|
|
|
Kittitas Valley Wind Power Project
To obtain a hard copy of the FEIS, call EFSEC at 360-956-2121 and ask for the Kittitas Valley Wind Power Project FEIS. Please use the links below to view the text of the Final Environmental Impact Statement issued by EFSEC on February 1, 2007.
Final Environmental Impact Statement Volume 1 Table of Contents (including list of figures and tables) Table 1-4 Summary of Impacts and Mitigation Table 1-5 Summary of Potential Impacts of Offsite Alternatives CHAPTER 2: PROPOSED ACTION AND ALTERNATIVES
CHAPTER 3: AFFECTED ENVIRONMENT, SIGNIFICANT IMPACTS, AND MITIGATION MEASURES
CHAPTER 5: ACRONYMS AND ABBREVIATIONS Appendix A: Vegetation, Wetlands, Wildlife, and Threatened and Endangered Species; Table A-1; Table A-2
Appendix B:
Health and Safety
- Shadow Flicker Simulations Appendix C: Transportation - 9 pages, 4.5 MB Appendix D: Noise - LARGE FILE! 8 pages, 12 MB List of Figures Figure 1-1: Vicinity Map Figure 1-2: Project Site MapFigure 2-1: Project Site Layout Figure 2-2: Typical Wind Turbine Dimensions Figure 2-3: Typical Modern Three-Bladed Upwind Turbine Generator Figure 2-4: Typical Nacelle Figure 2-5: Electrical and Communications System Figure 2-6: Comparison of Various Wind Turbine Technologies Figure 2-7: Alternative A Site Layout Figure 2-8: Areas Investigated for Wind Energy Development Figure 2-9: Swauk Ranch Figure 2-10: Springwood Ranch Figure 2-11: Manastash Ridge Figure 2-12: Boylston Mountains Figure 2-13: Skookumchuck Creek Figure 2-14: Quilomene Figure 2-15: Swauk Valley Ranch Figure 2-16: Springwood Ranch Figure 2-17: Wild Horse Figure 2-18: Desert Claim Figure 3.1-1: Geotechnical Test Pit and Fault Locations Figure 3.1-2: Soils Figure 3.2-1: Vegetation Types Figure 3.2-2: Stream Survey Locations Figure 3.2-3: Approximate Perches and Flight Paths of Bald Eagles Figure 3.2-4: Approximate Raptor Nest Locations Figure 3.2-5: Mule Deer and Elk Winter Ranges Figure 3.4-1: 1996-2000 Lighting Flash Density Figure 3.4-2: Typical Electromagnetic Levels for Transmission Lines Figure 3.6-1: Existing Land Use Figure 3.6-2: Existing Zoning Figure 3.6-3: Recreational Areas Figure 3.7-1: Construction Employment Schedule Figure 3.9-1: Photograph Locations Outside Project Area Figure 3.9-2: Photograph Locations Within Project Area Figure 3.9-3: pdf Viewpoint 1: US 97 at Ellensburg Ranches RoadFigure 3.9-4: pdf Viewpoint 2: US 97 North of the Gravel Pit Figure 3.9-5: pdf Viewpoint 3: US 97 northern end of Bettas Rd Figure 3.9-6: pdf Viewpoint 4: Ridges East of US 97 Figure 3.9-7: pdf Viewpoint 5: Northern portion of Bettas Rd Figure 3.9-8: pdf Viewpoint 6: SR 10 CorridorFigure 3.9-9: pdf Viewpoint 7: John Wayne Trail looking NorthFigure 3.9-10: pdf Viewpoint 8: Thorp Hwy looking North Figure 3.9-11: pdf Viewpoint 9: I-90 & Springwood Ranch Figure 3.9-12: pdf Viewpoint 10: Lower Green Canyon Rd Figure 3.9-13: pdf Viewpoint 11: Forest Service Lands Figure 3.9-14: pdf Viewpoint 12: Robertson Property Figure 3.9-15: FAA Nighttime Lighting of Turbines Figure 3.9-16: pdf Simulated comparison Grey to Brown Turbines Figure 3.10-1: Existing Average Daily Traffic Volumes for 2001 Figure 3.10-2: Bowers Field Figure 3.11-1: Kittitas Valley Area Wind Rose Figure 3.12-1: Noise Monitoring Locations Figure 3.13-1: Fire Districts Figure 3.14-1: Cumulative Study Area for Kittitas Valley, Desert Claim, and Wild Horse Figure 3.14-2: Photograph Locations for Cumulative Analysis Figure 3.14-3: pdf Viewpoint 1: Existing ConditionsFigure 3.14-4: pdf Viewpoint 1: Simulated Conditions Kittitas Valley Wind Power Project Figure 3.14-5: pdf Viewpoint 1: Simulated Conditions Desert Claim Wind Power Project Figure 3.14-6: pdf Viewpoint 1: Simulated Conditions Cumulative Scenario Figure 3.14-7: pdf Viewpoint 2: Existing Conditions Figure 3.14-8: pdf Viewpoint 2: Simulated Conditions Cumulative ScenarioVolume 2 Introduction to Volume 2, Responses to Comments Letters Draft Supplemental EIS Comments Public Comment Meeting January 13, 2004 Public Comment Meeting August 25, 2004 Public Comment Meeting February 2, 2006 Responses to Letters tate AgencyDraft Supplemental EIS Comments Public Comment Meeting January 13, 2004 Public Comment Meeting August 25, 2004 Public Comment Meeting February 2, 2006 Public Reference: Copies of the Kittitas Valley Wind Power Project DEIS will be available for Public Reference at the following locations. Cle Elum: Carpenter Memorial (Cle Elum) Library Hours:
Ellensburg: Ellensburg Public Library 509-962-7250 Olympia: Washington State Library
Washington Energy Facility How to Obtain a Copy: The Kittitas Valley Wind Power Project FEIS is available to interested persons upon request in both hard copy and CD-ROM formats. To obtain a copy contact:
Back to Kittitas Valley Wind Power Project Page |