4 313 WNP-1/4 Site Restoration - Offsite Environmental Mitigation 7/12/05
Satsop CT 98-1 312 Modifications to the Satsop Combustion Turbine Project Site Certification Agreement 1/11/05
Columbia
Generating 
Station
311 Emergency Preparedness Offsite Agency Support 1/11/05
Columbia
Generating 
Station
310 Energy Northwest - Columbia Generating Station: Termination of  Non-Radiological Environmental Monitoring Program 4/19/04
Satsop CT 98-1 309 Satsop Combustion Turbine Project - Technical Amendment - Water Use Provisions 4/19/04
Cowlitz-Weyerhauser 308 Cowlitz Cogeneration Project - Termination of Site Certification Agreement 3/1/04
Columbia
Generating 
Station
307

(3.3 MB)

Energy Northwest - Disposal of Water Stored in WNP-1 and WNP-4 Service Water Ponds 9/8/03
WNP-2/Columbia
Generating Station
306 Columbia Generating Station Condenser Scale Removal 4/14/03
Wallula Power 01-01 305 Modifications to the Corporate Structure of Site Certificate Holder - Wallula Generation LLC 3/10/03
Chehalis Generation Facility 304 Water use mitigation - Hamilton Water Rights 3/10/03
WNP-2/Columbia
Generating Station
303 Columbia Generating Station Hydrogen Storage and Supply Facility 2/18/03
WNP-1 & 4 302 Site Restoration Plan Approval 12/9/02
Chehalis Generation Facility 301 Water use mitigation 11/12/02
WNP-2/Columbia
Generating Station
300 Columbia Generating Station Sanitary Waste Treatment Facility 9/10/01
WNP-2/Columbia
Generating Station
299 Columbia Generating Station Cooling System Sediments 8/13/01
Satsop CT 98-1 298 Technical amendments regarding facility design and backup fuel source at Satsop CT Site 4/13/01
Satsop CT 98-1 297 Addition of Duke Energy Grays Harbor LLC as Satsop CT Site Certification Agreement co-holder and co-permittee 2/12/01
WNP-2/Columbia
Generating Station
296 Hanford Wildlife Mitigation Project/Rattlesnake Slope Rehabilitation 11/13/00
WNP-2/Columbia
Generating Station
295 Amending the CGS Site Certification Agreement to allow for construction and operation of Dry Cask Storage Facility at the project site 9/11/00
KVA/NRPF - 93-2 294 Avista Corporation termination of SCA for Creston Generating Station 1/24/00
WNP-2/Columbia
Generating Station
293
Amd. 1
Energy Northwest Change of Corporate Name/Columbia Generating Station Change of Plant Name 9/11/00