|
|
|
Kittitas Valley Wind Power Project
Addendum to Draft Environmental Impact Statement Addendum to Draft Environmental Statement (82 pages, pdf, 3.1 MB) Appendix A: October 2004 and November 2005 Shadow Flicker Simulations (29 pages, pdf, 5 MB)
Public Reference: Copies of the Kittitas Valley Wind Power Project Addendum to the Draft EIS will be available for Public Reference at the following locations. Cle Elum: Carpenter Memorial (Cle Elum) Library Hours:
Ellensburg: Ellensburg Public Library
Brooks Library Olympia: Washington State Library
Washington Energy Facility How to Obtain a Copy: The Kittitas Valley Wind Power Project Addendum to the Draft EIS is available to interested persons upon request in hard copy format. To obtain a copy contact:
Back to Kittitas Valley Wind Power Project Page |