|









|
BP
Cherry Point Cogeneration Project
Application for Site Certification 2002- 01
Figures and Tables as PDF Files
The following are PDF files.
To obtain a free copy of Adobe Acrobat Reader for reading PDF files follow
this link.
These files are offered for
informational purposes only.
Please refer to a copy of the
Application for Site Certification for exact figures and drawings.
Contact Michelle
Elling to report incorrect links.
|
- Appendix
A: Technical Report on Assurances (3 pages, 10.7 KB)
-
Appendix
B: General Sources of Information (
19
pages, 150 KB)
- Appendix
C: Legal Descriptions and Ownership Interests (6 pages,
16.8 KB)
Appendix
D: Project Description ( 65
pages, 384.5 KB)
Chapter 1 Cogeneration Project Description
Figure 1.0-1 Project
Location Map
Figure 1.0-2 Existing
Utility Infrastructure
Figure 1.0-3
Comprehensive Planning Land Use Map
Figure 1.0-4 Cherry
Point Zoning Map
Chapter 2 On-Site Facilities
Figure 2.2-1
Facility Site Map
Figure 2.2-2
Rendering of Cogeneration Project
Figure 2.3-1
Schematic Cogeneration Diagram
Figure 2.3-2
Cogeneration Project Integration with Refinery
Table 2.3-1 Performance
Summary
Table 2.3-2
Heat and Material Balance
Table 2.3-3 Emission
Summary Table
Table 2.3-4 Refinery Emission Reduction Summary Table
Chapter 3 Electrical Transmission Systems
Figure 3.1-1
Conceptual Monopole Tower
Figure 3.1-2
Conceptual Lattice Tower
Figures 3.3-1 through 4 Water
Rights
Figure 3.11-4a and 4b Visual Simulation
Chapter 4 Fuel System
Table 4.1-1 Natural
Gas Analysis
Chapter 5 System of Heat Dissipation
Figure 5.0-1
Schematic Illustration of One Cell of Condensor
Chapter 6 Water Supply System
Table 6.2.1 Water Usage
Table 6.2.2 Water Usage Variation
Table 6.3-1
Whatcom PUD Source Water Quality
Chapter 7 Wastewater Treatment and Disposal
Table 7.1-1
Wastewater Flows and Chemical Composition
Chapter 8 Characteristics of Aquatic Discharge System
Figure 8.1-1
Outfall 001 Location
Figure 8.1-2
Discharge Diffuser Details
-
-
Table 8.2.1 Impact to Refinery Wastewater Flow

Chapter 9 Spill Prevention and Control
Table 9.1-1
Chemicals to be Used During Construction
Table 9.1-2
Chemicals
Used During Operations and Maintenance
Table 9.1-3 Estimated
Waste Streams During Operations
Table 9.2-1 Storage
Tank and Sumps Description
Chapter 10 Surface Water Runoff
Chapter 11 Emission Control
Figure 11.1-1
HRSG, SCR Simplified Schematic Control Diagram
Chapter 12 Operation Workforce and Maintenance Activities
Figure 12.1-1
Construction Schedule
Table 12.3-1
Maintenance Schedule
Chapter 13 Construction of the Cogeneration Project
Figure 13.3-1
Delineated Wetlands and Cogeneration Project Site
Figure 13.8-1
Project Construction Organization Chart
Table 13.2-1 Expected
Construction Work Force
Table 13.5-1
Construction Equipment
Table 13.5-2
Construction Waste Streams
Table 13.6-1
Construction Transportation Requirements
Table 13.6-2 Heavy
Equipment and Weights List
Chapter 14 Capitol Costs
Table 14.0-1 Cost
Estimate of the Cogeneration Project
-
Appendix
E: Air Quality (
114
pages, 555 KB)
PSD Applicability Form

Notice of Construction and Application for Approval

-
Figure 2-1 Regional Map
Figure 2-2 Vicinity Map
Figure 2-3 Site Plan
-
Appendix
F: Water (
51
pages, 281.3 KB)
Attachment A - Stormwater Memo (6 pages, 242.8 KB)
-
Figures:
Figure 3.0-1
Cogeneration Project Location Map
Figure 4.1-1 Surface
Water Drainage Basin Map
Figure 4.1-2 Site
Topography and Drainage
Figure 4.1-3
Cogeneration Project Flood Hazards
Figure 4.2-1 Surface
Geology of Mountain View Upland
Figure 4.2-2 Well
Location and Cross-Sections
Figure 4.2-3 Cross
Section A-A'
Figure 4.2-4 Cross
Section B-B'
Figure 4.2-5 Cross
Section C-C'
Figure 4.2-6
Stratigraphic Cross Section D-D'
Figure 4.2-7
Monitoring Well Locations
Figure 4.2-8
Groundwater Flow
Figure 4.2-9 Aquifer
Gradient and Flow
Figure 5.2-1 Water
Balance
-
-
Figure 1A Attachment A Construction Stormwater Plan

-
Figure 1B Attachment A Construction Stormwater Plan

Tables:
Table 4.2-1 Geologic Deposits
Table 5.1-1 Water Rights
Table 5.1-2 Pending Water Right Applications
Table 5.2-1
Water Usage
Variation
-
Table 5.2.2 Water Usage

-
Table 5.2.3 Source Water Quality

Table 5.3-1 Chemicals Used During Construction
Table 5.3-2 Construction Waste Streams
Table 5.3-4 Chemicals Used During Operation
Table 5.3-5 Storage Tank and Sumps Description
-
Table 5.3.6 Waste Streams During Operation

Table 5.4-1 Wastewater Flows and Chemical Composition
-
Table 5.4-2 Impact to Refinery Wastewater Flow

Appendix
G: Earth (36 pages, 163 KB)
Chapter 1 Topography
Figure 1.0-1 Project
Location
Figure 1.0-2 Topographic Map
Figure 1.0-3 Cogen Project
Site Topography
Chapter 2 Geology
Figure 2.1-1 Regional
Physiography
Figure 2.1-2 Geologic Map
Figure 2.2-1 Well Locations
and Cross Section Locations
-
Figure
2.2-2 Cross Section A-A'

Figure 2.2-3 Cross Section
B-B'
Figure 2.2-4 Cross Section
C-C'
Figure 2.2-5 Cross Section
D-D'
Chapter 3 Soils
Figure 3.0-1 Soil Types
Chapter 4 Natural Hazards
Figure 4.3-1 Tectonic Setting
Figure 4.3-2 Principal
Tectonic Features
Figure 4.3-3 Uniform Building
Code Seismic Zones
Figure 4.3-4 Seismotectonic
Map
Figure 4.4-1 Mount Baker
Volcanic Hazards
Figure 4.4-2 Cascade
Volcanoes Tephra Hazards
Figure 4.4-3 Mount Baker
Blast Zone
-
Appendix
H:
H1
JARPA (7 pages, 204 KB)
-
Figure 1-1 Project Vicinity Map
-
Figure 1-2a Project Laydown Area and Affected Wetlands
-
Figure 1-2b Delineated and Impacted Wetlands
-
Figure 1-3a Project Laydown Area and Affected Wetlands Cont.
-
Figure 1-3b Project Plot Plan and Impacted Wetlands
-
Figure 1-4a Cross Sections A-A' and B-B'
-
Figure 1-4b Cross Sections A-A' and B-B'
-
H2
Wetland
Delineation (56 pages, 259 KB)
-
Figure 2-1 Site Vicinity Map
-
Figure 2-2 National Wetlands Inventory Map
-
Figure 2-3 Soil Survey Map
-
Figure 2-4a CMA1 Existing Conditions
-
Figure 2-4b CMA2 Existing Conditions
Appendix A
- Site Photographs
-
Photo
2
Emergent Wetland Complex
-
Photo 4 Emergent wetlands showing forested patch
-
Photo 6 Emergent wetlands with upland/wetland forested mosaic
-
Photo 8 Uprooted tree within forested area
-
Appendix B - Wetland Rating Field Data Forms (72 pages, 3030 KB)
Appendix C - Project Area Wetland Data Forms (193 pages, 7224 KB)
H3
Wetland
Functions and Values Assessment (52 pages, 273 KB)
-
Figure 3-1 Impacted Wetlands within Study Area
-
Figure 3-2 Project Area Sub-basin Delineation
-
Technical Report on Wetland Functions and Values Assessment
H4
Siting and
Wetland 404(b)1 Alternatives Analysis (29
pages, 201 KB)
-
Figure
4-1 Cherry Point
Cogeneration Project Location Map
Figure
4-2 USGS Project Area
Location
Figure
4-3 NWI Map for Project
Area
Figure
4-4 Whatcom County Soil
Survey
Figure
4-5 Surrounding Areas
Vegetation/Habitat Map (View 1)
Figure
4-6 Vegetation Map (View
2)
Figure
4-7 Delineated and
Impacted Wetlands
Figure
4-8 Tree Planting Status
H5
Biological
Evaluation (51 pages, 302 KB)
Appendix A Endangered Species Act List Species (55 pages, 1237 KB)
-
Figure 5-1 Project Vicinity Map
-
Figure 5-2 Proposed Cogeneration Site and Surrounding Areas
-
Figure 5-6 Culvert Photo
-
Figure 5-6a Design Basis Construction Stormwater Control System
-
Figure 5-6b Design Basis Operational Stormwater Control System
-
Figure 7 Culvert Photo
-
-
Table 5-1 Waste Water Flow and Composition
-
Table 5-2 Impact to Refinery Wastewater Flow
-
Table 5-3 Stormwater Events
-
Table 5-4 Plant Species
-
Table 5-5 Environmental Baseline Checklist
H6
Delineation of Mitigation (34 pages,
258 KB)
-
H7
Mitigation Plan (92 pages, 478 KB)
-
Figure 7-2 Impacted Wetlands and Restoration Areas
-
Figure 7-3 Restoration Areas Plan Topography and Plant Community
Distribution
-
Figure 7-4 Properties Considered for Off-site Compensatory Mitigation
-
Figure 7-5a CMA1 Existing Conditions
-
Figure 7-5b CMA2 Existing Conditions
-
Figure 7-6a Existing Surface and Subsurface Hydrologic Pathways in and
Downslope of CMA1
-
Figure 7-6b Existing Mitigation Surface and Subsurface Hydrologic Pathways
in and Downslope of CMA2
-
Figure 7-7a CMA1 Reed and Canarygrass Cover Distribution
-
Figure 7-7b CMA2 Reed and Canarygrass Cover Distribution
-
Figure 7-8a CMA1 Topography and Hydrologic Modifications
-
Figure 7-8b CMA1 Ditch Filling Cross Sections
-
Figure 7-9a CMA2 Topography and Hydrologic Modifications
-
Figure 7-9b CMA2 Ditch Filling Cross Sections
-
Figure 7-9c CMA2 Inlet Channel Design
-
Figure 7-9d Typical Swale Cross Section
-
Figure 7-10a Post Mitigation Surface and Subsurface Hydrologic Pathways in
and Downslope of CMA1
-
Figure 7-10b Post Mitigation Surface and Subsurface Hydrologic Pathways in
and Downslope of CMA2
-
Figure 7-11a CMA1 Plan Topography and Plant Community Distribution
-
Figure 7-11b CMA2 Plan Topography and Plant Community Distribution
-
-
Appendix
I: Traffic and Transportation (
34
pages, 226 KB)
-
Figure 1 Project Location Map
Figure 2 Project Site Plan
Figure 3 Existing Roadway
Characteristics
Figure 4 Average Daily Traffic
Volume Counts
Figure 5 Projected 2001 Average
Daily Traffic Volumes
Figure 6 2001 PM Peak Hour
Traffic Volumes
Figure 7 Project Trip
Distribution
Figure 8 2004 PM Peak Hour
Volumes with Project
Figure 9
2004 PM Peak Hour Volumes without Project
-
Appendix
J: Emergency and Security Plans (
34
page, 171 KB)
- Appendix
K: Noise (25 pages, 116 KB)
Hessler Memo ( 8
pages, 198 KB)
-
Figure 1 Project Location Map
Figure 2 Noise Measurement Survey
-
Appendix
L: Population, Housing, and Economics (
46 pages,
319 KB)
-
Appendix
M: Initial Site Restoration Plan (
11 pages,
80.3 KB)
Appendix N:
Study Schedules ( 4 pages,
49.4 KB)
Appendix
O: Proposed Mitigation Measures ( 33 pages, 194.3 KB)
Back
to the Main Appendix Page
Back to
the Application for Site Certification Table of Contents
Back to
BP Cogen Page
Top of Page
|