1.1
Description of Applicant
1.2
Designation of Agent
1.3
Assurances
1.4
Mitigation Measures
1.6 Pertinent Federal, State, and Local Requirements
2.1
Site Description
2.2
Legal Descriptions and Ownership Interests
2.3
Construction On-Site
2.4
Energy Transmission Systems
2.5
Water Supply System
2.6
System of Heat Dissipation
2.8
Wastewater Treatment
2.9
Spillage Prevention and Control
2.10
Surface Water Runoff
2.11
Emission Control
2.12
Construction Schedule And Operation Activities
2.13
Construction Management
2.14
Construction Methodology
2.15 Protection From Natural Hazards
2.16
Security Concerns
2.17
Study Schedules
2.18
Potential For Future Activities At Site
3.1
Earth
3.2
Air
3.3
Water
3.4
Plants And Animals
3.5
Energy and Natural Resources
4.1
Environmental Health
5.1
Land Use
5.2
Traffic and Transportation
5.3
Public Services And Utilities
6.1
Prevention Of
Significant Deterioration
7.1
National Pollutant Discharge Elimination System (NPDES) Permit
Application
NPDES application form
7.2
Emergency Plans
7.3
Initial Site
Restoration Plan
8.1
Socioeconomic Impact
8.2
Criteria, Standards, And Factors Utilized To Develop Transmission Route
9.1
Analysis Of Alternatives
VOLUME II: Exhibits
Exhibit
1 Project
Site Layout
Exhibit
2 Aerial
Photo with Project Site Layout
Exhibit
3 Project
Electrical One-Line Diagram
Exhibit
4 Memoranda
of Landowner Option Agreements
Exhibit
5 WA
DNR Letter of Intent
Exhibit
6 Geotechnical
Data Report, Exhibit
6.1, Exhibit
6.2
Exhibit
7 Letters
to the Yakama Nation
Exhibit
8 Rare
Plant Report
Exhibit
9 Project
Habitat Map, Map
Legend
Exhibit
10 Mitigation
Parcel Description
Exhibit
11 Wildlife
Baseline Study
Exhibit
12 Biological
Assessment for Endangered, Threatened, Proposed & Candidate Species, Exhibit
12.1
Exhibit
13 Department
of Ecology Well Logs for the Project Area
Exhibit
14 Telecommunications
Obstruction Analysis
Exhibit
15 Kittitas
County Code, Utilities, Chapt 17.62 and Amendments -Ordinance
2002-19
Exhibit
16
Project
Site Archaeological Survey
This document is not available in electronic format.
Exhibit
17 Transportation and Traffic
Figures
17-1 Project
Site and Surrounding Roadway Network
17-2 Transportation
Routes & Existing Average Daily Traffic Volume
Exhibit
18 Project
Area Zoning Designations, Aerial Photo
Exhibit
19
Project
Area Fire Districts
Exhibit
20 Recreational
Areas Surrounding Project Site (25 miles)
Exhibit
21 Noise
Analysis Figures
21-1 House
and Wind Turbine Generator Locations
21-2 Noise
Impacts Zones
Exhibit
22 Visual Simulation Figures and
Terms
22-2 Potential
Local Project Visual Impact
22-3 Visual
Simulation Technical Terms
22-4 Visual
Simulation Photos
Exhibit
23 ECONorthwest
Economic Impact Report
Back
to