| OPL Archive Home
Application
Technical
Reports
EIS Process
DEIS
Adjudication
Prefiled
Testimony
EFSEC Home |
Olympic Cross Cascade Pipeline
Application 96-1 (Revised may 1998) Archive
The following are PDF files.
To obtain a free copy of Adobe Acrobat Reader for reading PDF files follow
this link. 
In the following files, changes made
to the application are indicated by a line along the right margin of the document.
Figures, maps, and some tables are not included with these files. |
SECTION 1.1
DESCRIPTION OF APPLICANT
- 1.1.1 APPLICANT
- 1.1.2 OLYMPIC PIPE LINE COMPANY
- 1.1.3 TEXACO TRADING AND TRANSPORTATION INC
- 1.1.4 ATLANTIC RICHFIELD COMPANY (ARCO)
- 1.1.5 GATX TERMINALS CORPORATION
- 1.1.6 POTENTIAL USERS OF CROSS CASCADE PIPELINE PROJECT
-
- SECTION 1.2 DESIGNATION OF AGENT
-
- SECTION 1.3 ASSURANCES
- 1.3.1 STATEMENT OF FINANCIAL RESPONSIBILITY
- 1.3.2 INSURANCE
-
- SECTION 1.4 MITIGATION MEASURES
- 1.4.1 INTRODUCTION
- 1.4.2 GENERAL CONSTRUCTION MITIGATION PRACTICES
- 1.4.3 PROTECTION FROM NATURAL HAZARDS
- 1.4.4 SPILL PREVENTION
- 1.4.5 EARTH
- 1.4.6 AIR
- 1.4.7 WATER
- 1.4.8 PLANTS AND ANIMALS
- 1.4.9 ENERGY
- 1.4.10 ENVIRONMENTAL HEALTH
- 1.4.11 LAND AND SHORELINE USE
- 1.4.12 TRANSPORTATION
- 1.4.13 PUBLIC SERVICES AND UTILITIES
- 1.4.14 SOCIOECONOMICS
-
- SECTION 1.5 SOURCES OF INFORMATION
- 1.5.1 EARTH
- 1.5.2 AIR
- 1.5.3 WATER
- 1.5.4 UPLAND AND WETLAND VEGETATION/WILDLIFE
- 1.5.5 FISHERIES AND AQUATIC RESOURCES
- 1.5.6 NOISE
- 1.5.7 LAND USE
- 1.5.8 AESTHETICS
- 1.5.9 CULTURAL RESOURCES
- 1.5.10 PUBLIC SERVICES AND UTILITIES
- 1.5.11 SOCIOECONOMICS
- 1.5.12 EMERGENCY PLANS AND SPILL PREVENTION
-
- SECTION 1.6 PERTINENT FEDERAL, STATE AND LOCAL
REQUIREMENTS
- 1.6.1 TABLE OF APPLICABLE FEDERAL, STATE AND LOCAL PERMIT
REQUIREMENTS
- 1.6.2 FEDERAL PERMITS
- 1.6.3STATE PERMITS
- 1.6.4 REGIONAL PERMIT
- 1.6.5 COUNTY PERMITS
- 1.6.6 CITY PERMITS
-
- SECTION 2.1 SITE DESCRIPTION
- 2.1.1 LOCATION OF PROJECT
- 2.1.2 ROUTE DESCRIPTION
- 2.1.3 PUMP STATIONS AND TERMINAL
- 2.1.4 PROMINENT GEOGRAPHIC FEATURES
- 2.1.5 TYPICAL GEOLOGICAL AND CLIMATOLOGICAL CHARACTERISTICS
- 2.1.6 LAND USE PLANS AND ZONING ORDINANCES
-
- SECTION 2.2 LEGAL DESCRIPTION AND LAND OWNERSHIP
INTERESTS
- 2.2.1 LEGAL DESCRIPTIONS
- 2.2.2 OWNERSHIP INTERESTS
-
- SECTION 2.3 CONSTRUCTION ON SITE
- 2.3.1 PROJECT DESCRIPTION
- 2.3.2 PIPELINE DESIGN ELEMENTS
- 2.3.3 PIPELINE CONSTRUCTION
- 2.3.4 VALVES
- 2.3.5 PUMP STATIONS
- 2.3.6 TERMINAL FACILITY
- 2.3.7 PASCO DELIVERY FACILITY
- 2.3.8 COMMUNICATION SYSTEM
-
- SECTION 2.4 ENERGY TRANSMISSION SYSTEMS
-
- SECTION 2.5 WATER SUPPLY SYSTEM
- 2.5.1 WATER SUPPLY
- 2.5.2 HYDROSTATIC TESTING
-
- SECTION 2.6 SYSTEM OF HEAT DISSIPATION
-
- SECTION 2.7 CHARACTERISTICS OF AQUATIC DISCHARGE
SYSTEMS
- 2.7.1 WASTEWATER AND STORM WATER
- 2.7.2 HYDROSTATIC TEST WATER
-
- SECTION 2.8 WASTEWATER TREATMENT
- 2.8.1 WASTEWATER DISCHARGE
-
- SECTION 2.9 SPILL PREVENTION AND CONTROL
- 2.9.1 REGULATORY REQUIREMENTS
- 2.9.2 POTENTIAL RISKS FOR LIQUID PIPELINE RELEASES
- 2.9.3 OLYMPIC PIPE LINE COMPANY CURRENT OPERATIONS AND SPILL
HISTORY
- 2.9.4 SPILL PREVENTION
- 2.9.5 SPILL DETECTION
-
- SECTION 2.10 SURFACE-WATER RUNOFF AND EROSION
CONTROL
- 2.10.1 INTRODUCTION
- 2.10.2 STORMWATER RUNOFF AND EROSION CONTROL DURING
CONSTRUCTION
- 2.10.3 STORMWATER MANAGEMENT AND POLLUTION PREVENTION DURING
OPERATION
-
- SECTION 2.11 EMISSION CONTROL
- 2.11.1 INTRODUCTION
- 2.11.2 CRITERIA POLLUTANTS
- 2.11.3 TOXIC POLLUTANTS
-
- SECTION 2.12 CONSTRUCTION AND OPERATION ACTIVITIES
- 2.12.1 PIPELINE CONSTRUCTION SCHEDULE AND WORKFORCE
- 2.12.2 PUMP STATION AND DELIVERY FACILITY CONSTRUCTION
- 2.12.3 KITTITAS TERMINAL CONSTRUCTION
- 2.12.4 PIPELINE AND PUMP STATION OPERATION
- 2.12.5 KITTITAS TERMINAL OPERATION
-
- SECTION 2.13 CONSTRUCTION MANAGEMENT
- 2.13.1 CONSTRUCTION MANAGEMENT - ORGANIZATION
- 2.13.2 QUALITY ASSURANCE/QUALITY CONTROL
- 2.13.3 EQUIPMENT INSPECTION
- 2.13.4 SAFETY COMPLIANCE
- 2.13.5 QUALITY AND ENVIRONMENTAL COMPLIANCE
-
- SECTION 2.14 CONSTRUCTION METHODOLOGY
- 2.14.1 INTRODUCTION
- 2.14.2 EQUIPMENT ACCESS AT SENSITIVE AREA CROSSINGS
- 2.14.3 STREAM AND RIVER CROSSINGS
- 2.14.4 IRRIGATION CANAL CROSSINGS
- 2.14.5 WETLAND CROSSINGS
-
- SECTION 2.15 PROTECTION FROM NATURAL HAZARDS
- 2.15.1 POTENTIAL GEOLOGIC AND NATURAL HAZARD MAPS
- 2.15.2 EARTHQUAKE HAZARD
- 2.15.3 VOLCANIC HAZARD
- 2.15.4 FLOOD, IMPACTS AND PROTECTIVE MEASURES
- 2.15.5 TSUNAMI, IMPACTS AND PROTECTIVE MEASURES
- 2.15.6 STORMS, IMPACTS AND PROTECTIVE MEASURES
- 2.15.7 AVALANCHES OR LANDSLIDES (MASS WASTING)
-
- SECTION 2.16 SECURITY CONCERNS
- 2.16.1 FACILITY ACCESS
- 2.16.2 EMERGENCY RESPONSE PLAN
-
- SECTION 2.17 STUDY SCHEDULES
- 2.17.1 BIOLOGICAL ASSESSMENT
- 2.17.2 WETLAND AND NAVIGABLE WATER CROSSINGS
- 2.17.3 SENSITIVE PLANT STUDY
- 2.17.5 BAT SURVEY OF SNOQUALMIE TUNNEL
- 2.17.6 GEOTECHNICAL STUDIES
- 2.17.7 EROSION AND SEDIMENT CONTROL PLAN
- 2.17.8 CULTURAL RESOURCES
- 2.17.9 TRANSPORTATION PLAN
- 2.17.10 ADDITIONAL SUBMITTALS
-
- SECTION 2.18 POTENTIAL FOR FUTURE ACTIVITIES AT SITE
-
- SECTION 3.1 EARTH
- 3.1.1 INTRODUCTION
- 3.1.2 HAZARD MAPS
- 3.1.3 GEOLOGIC SURVEY
- 3.1.4 POTENTIAL SEISMIC ACTIVITY
- 3.1.5 SOILS
- 3.1.6 TOPOGRAPHY
- 3.1.7 UNIQUE PHYSICAL FEATURES
- 3.1.8 EROSION/ENLARGEMENT OF LAND AREA (ACCRETION)
-
- SECTION 3.2 AIR
- 3.2.1 AIR QUALITY
- 3.2.2 ODOR
- 3.2.3 CLIMATE, VISIBLE PLUMES, AND VISIBILITY IMPAIRMENT
- 3.2.4 DUST
- 3.2.5 MITIGATION MEASURES
-
- SECTION 3.3 WATER
- 3.3.1 INTRODUCTION
- 3.3.2 SURFACE WATER RESOURCES
- 3.3.3 RUNOFF AND ABSORPTION
- 3.3.4 FLOODS AND FLOODPLAINS
- 3.3.5 GROUND WATER RESOURCES
- 3.3.6 PUBLIC WATER SUPPLIES
-
- SECTION 3.4 PLANTS AND ANIMALS
- 3.4.1 UPLAND VEGETATION
- 3.4.2 WETLANDS
- 3.4.3 HABITAT TYPES AND WILDLIFE USE
- 3.4.5 UNIQUE SPECIES
- 3.4.6 FISH OR WILDLIFE MIGRATION ROUTES
-
- SECTION 3.5 ENERGY AND NATURAL RESOURCES
- 3.5.1 INTRODUCTION
- 3.5.2 ENERGY AND NATURAL RESOURCES REQUIRED
- 3.5.3 SOURCE AND AVAILABILITY OF ENERGY AND NATURAL RESOURCES
- 3.5.4 NON-RENEWABLE RESOURCES
- 3.5.5 CONSERVATION AND RENEWABLE RESOURCES
-
- SECTION 4.1 ENVIRONMENTAL HEALTH
- 4.1.1 NOISE
- 4.1.2 RISK OF FIRE OR EXPLOSION
- 4.1.3 RELEASES OR POTENTIAL RELEASES TO THE ENVIRONMENT
- 4.1.4 SAFETY STANDARDS COMPLIANCE
- 4.1.5 RADIATION LEVELS
-
- SECTION 5.1 LAND AND SHORELINE USE
- 5.1.1 RELATIONSHIP TO EXISTING LAND USE, LAND USE PLANS, AND
ESTIMATED POPULATION
- 5.1.2 HOUSING
- 5.1.3 LIGHT AND GLARE
- 5.1.4 AESTHETICS
- 5.1.5 RECREATION
- 5.1.6 HISTORIC AND CULTURAL FEATURES
- 5.1.7 AGRICULTURAL CROPS/ANIMALS
-
- SECTION 5.2 TRANSPORTATION
- 5.2.1 TRANSPORTATION SYSTEMS & VEHICULAR TRAFFIC
- 5.2.2 WATERBORNE, RAIL, AND AIR TRAFFIC
- 5.2.3 PARKING
- 5.2.4 MOVEMENT/CIRCULATION OF PEOPLE OR GOODS
- 5.2.5 TRAFFIC HAZARDS
-
- SECTION 5.3 PUBLIC SERVICES AND UTILITIES
- 5.3.1 EXISTING CONDITIONS
- 5.3.2 IMPACTS
- 5.3.3 MITIGATION MEASURES
-
- SECTION 6.1 AIR QUALITY PERMIT REQUIREMENTS
- 6.1.1 PROJECT DESCRIPTION
- 6.1.2 REGULATORY REVIEW
- 6.1.3 EXISTING AMBIENT AIR QUALITY CONDITIONS
- 6.1.4 CLIMATE AND METEOROLOGY
- 6.1.5 ESTIMATED POLLUTANT EMISSIONS
- 6.1.6 PROJECTED IMPACTS TO AMBIENT OZONE LEVELS
- 6.1.7 SUMMARY OF AIR QUALITY IMPACTS AND REGULATORY COMPLIANCE
-
- SECTION 7.1 NPDES DISCHARGE PERMITS
-
- SECTION 7.2 EMERGENCY PLANS
- 7.2.1 REGULATORY OVERVIEW
- 7.2.2 TRAINING
- 7.2.3 SPILL RESPONSE ACTIONS
- 7.2.4 FIRE AND/OR EXPLOSION
-
- SECTION 7.3 INITIAL SITE RESTORATION PLAN
- 7.3.1 INTRODUCTION
- 7.3.2 ASSUMPTIONS
- 7.3.3 PREPARATION OF FINAL RESTORATION PLAN
- 7.3.4 HAZARDOUS MATERIALS SURVEY
- 7.3.5 DEMOLITION AND SALVAGE
- 7.3.6 RESTORATION
-
- SECTION 8.1 SOCIOECONOMICS
- 8.1.1 EXISTING CONDITIONS
- 8.1.2 IMPACTS
- 8.1.3 MITIGATION
-
- SECTION 8.2 CRITERIA, STANDARDS, AND FACTORS UTILIZED
TO DEVELOP TRANSMISSION ROUTE
- 8.2.1 CRITERIA FOR SITING PIPELINE CORRIDOR
- 8.2.2 CRITERIA FOR SITING PUMP STATIONS
- 8.2.3 CRITERIA FOR SITING TERMINAL
- 8.2.4 CRITERIA FOR EVALUATING ALTERNATIVE CENTERLINE LOCATIONS
- 8.2.5ROUTE SELECTION
-
- SECTION 9.1 ANALYSIS OF ALTERNATIVES
- 9.1.1 INTRODUCTION
- 9.1.2 BACKGROUND
- 9.1.3 NO ACTION ALTERNATIVE
- 9.1.4 CROSS CASCADE ALTERNATIVES
- 9.1.5PRELIMINARY ENGINEERING AND ENVIRONMENTAL FEASIBILITY OF
ALTERNATIVE CORRIDORS
- 9.1.6 SUMMARY AND COMPARISON OF CROSS-STATE CORRIDOR
ALTERNATIVES
- 9.1.7 DESCRIPTION OF ALTERNATIVE PUMP STATION LOCATIONS
- 9.1.8 DESCRIPTION OF ALTERNATE SITES FOR THE KITTITAS TERMINAL
- 9.1.9 PROPOSED CORRIDOR
Top of Page |