Proponent: |
Invenergy LLC
2580 W. Main Street, #200
Littleton, CO 80120
(303) 730-1538 |
| Proposed
Facility: |
New Units 3 and 4 consisting of
2
combined cycle natural
gas-fired
combustion turbines and 1 steam generator
totaling
650
MW |
| Location: |
Elma,
Grays
Harbor County |
|
Amendment Request Date: |
October 30,
2009 |
|
Status: |
|
Amendment request approved by Governor on February 18, 2011.
Construction of the expansion has not begun.
|
|
General Description
of the Amendment Request:
Grays Harbor Energy LLC (the
Certificate Holder) proposed an increase of the
Satsop Combustion Turbine (CT) Project's maximum generating capacity by
approximately 650 megawatts (MW) to approximately 1,300 MW. As with
the existing facility (Phase 1 - Units 1 and 2), the addition would consist
of two gas turbines and one steam turbine in a 2-on-1 configuration that
would generate electricity to supply growing regional electrical demand.
The new facilities are referred to as (Phase 2 - Units 3 and 4) (artist illustration).
The October 30, 2009 Amendment
Request No. 5 specifically asked EFSEC to:
-
Change the name of the project from the Satsop CT Project to the Grays
Harbor Energy Center (GHEC).
-
Allow the addition of two combustion turbine generators and one steam
generator (Units 3 and 4) to increase the facility capacity by 650 MW to
approximately 1,300 MW.
-
Enlarge the project site by 10 acres to allow space for construction
laydown and access. (The Certificate Holder subsequently modified this
portion of the request. The
Certificate Holder will temporarily lease land from the Grays Harbor
Public Development Authority (PDA) to serve as a construction laydown
area.)
-
Approve a PSD permit for Units 3 and 4 (existing PSD permit would remain
in place for Units 1 and 2).
-
Increase the total maximum water withdrawal from 9.2 cfs to 16 cfs. No
new water authorizations are requested.
The additional water will be purchased or leased from the PDA,
which has an existing water authorization.
Units 3 and 4 will be located
entirely within the boundaries of the previously permitted site. Units
3 and 4 will be located on land that has already been disturbed and
developed for industrial use. The GHEC will continue to be fueled by natural
gas and will continue to utilize the natural gas pipeline installed for the
existing facility.
Power produced by the GHEC will continue to be routed through transmission
lines and the Satsop substation that are owned by the Bonneville Power
Administration.
|
SCA Amendment Request (No. 5) October 2009:
November 2009:
Other Key Documents:
|
Project Milestones:
February 18, 2011 -
Grays Harbor Energy -
Governor's Approval Letter,
Final Order,
Final SCA
Notice of Construction/Prevention of Significant Deterioration
Permits (Air Emissions)
November 1, 2010
-
NPDES Permit Modification
More information
October 4, 2010
- Grays Harbor Energy
Deliberative Session Transcript
September 23, 2010 -
Grays Harbor Energy
Deliberative Session Notice
August 30, 2010 -
Grays Harbor Energy
Deliberative Session Notice
July 16, 2010 -
Power Point
Presentations from public panel meetings July 13-15, 2010
July 14, 2010
- Additional Public Comment Meeting
Notice August 10,
2010
July 1, 2010
-
Noise Report prepared by ICF International
July 1, 2010 -
Expedited Processing
Public Notice and
Summary Sheets
related to public meetings on July 13-15, 2010
March 30, 2010
-
Council Order
No. 846 - Granting Expedited Process
March 9, 2010
- Council Order No. 845,
MDNS Public Comment
No. 1, No. 2,
& No. 3
Agency Comment No. 1
&
No. 2
February 10, 2010
-
MDNS
Mitigated Determination of Non-Significance
January 26, 2010 -
Revised Dept. of Fish and Wildlife comment letter Replaces
Comment No. 15 dated 1-7-10
January 19, 2010 -
Public comments
No. 1-7 and
8-16 and Transcripts of Dec. 15, 2009
Public Meeting and
Land Use Hearing
December 18, 2009 -
Public comment time extended to
January 8, 2010
December 9, 2009
-
Noise Report with the results of noise level monitoring during
startup, base load and shutdown.
December 3, 2009
-
Grays Harbor County
Certificate of Land Use Consistency
November 20, 2009
-
Notice
of Initial Public Meeting and Land Use Meeting
November 10, 2009
-
Request for Expedited Processing and
SEPA Checklist
October 30, 2009
- Request to Amend the
SCA to increase capacity by 650 mw by adding new Units 3 & 4, change the name to Grays
Harbor Energy Center, issue a new PSD for Units 3 & 4, and increase
total project water
use.
|
To
be added to the Grays Harbor Energy Center project mailing list,
please:
- contact
Kayce Michelle
Kmichell@utc.wa.gov
at (360) 664-1363, or
-
e-mail your
complete name and postal address to
efsec@utc.wa.gov
and indicate if you want to receive notices of future permitting
activity for this project by e-mail, surface mail, or both methods of
delivery.
Top of page
|