Access WashingtonEFSEC Banner
 

OPL Archive Home

Application

Technical Reports

EIS Process

DEIS

Adjudication

Prefiled Testimony

EFSEC Home

Olympic Cross Cascade Pipeline
Application 96-1 (Revised may 1998) Archive


  The following are PDF files. 
  To obtain a free copy of Adobe Acrobat Reader for reading PDF files follow this link. getacro.gif (712 bytes)

  In the following files, changes made to the application are indicated by a line along the right margin of the document. Figures, maps, and some tables are not included with these files. 

SECTION 1.1 DESCRIPTION OF APPLICANT

    1.1.1 APPLICANT
    1.1.2 OLYMPIC PIPE LINE COMPANY
    1.1.3 TEXACO TRADING AND TRANSPORTATION INC
    1.1.4 ATLANTIC RICHFIELD COMPANY (ARCO)
    1.1.5 GATX TERMINALS CORPORATION
    1.1.6 POTENTIAL USERS OF CROSS CASCADE PIPELINE PROJECT
 
SECTION 1.2 DESIGNATION OF AGENT
 
SECTION 1.3 ASSURANCES
    1.3.1 STATEMENT OF FINANCIAL RESPONSIBILITY
    1.3.2 INSURANCE
 
SECTION 1.4 MITIGATION MEASURES
    1.4.1 INTRODUCTION
    1.4.2 GENERAL CONSTRUCTION MITIGATION PRACTICES
    1.4.3 PROTECTION FROM NATURAL HAZARDS
    1.4.4 SPILL PREVENTION
    1.4.5 EARTH
    1.4.6 AIR
    1.4.7 WATER
    1.4.8 PLANTS AND ANIMALS
    1.4.9 ENERGY
    1.4.10 ENVIRONMENTAL HEALTH
    1.4.11 LAND AND SHORELINE USE
    1.4.12 TRANSPORTATION
    1.4.13 PUBLIC SERVICES AND UTILITIES
    1.4.14 SOCIOECONOMICS
 
SECTION 1.5 SOURCES OF INFORMATION
    1.5.1 EARTH
    1.5.2 AIR
    1.5.3 WATER
    1.5.4 UPLAND AND WETLAND VEGETATION/WILDLIFE
    1.5.5 FISHERIES AND AQUATIC RESOURCES
    1.5.6 NOISE
    1.5.7 LAND USE
    1.5.8 AESTHETICS
    1.5.9 CULTURAL RESOURCES
    1.5.10 PUBLIC SERVICES AND UTILITIES
    1.5.11 SOCIOECONOMICS
    1.5.12 EMERGENCY PLANS AND SPILL PREVENTION
 
SECTION 1.6 PERTINENT FEDERAL, STATE AND LOCAL REQUIREMENTS
    1.6.1 TABLE OF APPLICABLE FEDERAL, STATE AND LOCAL PERMIT REQUIREMENTS
    1.6.2 FEDERAL PERMITS
    1.6.3STATE PERMITS
    1.6.4 REGIONAL PERMIT
    1.6.5 COUNTY PERMITS
    1.6.6 CITY PERMITS
 
SECTION 2.1 SITE DESCRIPTION
    2.1.1 LOCATION OF PROJECT
    2.1.2 ROUTE DESCRIPTION
    2.1.3 PUMP STATIONS AND TERMINAL
    2.1.4 PROMINENT GEOGRAPHIC FEATURES
    2.1.5 TYPICAL GEOLOGICAL AND CLIMATOLOGICAL CHARACTERISTICS
    2.1.6 LAND USE PLANS AND ZONING ORDINANCES
 
SECTION 2.2 LEGAL DESCRIPTION AND LAND OWNERSHIP INTERESTS
    2.2.1 LEGAL DESCRIPTIONS
    2.2.2 OWNERSHIP INTERESTS
 
SECTION 2.3 CONSTRUCTION ON SITE
    2.3.1 PROJECT DESCRIPTION
    2.3.2 PIPELINE DESIGN ELEMENTS
    2.3.3 PIPELINE CONSTRUCTION
    2.3.4 VALVES
    2.3.5 PUMP STATIONS
    2.3.6 TERMINAL FACILITY
    2.3.7 PASCO DELIVERY FACILITY
    2.3.8 COMMUNICATION SYSTEM
 
SECTION 2.4 ENERGY TRANSMISSION SYSTEMS
 
SECTION 2.5 WATER SUPPLY SYSTEM
    2.5.1 WATER SUPPLY
    2.5.2 HYDROSTATIC TESTING
 
SECTION 2.6 SYSTEM OF HEAT DISSIPATION
 
SECTION 2.7 CHARACTERISTICS OF AQUATIC DISCHARGE SYSTEMS
    2.7.1 WASTEWATER AND STORM WATER
    2.7.2 HYDROSTATIC TEST WATER
 
SECTION 2.8 WASTEWATER TREATMENT
    2.8.1 WASTEWATER DISCHARGE
 
SECTION 2.9 SPILL PREVENTION AND CONTROL
    2.9.1 REGULATORY REQUIREMENTS
    2.9.2 POTENTIAL RISKS FOR LIQUID PIPELINE RELEASES
    2.9.3 OLYMPIC PIPE LINE COMPANY CURRENT OPERATIONS AND SPILL HISTORY
    2.9.4 SPILL PREVENTION
    2.9.5 SPILL DETECTION
 
SECTION 2.10 SURFACE-WATER RUNOFF AND EROSION CONTROL
    2.10.1 INTRODUCTION
    2.10.2 STORMWATER RUNOFF AND EROSION CONTROL DURING CONSTRUCTION
    2.10.3 STORMWATER MANAGEMENT AND POLLUTION PREVENTION DURING OPERATION
 
SECTION 2.11 EMISSION CONTROL
    2.11.1 INTRODUCTION
    2.11.2 CRITERIA POLLUTANTS
    2.11.3 TOXIC POLLUTANTS
 
SECTION 2.12 CONSTRUCTION AND OPERATION ACTIVITIES
    2.12.1 PIPELINE CONSTRUCTION SCHEDULE AND WORKFORCE
    2.12.2 PUMP STATION AND DELIVERY FACILITY CONSTRUCTION
    2.12.3 KITTITAS TERMINAL CONSTRUCTION
    2.12.4 PIPELINE AND PUMP STATION OPERATION
    2.12.5 KITTITAS TERMINAL OPERATION
 
SECTION 2.13 CONSTRUCTION MANAGEMENT
    2.13.1 CONSTRUCTION MANAGEMENT - ORGANIZATION
    2.13.2 QUALITY ASSURANCE/QUALITY CONTROL
    2.13.3 EQUIPMENT INSPECTION
    2.13.4 SAFETY COMPLIANCE
    2.13.5 QUALITY AND ENVIRONMENTAL COMPLIANCE
 
SECTION 2.14 CONSTRUCTION METHODOLOGY
    2.14.1 INTRODUCTION
    2.14.2 EQUIPMENT ACCESS AT SENSITIVE AREA CROSSINGS
    2.14.3 STREAM AND RIVER CROSSINGS
    2.14.4 IRRIGATION CANAL CROSSINGS
    2.14.5 WETLAND CROSSINGS
 
SECTION 2.15 PROTECTION FROM NATURAL HAZARDS
    2.15.1 POTENTIAL GEOLOGIC AND NATURAL HAZARD MAPS
    2.15.2 EARTHQUAKE HAZARD
    2.15.3 VOLCANIC HAZARD
    2.15.4 FLOOD, IMPACTS AND PROTECTIVE MEASURES
    2.15.5 TSUNAMI, IMPACTS AND PROTECTIVE MEASURES
    2.15.6 STORMS, IMPACTS AND PROTECTIVE MEASURES
    2.15.7 AVALANCHES OR LANDSLIDES (MASS WASTING)
 
SECTION 2.16 SECURITY CONCERNS
    2.16.1 FACILITY ACCESS
    2.16.2 EMERGENCY RESPONSE PLAN
 
SECTION 2.17 STUDY SCHEDULES
    2.17.1 BIOLOGICAL ASSESSMENT
    2.17.2 WETLAND AND NAVIGABLE WATER CROSSINGS
    2.17.3 SENSITIVE PLANT STUDY
    2.17.5 BAT SURVEY OF SNOQUALMIE TUNNEL
    2.17.6 GEOTECHNICAL STUDIES
    2.17.7 EROSION AND SEDIMENT CONTROL PLAN
    2.17.8 CULTURAL RESOURCES
    2.17.9 TRANSPORTATION PLAN
    2.17.10 ADDITIONAL SUBMITTALS
 
SECTION 2.18 POTENTIAL FOR FUTURE ACTIVITIES AT SITE
 
SECTION 3.1 EARTH
    3.1.1 INTRODUCTION
    3.1.2 HAZARD MAPS
    3.1.3 GEOLOGIC SURVEY
    3.1.4 POTENTIAL SEISMIC ACTIVITY
    3.1.5 SOILS
    3.1.6 TOPOGRAPHY
    3.1.7 UNIQUE PHYSICAL FEATURES
    3.1.8 EROSION/ENLARGEMENT OF LAND AREA (ACCRETION)
 
SECTION 3.2 AIR
    3.2.1 AIR QUALITY
    3.2.2 ODOR
    3.2.3 CLIMATE, VISIBLE PLUMES, AND VISIBILITY IMPAIRMENT
    3.2.4 DUST
    3.2.5 MITIGATION MEASURES
 
SECTION 3.3 WATER
    3.3.1 INTRODUCTION
    3.3.2 SURFACE WATER RESOURCES
    3.3.3 RUNOFF AND ABSORPTION
    3.3.4 FLOODS AND FLOODPLAINS
    3.3.5 GROUND WATER RESOURCES
    3.3.6 PUBLIC WATER SUPPLIES
 
SECTION 3.4 PLANTS AND ANIMALS
    3.4.1 UPLAND VEGETATION
    3.4.2 WETLANDS
    3.4.3 HABITAT TYPES AND WILDLIFE USE
    3.4.5 UNIQUE SPECIES
    3.4.6 FISH OR WILDLIFE MIGRATION ROUTES
 
SECTION 3.5 ENERGY AND NATURAL RESOURCES
    3.5.1 INTRODUCTION
    3.5.2 ENERGY AND NATURAL RESOURCES REQUIRED
    3.5.3 SOURCE AND AVAILABILITY OF ENERGY AND NATURAL RESOURCES
    3.5.4 NON-RENEWABLE RESOURCES
    3.5.5 CONSERVATION AND RENEWABLE RESOURCES
 
SECTION 4.1 ENVIRONMENTAL HEALTH
    4.1.1 NOISE
    4.1.2 RISK OF FIRE OR EXPLOSION
    4.1.3 RELEASES OR POTENTIAL RELEASES TO THE ENVIRONMENT
    4.1.4 SAFETY STANDARDS COMPLIANCE
    4.1.5 RADIATION LEVELS
 
SECTION 5.1 LAND AND SHORELINE USE
    5.1.1 RELATIONSHIP TO EXISTING LAND USE, LAND USE PLANS, AND ESTIMATED POPULATION
    5.1.2 HOUSING
    5.1.3 LIGHT AND GLARE
    5.1.4 AESTHETICS
    5.1.5 RECREATION
    5.1.6 HISTORIC AND CULTURAL FEATURES
    5.1.7 AGRICULTURAL CROPS/ANIMALS
 
SECTION 5.2 TRANSPORTATION
    5.2.1 TRANSPORTATION SYSTEMS & VEHICULAR TRAFFIC
    5.2.2 WATERBORNE, RAIL, AND AIR TRAFFIC
    5.2.3 PARKING
    5.2.4 MOVEMENT/CIRCULATION OF PEOPLE OR GOODS
    5.2.5 TRAFFIC HAZARDS
 
SECTION 5.3 PUBLIC SERVICES AND UTILITIES
    5.3.1 EXISTING CONDITIONS
    5.3.2 IMPACTS
    5.3.3 MITIGATION MEASURES
 
SECTION 6.1 AIR QUALITY PERMIT REQUIREMENTS
    6.1.1 PROJECT DESCRIPTION
    6.1.2 REGULATORY REVIEW
    6.1.3 EXISTING AMBIENT AIR QUALITY CONDITIONS
    6.1.4 CLIMATE AND METEOROLOGY
    6.1.5 ESTIMATED POLLUTANT EMISSIONS
    6.1.6 PROJECTED IMPACTS TO AMBIENT OZONE LEVELS
    6.1.7 SUMMARY OF AIR QUALITY IMPACTS AND REGULATORY COMPLIANCE
 
SECTION 7.1 NPDES DISCHARGE PERMITS
 
SECTION 7.2 EMERGENCY PLANS
    7.2.1 REGULATORY OVERVIEW
    7.2.2 TRAINING
    7.2.3 SPILL RESPONSE ACTIONS
    7.2.4 FIRE AND/OR EXPLOSION
 
SECTION 7.3 INITIAL SITE RESTORATION PLAN
    7.3.1 INTRODUCTION
    7.3.2 ASSUMPTIONS
    7.3.3 PREPARATION OF FINAL RESTORATION PLAN
    7.3.4 HAZARDOUS MATERIALS SURVEY
    7.3.5 DEMOLITION AND SALVAGE
    7.3.6 RESTORATION
 
SECTION 8.1 SOCIOECONOMICS
    8.1.1 EXISTING CONDITIONS
    8.1.2 IMPACTS
    8.1.3 MITIGATION
 
SECTION 8.2 CRITERIA, STANDARDS, AND FACTORS UTILIZED TO DEVELOP TRANSMISSION ROUTE
    8.2.1 CRITERIA FOR SITING PIPELINE CORRIDOR
    8.2.2 CRITERIA FOR SITING PUMP STATIONS
    8.2.3 CRITERIA FOR SITING TERMINAL
    8.2.4 CRITERIA FOR EVALUATING ALTERNATIVE CENTERLINE LOCATIONS
    8.2.5ROUTE SELECTION
 
SECTION 9.1 ANALYSIS OF ALTERNATIVES
    9.1.1 INTRODUCTION
    9.1.2 BACKGROUND
    9.1.3 NO ACTION ALTERNATIVE
    9.1.4 CROSS CASCADE ALTERNATIVES
    9.1.5PRELIMINARY ENGINEERING AND ENVIRONMENTAL FEASIBILITY OF ALTERNATIVE CORRIDORS
    9.1.6 SUMMARY AND COMPARISON OF CROSS-STATE CORRIDOR ALTERNATIVES
    9.1.7 DESCRIPTION OF ALTERNATIVE PUMP STATION LOCATIONS
    9.1.8 DESCRIPTION OF ALTERNATE SITES FOR THE KITTITAS TERMINAL
    9.1.9 PROPOSED CORRIDOR

Top of Page


OPL Archive Home | Application | Technical Reports
EIS Process | DEIS | Adjudication | Prefiled Testimony

EFSEC Home Page | CTED Home Page ctedsml.gif (1239 bytes)

http://www.efsec.wa.gov/
Question or Comment?
Contact EFSEC at efsec@cted.wa.gov