EFSEC Resolutions


The following Resolutions are issued from the Council. Further below the Resolutions are gathered by project/facility.

Project

Resolution #

Regarding

Date

  333 Recognition of Albert E. Wright 08/21/12
Columbia 332 Revisions to the Radiological Environmental Monitoring Program 02/21/12
BP Cogen 02-01 331 Amendment No. 4 - Cherry Point Cogeneration Project Transfer of SCA to BP West Coast Products, LLC 08/24/11
WNP-1 & 4 330 Amendment No. 2 to the Site Certification Agreement 04/13/10
  329 Recognition of Allen J. Fiksdal 02/09/10
Kittitas Valley Wind 328 Amendment No. 1 to the Site Certification Agreement 09/02/09
  327 No Resolution Associated with this number  
Columbia 326 Emergency Preparedness Offsite Agency Support 03/10/09
Chehalis 325 Transfer to PacifiCorp, Termination of TNA Merchant Projects' Guaranty and Approve of Revise Site Restoration Plan 09/22/08
  324 Recognition of Michael E. Mills 03/11/08
BP Cogen 02-01 323 Amendment No. 3 - BP to fund a project that would reduce water use at Intalco and make the unused water available for use by the Cogeneration project 03/11/08
BP Cogen 02-01 322 Amendment No. 2 - Transfer of SCA to New LLC, Removal of Certain Laydown Areas and Modification to Wetland Mitigation Provisions 03/11/08
Wild Horse Wind 321 Amendment No. 4 - Approval of Solar Demonstration Project 04/10/07
BP Cogen 320 Withdrawal of request to amend SCA and laydown use within NPDES permit 02/13/07
Wild Horse Wind 319 Amendment No. 3 - Installation of exempt well 02/13/07
Columbia 318 Removal of on-site Visitor's Center and closeout of Resolution No. 225 11/14/06
BP Cogen 317 Amendment No. 1 to BP Cogen Site Certification Agreement 10/10/06
Sumas 316 Sumas 2 Generation Facility - Termination of Site Certification Agreement 05/09/06
Wild Horse 315 Amendment No. 2 to the Wild Horse Wind Power Project Site Certification Agreement 07/26/05
Wild Horse 314 Modifications to the Wild Horse Wind Power Project Site Certification Agreement 07/26/05
WNP-1 & 4 313 WNP-1/4 Site Restoration - Offsite Environmental Mitigation 07/12/05
Satsop CT 98-1 312 Modifications to the Satsop Combustion Turbine Project Site Certification Agreement 01/11/05
Columbia
311 Emergency Preparedness Offsite Agency Support 01/11/05
Columbia
310 Energy Northwest - Columbia Generating Station: Termination of Non-Radiological Environmental Monitoring Program 04/19/04
Satsop CT 98-1 309 Satsop Combustion Turbine Project - Technical Amendment - Water Use Provisions 04/19/04
Cowlitz 308 Cowlitz Cogeneration Project - Termination of Site Certification Agreement 03/01/04
Columbia
307 Energy Northwest - Disposal of Water Stored in WNP-1 and WNP-4 Service Water Ponds 09/08/03
Columbia 306 CGS Condenser Scale Removal 04/14/03
Wallula 305 Modifications to the Corporate Structure of Site Certificate Holder - Wallula Generation LLC 03/10/03
Chehalis 304 Water use mitigation - Hamilton Water Rights 03/10/03
Columbia 303 CGS Hydrogen Storage and Supply Facility 02/18/03
WNP-1 & 4 302 Site Restoration Plan Approval 12/09/02
Chehalis 301 Water use mitigation 11/12/02
Top of Page  
Columbia 300 Columbia Generating Station Sanitary Waste Treatment Facility 09/10/01
Columbia 299 Columbia Generating Station Cooling System Sediments 08/13/01
Satsop CT 98-1 298 Technical amendments regarding facility design and backup fuel source at Satsop CT Site 04/13/01
Satsop CT 98-1 297 Addition of Duke Energy Grays Harbor LLC as Satsop CT SCA co-holder and co-permittee 02/12/01
Columbia 296 Hanford Wildlife Mitigation Project/Rattlesnake Slope Rehabilitation 11/13/00
Columbia 295 Amending the CGS SCA to allow for Construction and Operation of Dry Cask Storage Facility at the project site 09/11/00
KVA/NRPF 294 Avista Corporation termination of SCA for Creston Generating Station 01/24/00
Columbia Amd. 1 Energy Northwest Change of Corporate Name/CGS Change of Plant Name 09/11/00
Columbia 293 Energy Northwest Corporate Name Change 12/17/99
Columbia 292 Approving upgrading and site preparation plans for WNP-2 08/10/98
291 Commendation for services performed by Acting Chair, C. Robert Wallis 03/09/98
Cowlitz 290 Concluding that Chehalis Power's Report of November 6, 1997 satisfies the SCA requirements for consultation and reporting on the best means of gauging the Centralia Reach of the Chehalis River 12/08/97
KVA/NRPF 289 Approving the KVA water pipeline design and location 12/08/97
Columbia 288 Approval of WNP-2 Landfill Closure Plan, Post-Closure Plan and Plan of Operations 11/10/97
Columbia Amd. 1 Approving FY 2002 EP funding levels for Columbia Generating Facility 06/19/01
Columbia 287 Accepting WNP-2 EP Study Group Recommendations Report 11/10/97
Columbia 286 Closure of WNP-2 NOI and Request for Assurance of Compliance concerning chlorination incidents in July 1996 09/08/97
KVA/NRPF 285 Land Management Plan Conditions 09/08/97
    Top of Page  
WNP 3/5 284 Granting temporary waiver of water quality standards to complete bank protection repairs at the barge unloading facility at the WNP-3/5 Site 08/18/97
Satsop CT - 94-1 283 Deferring installation of the river flow monitoring gauge at the Satsop CT project 05/12/97
  282 Commendation for services performed by former Chair, Frederick S. Adair 01/13/97
Cowlitz 281 Cowlitz SCA to extend for 18 months and removing Mission Energy as a co-sponsor 02/12/96
WNP 1/4 3/5 280 Site Restoration; Close out of Resolutions 243,245 & 246 06/12/95
Creston 279 Termination of Creston Generating Station SCA 05/09/95
Columbia 278 Authorizes the Onsite Disposal of Cooling Tower Sediments 05/08/95
WNP 3/5 277 Timber Harvest Proposal Conditions 04/10/95
WNP 3/5 276 Excavate 40 yards of Sediment with Conditions 03/13/95
WNP 3/5 275 Management of Wildlife Mitigation 11/14/94
KVA 274 Assignment of ALJ Wallis 10/10/94
Columbia 273 Increase Power Output 09/12/94
Cowlitz 272 SCA Amendment 09/12/94
Columbia 271 Closes Resolution No. 268 Water Discharge 08/08/94
Air Permitting Policy 270 Operating Air Permits 06/20/94
  269 Warren Bishop 06/13/94
Columbia
Cowlitz
268
268-1
NPDES Closes Resolution No 258
SCA Amendment
10/11/93
05/16/94
Cowlitz 267 Demolition of Plywood Mill 09/13/93
Columbia/ WNP 1/4 266 Nonradiological Environmental Monitoring Program 05/10/93
WNP 3 265 Fire Water System 03/08/93
  264 Nancy Burnett 02/08/92
WNP 3 263 Closes Council Orders 656, 657 & 659 02/08/93
Trans Mountian Pipeline 262 Low Point Application Submittal with Conditions 03/09/92
WNP 3/5 261 Approval of Forest Practices Application with Conditions 03/09/92
Columbia 260 Approval of Radiological Environmental Monitoring Program 01/13/92
Columbia 259 - 1 Approval of Operation of Sanitary Waste Treatment Facility 11/14/94
Columbia 258 Amended Standby Service Water System 08/10/92
  257 Closes Multiple Resolutions 06/10/91
WNP 3 256 Permission to Burn the Slash and Alder Debris with Conditions 04/08/91
WNP 3/5 255 Approval of Timber Harvest with Conditions 04/08/91
WNP 3/5 254 Approval of Satsop Power Plant Site Wildlife Mitigation Plan 08/13/90
  253 Abolish Council Executive Secretary 08/13/90
WNP 3/5 252 Approval of Timber Harvest with Conditions 07/09/90
Columbia 251 NPDES Condition G35 Fulfilled 06/11/90
WNP 3/5 250 Approval of Forest Road Construction 05/14/90
Columbia 249 Approval of the Use of Sodium Bromide as Bio fouling Agents with Conditions 05/14/90
WNP 3/5 248 Adopts Interim Agreement on Wildlife Mitigation and Timber Management 08/28/89
Creston 247 Approval of Initial Site Restoration Plan 06/26/89
WPPSS 4 & 5 246 Approval of Petition to Postpone Consideration of Site Restoration Plans for WNP 4 & WNP 5 with Conditions 10/10/88
Amended 01/14/91
WNP 3 245 Approval of Initial Site Restoration Plan for WNP 3 upon Approval of Site Restoration Plan of WNP 5 08/22/88
    Top of Page  
Columbia 244 Approval of Initial Site Restoration Plan 08/22/88
WNP 1/4 243 Approval of Initial Site Restoration Plan for WNP 1 upon the Approval of Site Restoration Plan of WNP 4 08/22/88
WNP 3/5 242 - 2 Approval of Continued Use of the Septic Tank System with Conditions 06/13/94
04/11/88
Creston 241 SCA shall continue in full force and effect during Council consideration of WWP Application Amendment 02/08/88
Columbia 240 Adoption of Review Process for Circulation Water Additive Requests 12/14/87
Columbia & WNP 1/4 239 Approval of Revision No 3 - Review of Environmental Monitoring Program for WNP 2 09/14/87
Columbia & WNP 1/4 238 Approval of the Wildlife Mitigation Plan with Conditions 05/01/87
WNP 3 237 Abide by an Oil Spill Prevention and Countermeasure Plan and Hazardous Waste Management Procedure with Conditions 12/08/86
WNP 3 236 Storm Water Runoff Chemical Treatment Facility for NPDES 12/08/86
WNP 1/4 235 Removal of Wood Waste on WNP 1 & 4 by Controlled Burning of Wood Waste with Conditions 08/25/86
WNP 1/4 234 Statement of Compliance with SCA Conditions on WNP 1/4 08/25/86
WNP 3/5 233 Close of multiple Resolutions 06/09/86
WNP 3/5 232 Conditions Satisfied - Erosion Control during Construction 06/09/86
BPA 231
Amended
Taft Bell Transmission Line Construction and Council Closed its involvement. 04/14/86
Columbia 230 OL Amendment Checklist Accepted 03/24/86
  229 Policy - Develop Process to determine if additional Public Health, Safety and Environmental Protections are needed 01/27/86
Columbia 228 Approval of Deployment of Gamma Detectors 01/13/86
WNP 3/5 227 NPDES Closes Multiple Resolutions 08/26/85
WNP 3/5 226 Water Quality Sampling Program Closes Multiple Resolutions 08/26/85
Columbia & WNP 1/4 225 Visitors Center with Conditions 12/10/84
Columbia 224 Compliance Determinations & Implementation of Corrective Action with Conditions 11/26/84
Columbia & WNP 1/4 223 Approval of Termination of Sampling at the Three Burned Sampling Sites 10/29/84
WNP 3/5 222 Grants a Temporary Waiver of the Water Quality Standards with Conditions 06/11/84
WNP 3/5 221 Hydrazine and Cortec may be Discharged as part of the Metal Cleaning Waste Water Stream with Conditions 06/11/84
BPA 220 Adopts the Work Program/Intent to review the Lower Monumental/ Ashe Transmission Corridor 03/12/84
Creston 219 Approval of Recommendation and the Lincoln County Agriculture Coalition be granted membership 07/25/83
WNP 3/5 218 Fulfilled Condition VI.A.1 of SCA 07/11/83
WNP 3/5 217 Closes Multiple Resolutions 05/23/83
WNP 3/5 216 Closes Multiple Resolutions Authorizes a Reduction in the Erosion Control Program with Conditions 03/28/83
WNP 3/5 215 Approval of Construction Plans/Temporary Waiver of Water Quality Standards with Conditions 11/22/82
Columbia 214 Approval of Ecological Monitoring Program 11/08/82
WNP 3/5 213 Approval of Increase in the Inventory of Mineral Oil and the Storage of Transformers 11/08/82
WNP 3/5 212 Authorize the Requested Extension of the In-River Work Time Window 09/13/82
WNP 3/5 211 Terms and Conditions of Resolution #160 Fully Met and Satisfied 08/23/82
WNP 3/5 210 Terms and Conditions of Resolution No 178 Fully Met and Satisfied 08/09/82
Columbia 209 Requirements of Order No. 544 Fully Satisfied 08/09/82
WNP 3/5 208 Approval of Concept of the Approach Outlined in the Decommissioning Process with Conditions 07/26/82
WNP 3/5 207 Turbidity Waiver for Supplemental Dredging and desilting Operations 07/26/82
WNP 3/5 206 Temporary Waiver of the Water Quality Standards with Conditions 07/12/82
WNP 3/5 205 Multipurpose Facility for WNP 3/5, Visitor Center, Emergency Operations, and Training. Supersedes Resolution No. 199 06/28/82
WNP 3/5 204 Approval of Construction Plans for Installation of the Makeup Piping and Electrical Cables/Granting Temporary Waiver Water Quality Standards 05/24/82
WNP 3/5 203 Approval of Construction Plans for Installation of Discharge Piping and Blow down Diffuser Granting Temporary Waiver of Water Quality Standards 02/22/82
WNP 3/5 202 Approval of Procedure Manual for Bioassay Program 02/22/82
Columbia 201 Deems Study of Effects of Non-toxic Chlorine Enhancement Agents and Corrosion Inhibitors on Biocidal Efficiency to be properly within the Scope of the Chlorination Studies Required with Conditions 01/25/82
    Top of Page  
WNP 3/5 200 Approval of Modifications in the Environmental Monitoring Program 01/11/82
WNP 3/5 199 Affirms the concept of a multipurpose Facility for Visitor Center, Emergency Operations Facility, Control Room and Training Office with Conditions 10/26/81
  198 Establishes Committees: Executive, Application Review, Certificate Compliance 09/28/81
WNP 3/5 197 Approval of Oil Spill Prevention and Counter Measures/ Rescinding of Resolutions # 149 & 158 08/24/81
  196 No Resolution Associated with this number
WNP 3/5 195 Approval of Modification to Ecological Monitoring 06/22/81
Columbia & WNP 1/4 194 Approval of Adopted Terrestrial Monitoring Component of the Environmental Monitoring Program 05/26/81
Columbia & WNP 1/4 193 Approval of the Adopted Terrestrial Monitoring Component of the Environmental Monitoring Program 05/26/81
Columbia 192 Attachment 1 WNP-2 SCA Revision 2 05/26/81
Northern Tier Pipeline 191 Establishing a Steering Committee for the Purpose of Organizing and Managing the Review of the Contested Case Record 03/23/81
WNP 3/5 190 Granting a Turbidity Waiver for Supplemental Dredging and Disilting Operations Associated with the Barge Unloading Facility with Conditions 03/23/81
WNP 3/5 189 Grant a Temporary Waiver of the Water Quality Standards with Conditions 03/09/81
WNP 3/5 188 Council Finds that the New Programs will Adequately Protect and further Reduce the Impact on the Environment. 01/26/81
WNP 3/5 187 Rescinding of Resolution No 147 01/26/81
Columbia 186 Pre-Operational Monitoring Program as Proposed shall be deemed to Satisfy the Monitoring Requirements of the NPDES 11/24/80
WNP 1-5 185 Low Volume Wastes 11/24/80
WNP 3/5 184 Contract for Water 10/27/80
WNP 3/5 183 Approval of Construction Plans for the Transporter Haul Road 09/22/80
WNP 3/5 182 Extend the Turbidity Waiver and Time period for Construction of Bank Protection on the North Shore of the Chehalis River 09/08/80
Trans Mountain Oil Pipeline 181 Extension of the 12-Month processing period 08/11/80
WNP 3/5 180 Grants a Turbidity Waiver during Construction Work With Conditions  
WNP 3/5 179 Grants Temporary Waiver of the Water Quality Standards with Conditions 06/09/80
WNP 3/5 178 Resolve of Resolution No. 147 05/27/80
WNP 3/5 177 Grants Temporary Waiver of the Water Quality Standards with Conditions 05/12/80
  176 Washington State Implementation Plan to Attain and Maintain National Ambient Air Quality Standards 05/12/80
Columbia & WNP 1/4 175 Approval of the Adoption of Terrestrial Monitoring Component of the Environmental Monitoring Program 04/28/80
Columbia & WNP 1/4 174 Approval of the Sanitary Waste Disposal System 04/28/80
WNP 3/5 173 Grants Temporary Waiver of the Water Quality Standards with Conditions 04/28/80
WNP 3/5 172 Approval of Extension of the Turbidity Waiver for the F-3 Pump Pond Effluent with Conditions 04/28/80
WNP 3/5 171 Rescinding Resolution No. 128 04/28/80
WNP 3/5 170 Approval of Construction o the Make-up Well System as proposed with Conditions 04/28/80
WNP 3/5 169 Grants a Temporary Waiver of the Water Quality Standards with Conditions 04/28/80
  168 To Equitably Share the Costs of Developing an Emergency Response Plan 04/14/80
WNP 3/5 167 Rescinding Resolution No. 124 04/14/80
Columbia & WNP 1/4 166 Grants Termination of the Preoperational Aquatic Ecology Data Collection for WNP 2, 1/4 03/24/80
WNP 3/5 165 Approval of Proposed Objectives and General Design of the WNP 3/5 Facilities and Concept only 03/24/80
WNP 3/5 164 Rescinding Resolution No. 154 03/10/80
Northern Tier Pipeline 163 Council Adoption of Procedures to Regulate the processing of Application No. 76-2 02/25/80
WNP 3/5 162 Approval of Single Surface Water Sampling Site to Determine Background Level 02/01/80
WNP 3/5 161 US Geological Survey Flow Gauge Established for Chehalis River 12/10/79
WNP 3/5 160 Rescinding Resolution No. 147 11/13/79
Northern Tier Pipeline 159 Adoption of Structure and Regulation for the Conduct 11/13/79
WNP 3/5 158 Approval of Supplement to Oil Spill Prevention and Countermeasure Plan with Conditions 10/29/79
Columbia & WNP 1/4 & 3/5 157 Not requiring Scientific Collector permits for the Conduct of Studies 09/24/79
WNP 3/5 156 Application for Modification of the Site Certification Agreement is Dismissed 08/27/79
Northern Tier Pipeline 155 Intent to Commence the Contested Case Hearing 09/10/79
WNP 3/5 154 Grants Approval for Construction of the Pioneer Rd with Conditions 08/13/79
WNP 3/5 153 Approval of Erosion Control Plan with Conditions 07/9/79
Columbia 152 Granting Relief from Monitoring of the Emissions of the Emergency Diesel Engines and Auxiliary Boiler 06/11/79
WNP 3/5 151 Approval to Remove P-1, P-3 and W-1 Pump Stations 06/11/79
    Top of Page  
WNP 3/5 150 Granting a Turbidity Waiver during Construction of the Laydown Area with Conditions 06/11/79
WNP 3/5 149 Rescinded Council Resolutions 142 & 144 with Conditions 06/11/79
WNP 3/5 148 Changing Date of Resolution No. 147 to October 31, 1978 Erosion Control Program 10/23/78
WNP 3/5 147 Rescinding Resolution No. 126 & Order No. 543 with Conditions 10/09/78
WNP 1/4 146 Amending Resolution No. 134 09/11/78
WPPSS 145 Approval of design of the Priest Rapids Fish Hatchery Improvements with Conditions 05/08/78
WNP 3./5 144 Approval of Supplement to the Oil Spill Prevention and Counter Measures Plan with Conditions 08/14/78
WNP 1/4 143 Motion by Parties Seeking Hearing Dismissed 06/12/78
WNP 3/5 142 Rescinding Resolution No. 120 05/08/78
  141 Adoption of Temporary, Emergency Rule 03/27/78
  140 Actively Seeking Agreements with US Nuclear Regulatory Commission 03/27/78
Skagit 139 Approval of Required Plans with Conditions 03/27/78
Skagit 138 General Erosion Control Requirements Constitutes Compliance with Requirements 03/27/78
Skagit 137 NPDES Approval of proposal Sediment Retention Facilities 03/27/78
Trans Mountain Oil Pipeline 136 Receipt of the Applicant's Notice of Withdrawal 03/27/78
WPPSS 135 Approval Acceptability of Criteria Regarding Chinook fry per year 03/13/78
WPPSS 134 Satisfied Requirements with Conditions 02/27/78
Skagit 133 Approval of Oil Spill Prevention and Counter Measures Plan 02/27/78
Columbia 132 Approval of Revised Environmental Monitoring Program 01/23/78
  131 Adoption of EPA Rule as WAC 463-18-040 01/09/78
Northern Tier Pipeline 130 Extension of Review period 12/27/77
Skagit 129 Reduce the Scope of the Ongoing Baseline Monitoring Activity with Regard to Terrestrial and Aquatic Biology 12/12/77
WNP 3/5 128 Rescinding Resolution No. 155 10/28/77
Skagit 127 Evidence of Insurance 09/26/77
WNP 3/5 126 WPPSS Shall Immediately Execute and Continue the Following Remedial Actions Supplemental to the Erosion Control Program 09/26/77
  125 Adoption as a Temporary, Emergency Rule 08/08/77
WPPSS 124 Satisfied Requirements of SCA with Provisions 07/25/77
Skagit 123 Accepts the Report on Pipelines Laid in the Bed of the Skagit River Near the Proposed Diffuser Site, Satisfaction of the First Portion of the NPDES 06/27/77
Columbia 122 Technical Committee Recommendations 06/27/77
Columbia & WNP 1/4 121 Revokes Approval to Temporarily Suspend the Benthic Monitoring Program and Concurs with the Implementation of the Benthic Monitoring Program with Conditions 05/09/77
WNP 3/5 120 Approval of Oil Spill Prevention and Counter Measure Plan 05/09/77
WNP 3/5 119 Agrees to Disposal of Slash and Stumps from Land Clearing by Controlled Burning with Conditions 04/25/77
WNP 1/4 118 Approval Phases I & II with Conditions 04/11/77
Skagit 117 Requirements of General Condition G14 of NPDES Permit are Satisfied 03/14/77
WNP 3/5 116 Approval of the Required Qualification for the Consultant who will Carry Out All or any portion of the Environmental Monitoring Program 02/15/77
WNP 3/5 115 Approval of the Erosion Control Plan for the Access Road and Railroad. With Conditions 02/15/77
  114 Adoption of NPDES Rules WAC 463-16 Repealed 01/03/77
  113 Adoption of Rules - WAC 463-42 Repealed WAC 463-12 01/24/77
  112 Repeal of WAC 463-08-024 11/22/76
  111 Adoption of Rules - WAC 463-46 Repealed WAC 463-08 11/22/76
  110 Adoption of Rules - WAC 463-50 11/08/76
  109 Adoption of Rules - WAC 463-26 Repealed WAC 463-08 11/08/76
  108 Adoption of Rules - WAC 463-54 10/25/76
  107 Adoption of Rules - WAC 463-34 10/25/76
  106 Adoption of Rules - WAC 463-22 10/25/76
  105 Adoption of Rules - WAC 463-18 10/25/76
  104 Adoption of Rules - WAC 463-10 Repealed WAC 463-08 10/25/76
  103 Adoption of Rules - WAC 463 Repealed WAC 463-20 10/25/76
  102 Adoption of Rule - WAC 197-10 with Exceptions 07/28/76
  101 Adoption of Rule - WAC 197-10 with Exceptions 05/10/76
    Top of Page  
WNP 1 7-74 Notice of Initial Public Hearing to be held on July 8, 1974 06/10/74
WNP 1 6-74 According Official Application Effective Date 06/10/74
Skagit 5-74 Notice of Initial Public Hearing 04/08/74
Skagit 4-74 According Official Application 04/08/74
WNP 1 3-74 Extension of Time Allowed for Recommendation to the Governor 01/28/74
WNP 3 2-74 Notice of Initial Public Hearing 01/14/74
WNP 3 1-74 Receipt of the Initial Application 01/14/74
  5-73 Adoption of Emergency Rules 12/10/73
  4-73 Adoption of Emergency Rules 09/10/73
  3-73 Charles F Murphy 03/12/73
WNP 1 2-73 Notice of Initial Public Hearing 02/26/73
WNP 1 1-73 Receipt of Application 02/26/73
  1-72 Adoption of Emergency Rules 10/30/72
Columbia 2-71 Notice for Public Comment on EIS 11/22/71
Columbia 1-71 Notice of Initial Public Hearing 02/22/71

Top of Page

BP Cherry Point Cogeneration Project - Application No. 2002-01

338 Amendment No. 4 - Cherry Point Cogeneration Project Transfer of SCA to BP West Coast Products, LLC 08/24/11
323 Amendment No. 3 - BP to fund a project that would reduce water use at In Talco and make the unused water available for use by the Cogeneration project 03/11/08
322 Amendment No. 2 - Transfer of SCA to New LLC, Removal of Certain Laydown Areas and Modification to Wetland Mitigation Provisions 03/11/08
320 Withdrawal of request to amend SCA and laydown use within NPDES permit 02/13/07
317 Amendment No. 1 to BP Cogen Site Certification Agreement 10/10/06

Bonneville Power Administration Projects

231
Amended
Taft Bell Transmission Line Construction and Council Closed its involvement. 04/14/86
220 Adopts the Work Program/Intent to review the Lower Monumental/Ashe Transmission Corridor 03/12/84

Chehalis Generation Facility

325 Transfer to PacifiCorp, Termination of TNA Merchant Projects' Guaranty and Approve of Revise Site Restoration Plan 09/22/08
304 Water use mitigation - Hamilton Water Rights 03/10/03
301 Water use mitigation 11/12/02

Columbia Generating Station (formerly WNP-2)

Top of Page

332 Revisions to the Radiological Environmental Monitoring Program 02/21/12
326 Emergency Preparedness Offsite Agency Support 03/10/09
318 Removal of on-site Visitor's Center and closeout of Resolution No. 225 11/14/06
311 Emergency Preparedness Offsite Agency Support 01/11/05
310 Energy Northwest - Columbia Generating Station: Termination of Non-Radiological Environmental Monitoring Program 04/19/04
307
(3.3 MB)
Energy Northwest - Disposal of Water Stored in WNP-1 and WNP-4 Service Water Ponds 09/08/03
295 Amending the CGS SCA to allow for construction and operation of Dry Cask Storage Facility at the project site 09/11/00
293 Energy Northwest Corporate Name Change 12/17/99
306 CGS Condenser Scale Removal 04/14/03
303 CGS Hydrogen Storage and Supply Facility 02/18/03
300 Columbia Generating Station Sanitary Waste Treatment Facility 09/10/01
299 Columbia Generating Station Cooling System Sediments 08/13/01
296 Hanford Wildlife Mitigation Project/Rattlesnake Slope Rehabilitation 11/13/00
293
Amd. 1
Energy Northwest Change of Corporate Name/CGS Change of Plant Name 09/11/00
292 Approving upgrading and site preparation plans for WNP-2 08/10/98
288 Approval of WNP-2 Landfill Closure Plan, Post-Closure Plan and Plan of Operations 11/10/97
287
Amd. 1
Approving FY 2002 EP funding levels for Columbia Generating Facility 06/19/01
287 Accepting WNP-2 EP Study Group Recommendations Report 11/10/97
286 Closure of WNP-2 NOI and Request for Assurance of Compliance concerning chlorination incidents in July 1996 09/08/97
278 Authorizes the Onsite Disposal of Cooling Tower Sediments 05/08/95
273 Increase Power Output 09/12/94
271 Closes Resolution No. 268 Water Discharge 08/08/94
260 Approval of Radiological Environmental Monitoring Program 01/13/92
259 - 1 Approval of Operation of Sanitary Waste Treatment Facility 11/14/94
258 Amended Standby Service Water System 08/10/92
251 NPDES Condition G35 Fulfilled 06/11/90
249 Approval of the Use of Sodium Bromide as Bio fouling Agents with Conditions 05/14/90
244 Approval of Initial Site Restoration Plan 08/22/88
240 Adoption of Review Process for Circulating Water Additive Requests 12/14/87
230 OL Amendment Checklist Accepted 03/24/86
228 Approval of Deployment of Gamma Detectors 01/13/86
224 Compliance Determinations & Implementation of Corrective Action with Conditions 11/26/84
214 Approval of Ecological Monitoring Program 11/08/82
209 Requirements of Order No. 544 Fully Satisfied 08/09/82
201 Deems Study of Effects of Non-toxic Chlorine Enhancement Agents and Corrosion Inhibitors on Biocidal Efficiency to Be properly within the Scope of the Chlorination Studies Required with Conditions 01/25/82
192 Attachment 1 WNP-2 SCA Revision 2 05/26/81
186 Pre-Operational Monitoring Program as Proposed shall be deemed to Satisfy the Monitoring Requirements of the NPDES 11/24/80
152 Granting Relief from Monitoring of the Emissions of the Emergency Diesel Engines and Auxiliary Boiler 06/11/79
132 Approval of Revised Environmental Monitoring Program 01/23/78
122 Technical Committee Recommendations 06/27/77
2-71 Notice for Public Comment on EIS 11/22/71
1-71 Notice of Initial Public Hearing 02/22/71

Columbia Generating Station and Washington Nuclear Project 1 & 4

Top of Page

268
268-1
NPDES Closes Resolution No 258
SCA Amendment
10/11/93
05/16/94
266 Non-radiological Environmental Monitoring Program 05/10/93
239 Approval of Revision No 3 - Review of Environmental Monitoring Program for WNP 2 09/14/87
238 Approval of the Wildlife Mitigation Plan with Conditions 05/01/87
225 Visitors Center with Conditions 12/10/84
223 Approval of Termination of Sampling at the Three Burned Sampling Sites 10/29/84
194 Approval of Adopted Terrestrial Monitoring Component of the Environmental Monitoring Program 05/26/81
193 Approval of the Adopted Terrestrial Monitoring Component of the Environmental Monitoring Program 05/26/81
175 Approval of the Adoption of Terrestrial Monitoring Component of the Environmental Monitoring Program 04/28/80
174 Approval of the Sanitary Waste Disposal System 04/28/80
166 Grants Termination of the Preoperational Aquatic Ecology Data Collection for WNP 2, 1/4 03/24/80
157 Not requiring Scientific Collector permits for the Conduct of Studies 09/24/79

Cowlitz Cogeneration Project

Top of Page

308 Cowlitz Cogeneration Project - Termination of Site Certification Agreement 03/01/04
290 Concluding that Chehalis Power's Report of November 6, 1997 satisfies the SCA requirements for consultation and reporting on the best means of gauging the Centralia Reach of the Chehalis River 12/08/97
281 Cowlitz SCA to extend for 18 months and removing Mission Energy as a co-sponsor 02/12/96
272 SCA Amendment 09/12/94
268
268-1
NPDES Closes Resolution No 258
SCA Amendment
10/11/93
05/16/94
267 Demolition of Plywood Mill 09/13/93

Creston Generating Station

294 Avista Corporation termination of SCA for Creston Generating Station 01/24/00
279 Termination of Creston Generating Station SCA 05/09/95
247 Approval of Initial Site Restoration Plan 06/26/89
241 SCA shall continue in full force and effect during Council consideration of WWP Application Amendment 02/08/88
219 Approval of Recommendation and the Lincoln County Agriculture Coalition be granted membership 07/25/83

Kittitas Valley Wind Power Project

Top of Page

328 Amendment No. 1 to the Site Certification Agreement 09/02/09

KVA Power - Northwest Regional Power Facility

274 Assignment of ALJ Wallis 10/10/94
289 Approving the KVA water pipeline design and location 12/08/97
285 Land Management Plan Conditions 09/08/97

Northern Tier Pipeline

191 Establishing a Steering Committee for the Purpose of Organizing and Managing the Review of the Contested Case Record 03/23/81
163 Council Adoption of Procedures to Regulate the processing of Application No. 76-2 02/25/80
159 Adoption of Structure and Regulation for the Conduct 11/13/79
155 Intent to Commence the Contested Case Hearing 09/10/79

Satsop Combustion Turbine 1 & 2

312 Modifications to the Satsop Combustion Turbine Project Site Certification Agreement 01/11/05
309 Satsop Combustion Turbine Project - Technical Amendment - Water Use Provisions 04/19/04
298 Technical amendments regarding facility design and backup fuel source at Satsop CT Site 04/13/01
297 Addition of Duke Energy Grays Harbor LLC as Satsop CT SCA co-holder and co-permittee 02/12/01
283 Deferring installation of the river flow monitoring gauge at the Satsop CT project 05/12/97

Skagit Nuclear Power Project Units 1 & 2

Top of Page

139 Approval of Required Plans with Conditions 03/27/78
138 General Erosion Control Requirements Constitutes Compliance with Requirements 03/27/78
137 NPDES Approval of Proposal Sediment Retention Facilities 03/27/78
133 Approval of Oil Spill Prevention and Countermeasures Plan 02/27/78
129 Reduce the Scope of the On-going Baseline Monitoring Activity with Regard to Terrestrial and Aquatic Biology 12/12/77
127 Evidence of Insurance 09/26/77
123 Accepts the Report on Pipelines Laid in the Bed of the Skagit River near the Proposed Diffuser Site, Satisfaction of the First Portion of the NPDES 06/27/77
117 Requirements of General Condition G14 of NPDES Permit are Satisfied 03/14/77
5-74 Notice of Initial Public Hearing 04/08/74
4-74 According Official Application 04/08/74

Sumas 2 Generation Facility

316 Sumas 2 Generation Facility - Termination of Site Certification Agreement 05/09/06

Trans Mountain Oil Pipeline

262 Low Point Application Submittal with Conditions 03/09/92
181 Extension of the 12-Month processing period 08/11/80
136 Receipt of the Applicant's Notice of Withdrawal 03/27/78

Wallula Generation

305 Modifications to the Corporate Structure of Site Certificate Holder - Wallula Generation LLC 03/10/03

Wild Horse Wind Power Project Application No. 2004-01

321 Amendment No. 4 - Approval of Solar Demonstration Project 04/10/07
319 Amendment No. 3 - Installation of exempt well 02/13/07
315 Amendment No. 2 to the Wild Horse Wind Power Project Site Certification Agreement 07/26/05
314 Modifications to the Wild Horse Wind Power Project Site Certification Agreement 07/26/05

Washington Nuclear Projects 1 & 4 (WNP 1/4)

330 Amendment No. 2 to the Site Certification Agreement 04/13/10
313 WNP-1/4 Site Restoration - Offsite Environmental Mitigation 07/12/05
302 Site Restoration Plan Approval 12/09/02
280 Site Restoration; Close out of Resolutions 243,245 & 246 06/12/95
243 Approval of Initial Site Restoration Plan for WNP 1 upon the Approval of Site Restoration Plan of WNP 4 08/22/88
235 Removal of Wood Waste on WNP 1 & 4 by Controlled Burning of Wood Waste with Conditions 08/25/86
234 Statement of Compliance with SCA Conditions on WNP 1/4 08/25/86
146 Amending Resolution No. 134 09/11/78
118 Approval Phase I & II with Conditions 04/11/77
7-74 Notice of Initial Public Hearing to be held on July 8,1974 06/10/74
6-74 According Official Application Effective Date 06/10/74
3-74 Extension of Time Allowed for Recommendation to the Governor 01/28/74
2-73 Notice of Initial Public Hearing 02/26/73
1-73 Receipt of Application 02/26/73

Washington Nuclear Projects 3 & 5 (WNP 3/5) - renamed the Satsop Site

Top of Page

284 Granting temporary waiver of water quality standards to complete bank protection repairs at the barge unloading facility at the WNP-3/5 Site 8/18/97
277 Timber Harvest Proposal Conditions 4/10/95
276 Excavate 40 yards of Sediment with Conditions 3/13/95
275 Management of Wildlife Mitigation 11/14/94
265 Fire Water System 3/8/93
263 Closes Council Orders 656, 657 & 659 2/8/93
261 Approval of Forest Practices Application with Conditions 3/9/92
256 Permission to Burn the Slash and Alder Debris with Conditions 4/8/91
255 Approval of Timber Harvest with Conditions 4/8/91
254 Approval of Satsop Power Plant Site Wildlife Mitigation Plan 8/13/90
252 Approval of Timber Harvest with Conditions 7/9/90
250 Approval of Forest Road Construction 5/14/90
248 Adopts Interim Agreement on Wildlife Mitigation and Timber Management 8/28/89
245 Approval of Initial Site Restoration Plan for WNP 3 upon Approval of Site Restoration Plan of WNP 5 8/22/88
242 - 2 Approval of Continued Use of the Septic Tank System with Conditions 6/13/94
4/11/88
4/11/88
237 Abide by an Oil Spill Prevention and Countermeasure Plan and Hazardous Waste Management Procedure with Conditions 12/8/86
236 Storm Water Runoff Chemical Treatment Facility for NPDES 12/8/86
233 Close of multiple Resolutions 6/9/86
232 Conditions Satisfied - Erosion Control during Construction 6/9/86
227 NPDES Closes Multiple Resolutions 8/26/85
226 Water Quality Sampling Program Closes Multiple Resolutions 8/26/85
222 Grants a Temporary Waiver of the Water Quality Standards with Conditions 6/11/84
221 Hydrazine and Cortec may be Discharged as part of the Metal Cleaning Waste Water Stream with Conditions 6/11/84
218 Fulfilled Condition VI.A.1 of SCA 7/11/83
217 Closes Multiple Resolutions 5/23/83
216 Closes Multiple Resolutions Authorizes a Reduction in the Erosion Control Program with Conditions 3/28/83
215 Approval of Construction Plans/Temporary Waiver of Water Quality Standards with Conditions 11/22/82
213 Approval of Increase in the Inventory of Mineral Oil and the Storage of Transformers 11/8/82
212 Authorize the Requested Extension of the In-River Work Time Window 9/13/82
211 Terms and Conditions of Resolution #160 Fully Met and Satisfied 8/23/82
210 Terms and Conditions of Resolution No 178 Fully Met and Satisfied 8/9/82
208 Approval of Concept of the Approach Outlined in the Decommissioning Process with Conditions 7/26/82
207 Turbidity Waiver for Supplemental Dredging and desilting Operations 7/26/82
206 Temporary Waiver of the Water Quality Standards with Conditions 7/12/82
205 Multipurpose Facility for WNP 3/5, Visitor Center, Emergency Operations, and Training Supersedes Resolution No. 199 6/28/82
204 Approval of Construction Plans for Installation of the Makeup Piping and Electrical Cables/Granting Temporary Waiver Water Quality Standards 5/24/82
203 Approval of Construction Plans for Installation of Discharge Piping and Blow down Diffuser Granting Temporary Waiver of Water Quality Standards 2/22/82
202 Approval of Procedure Manual for Bioassay Program 2/22/82
200 Approval of Modifications in the Environmental Monitoring Program 1/11/82
199 Affirms the concept of a multipurpose Facility for Visitor Center, Emergency Operations Facility, Control Room and Training Office with Conditions 10/26/81
197 Approval of Oil Spill Prevention and Countermeasures/Rescinding Resolutions # 149 & 158 8/24/81
195 Approval of Modification to Ecological Monitoring 6/22/81
190 Granting a Turbidity Waiver for Supplemental Dredging and Disilting Operations Associated with the Barge Unloading Facility with Conditions 3/23/81
189 Grant a Temporary Waiver of the Water Quality Standards with Conditions 3/9/81
188 Council Finds that the New Programs will Adequately Protect and further Reduce the Impact on the Environment. 1/26/81
187 Rescinding Resolution No 147 1/26/81
184 Contract for Water 10/27/80
183 Approval of Construction Plans for the Transporter Haul Road 9/22/80
182 Extend the Turbidity Waiver and Time period for Construction of Bank Protection on the North Shore of The Chehalis River 9/8/80
180 Grants a Turbidity Waiver during Construction Work With Conditions  
179 Grants Temporary Waiver of the Water Quality Standards with Conditions 6/9/80
178 Resolve of Resolution No. 147 5/27/80
177 Grants Temporary Waiver of the Water Quality Standards with Conditions 5/12/80
173 Grants Temporary Waiver of the Water Quality Standards with Conditions 4/28/80
172 Approval of Extension of the Turbidity Waiver for the F-3 Pump Pond Effluent with Conditions 4/28/80
171 Rescinding Resolution No. 128 4/28/80
170 Approval of Construction o the Make-up Well System as proposed with Conditions 4/28/80
169 Grants a Temporary Waiver of the Water Quality Standards with Conditions 4/28/80
167 Rescinding Resolution No. 124 4/14/80
165 Approval of Proposed Objectives and General Design of the WNP 3/5 Facilities and Concept only 3/24/80
164 Rescinding Resolution No. 154 3/10/80
162 Approval of Single Surface Water Sampling Site to Determine Background Level 2/1/80
161 US Geological Survey Flow Gauge Established for Chehalis River 12/10/79
160 Rescinding Resolution No. 147 11/13/79
158 Approval of Supplement to Oil Spill Prevention and Countermeasure Plan with Conditions 10/29/79
156 Application for Modification of the Site Certification Agreement is Dismissed 8/27/79
154 Grants Approval for Construction of the Pioneer Rd with Conditions 8/13/79
153 Approval of Erosion Control Plan with Conditions 7/9/79
151 Approval to Remove P-1, P-3 and W-1 Pump Stations 6/11/79
150 Granting a Turbidity Waiver during Construction of the Laydown Area with Conditions 6/11/79
149 Rescinded Council Resolutions 142 & 144 with Conditions 6/11/79
148 Changing Date of Resolution No. 147 to October 31, 1978 Erosion Control Program 10/23/78
147 Rescinding Resolution No. 126 & Order No. 543 with Conditions 10/9/78
142 Rescinding Resolution No. 120 5/8/78
128 Rescinding Resolution No. 155 10/28/77
126 WPPSS Shall Immediately Execute and Continue the Following Remedial Actions Supplemental to the Erosion Control Program 9/26/77
120 Approval of Oil Spill Prevention and Counter Measure Plan 5/9/77
119 Agrees to Disposal of Slash and Stumps from Land Clearing by Controlled Burning with Conditions 4/24/77
116 Approval of the Required Qualification for the Consultant who will Carry out all or any portion of the Environmental Monitoring Program 2/15/77
115 Approval of the Erosion Control Plan for the Access Road and Railroad with conditions 2/15/77
246 Approval of Petition to Postpone Consideration of Site Restoration Plans for WNP 4 & WNP 5 with Conditions 10/10/88
Amended 1/14/91
145 Approval of Design of the Priest Rapids Fish Hatchery Improvements with Conditions 5/8/78
135 Approval Acceptability of Criteria Regarding Chinook Fry Per Year 3/13/78
134 Satisfied Requirements with Conditions 2/27/78
124 Satisfied Requirements of SCA with Provisions 7/25/77
 

Home Page | About EFSEC | Certification | Energy Facilities 
Laws & Rules
|
Rulemaking | Meetings | Staff Contacts  
Site Map | Links | Privacy Notice   

Access Washington Logo  

www.efsec.wa.gov
Question or Comment? Contact EFSEC at efsec@utc.wa.gov