BP Cherry Point Cogeneration Project
Final Environmental Impact Statement
Table of Contents and Volume 1


To obtain a hard copy of the Final EIS, call EFSEC at 360-956-2121 and ask for the BP Cherry Point FEIS.  Please use the links below to view the text of the Final Environmental Impact Statement issued by the Council and Bonneville Power Administration on August 20, 2004.

Additional information: Notice of Issuance of Final EIS  (pdf format)

BP Cherry Point Cogeneration Project FEIS

Volume 1: Final EIS

Volume 2: Responses to Comments

 

The following are PDF files. 
  To obtain a free copy of Adobe Acrobat Reader for reading PDF files follow this link. getacro.gif (712 bytes)   

 

Final Environmental Impact Statement

PLEASE NOTE:  

For security purposes, some of the maps and related graphics have been removed from the electronic versions of all documents related to the BP Cherry Point Project on this web site. To obtain printed copies of these omitted items, please write to:  

Thomas McKinney
Bonneville Power Administration
905 NE 11th Ave
Portland, OR, 97205

Cover letter

Fact Sheet

Table of Contents (including list of figures and tables)

CHAPTER 1: SUMMARY

CHAPTER 2: PROPOSED ACTION AND ALTERNATIVES

CHAPTER 3: EXISTING CONDITIONS, IMPACTS, AND MITIGATION MEASURES

Introduction
3.1       Earth
3.2       Air Quality
3.3       Water Resources
3.4       Water Quality
3.5       Wetlands
3.7       Upland Vegetation, Wildlife and Habitat, Fisheries, and Threatened and Endangered Species
3.8       Energy and Natural Resources
3.9       Noise
3.10     Land Use
3.13     Public Services and Utilities
3.14     Cultural Resources
3.15     Traffic and Transportation
3.16     Health and Safety
 

CHAPTER 4: REFERENCES

CHAPTER 5: ACRONYMS AND ABBREVIATIONS

CHAPTER 6: LIST OF PREPARERS

CHAPTER 7: DISTRIBUTION LIST

 

APPENDICES 

Appendix A:      404(b) 1 Alternative Analysis

Appendix B:      Air Emissions Modeling Isopleths

Appendix C:      Final Cogeneration Project Compensatory Mitigation Plan

Appendix D:     Agency Consultation

  • Office of Archeology and Historic Preservation (OAHP)

  • Department of the Army (to OAHP)

  • Department of Energy (to National Oceanic and Atmopsheric Administration (NOAA))

  • NOAA

  • Department of Energy (to US Fish and Wildlife Service)

  • US Fish and Wildlife Service

 

FIGURES

Figure 1-1:        Project Vicinity Map

Figure 1-2:        Typical Transmission Tower Designs

Figure 1-3:        Cogeneration Facility Infrastructure and Refinery Interconnections

Figure 2-4:        Alternative Cogeneration Site Locations

Figure 3.2-1:      Airsheds of Interest within 125 Miles of Project Site (11x17) (3.3 MB)

Figure 3.3-4:      Floodplains

Figure 3.3-8:     Design Basis for Operational Stormwater Control System (11x17)

Figure 3.5-2:      Site Vegetation (11x17) (4.5 MB)

Figure 3.5-3:      Proposed Wetland Mitigation Areas

Figure 3.15-7:    Projected 2004 PM Peak-Hour and Average Weekday Traffic Volumes with Project (11x17)

FEIS Volume 2: Responses to Comments

 

Back to BP Cogen Page

Top of Page

Home Page | About EFSEC | Certification | Energy Facilities 
Laws & Rules
|
Rulemaking | Meetings | Staff Contacts  
Site Map | Links | Privacy Notice   

Washington State Community, trade and Economic Development Logo Department of Community, Trade and Economic Development  

Access Washington Logo   Access Washington

www.efsec.wa.gov
Question or Comment? Contact EFSEC at efsec@cted.wa.gov