BP Cherry Point Cogeneration Project To obtain a hard copy of the Final EIS, call EFSEC at 360-956-2121 and ask for the BP Cherry Point FEIS. Please use the links below to view the text of the Final Environmental Impact Statement issued by the Council and Bonneville Power Administration on August 20, 2004. Additional information: Notice of Issuance of Final EIS (pdf format) BP Cherry Point Cogeneration Project FEIS Volume 1: Final EIS
Volume 2: Responses to Comments
Final Environmental Impact Statement PLEASE NOTE: For security purposes, some of the maps and related graphics have been removed from the electronic versions of all documents related to the BP Cherry Point Project on this web site. To obtain printed copies of these omitted items, please write to:
Thomas McKinney Table of Contents (including list of figures and tables) CHAPTER 2: PROPOSED ACTION AND ALTERNATIVES CHAPTER 3: EXISTING CONDITIONS, IMPACTS, AND MITIGATION MEASURES 3.1 Earth 3.2 Air Quality 3.3 Water Resources 3.4 Water Quality 3.5 Wetlands 3.7 Upland Vegetation, Wildlife and Habitat, Fisheries, and Threatened and Endangered Species 3.8 Energy and Natural Resources 3.9 Noise 3.10 Land Use 3.13 Public Services and Utilities 3.14 Cultural Resources 3.15 Traffic and Transportation 3.16 Health and Safety CHAPTER 4: REFERENCES CHAPTER 5: ACRONYMS AND ABBREVIATIONS
Appendix A: 404(b) 1 Alternative Analysis Appendix B: Air Emissions Modeling Isopleths
Appendix C: Final Cogeneration Project Compensatory Mitigation Plan
Appendix F: Wetland Mitigation and the Birch Bay Great Blue Heron Colony
Appendix D: Agency Consultation
Figure 1-1: Project Vicinity Map Figure 1-2: Typical Transmission Tower Designs Figure 1-3: Cogeneration Facility Infrastructure and Refinery Interconnections Figure 2-4: Alternative Cogeneration Site Locations Figure 3.2-1: Airsheds of Interest within 125 Miles of Project Site (11x17) (3.3 MB) Figure 3.3-4: Floodplains Figure 3.3-8: Design Basis for Operational Stormwater Control System (11x17) Figure 3.5-2: Site Vegetation (11x17) (4.5 MB) Figure 3.5-3: Proposed Wetland Mitigation Areas Figure 3.15-7: Projected 2004 PM Peak-Hour and Average Weekday Traffic Volumes with Project (11x17) FEIS Volume 2: Responses to Comments