Desert Claim Wind Power Project - Revised Page last updated January 14, 2013

The Desert Claim Wind Power Project has been revised to be a 190 megawatt (MW) wind power project located on approximately 5,200 contiguous acres in Kittitas County, eight miles northwest of Ellensburg, Washington (location map).  The Project will consist of a maximum of 95 turbines and associated electrical collection system that would connect the Project to the regional high-voltage transmission grid.  The Project area includes purchased land and land leased from private and public land owners.   

The revised Desert Claim Wind Power Project will continue to use REpower MM92 model turbines.  This turbine model has a tower height of 258 feet, a rotor diameter of 304 feet with a total height of 410 feet.  Each turbine has a nameplate generating capacity of 2.0 MW.

The Revised Application for Site Certification was submitted on February 6, 2009.  The original Application for Site Certification was submitted on November 6, 2006. 

EFSEC issued Order No. 843 Recommending Approval of Site Certification Agreement on November 16, 2009. The Governor approved the Desert Claim Wind Power Project on February 1, 2010.  Governor Gregoire's approval letter to the EFSEC Chair and Site Certification Agreement.

There are no immediate plans to begin construction of the project.

Applicant: Desert Claim Wind Power LLC
PO Box 4
Woodinville, WA 98072
425-941-3774
Facility: 190 MW Wind Power Project
Location: Kittitas County - revised project map
Status:

February 2, 2010 - Governor Gregoire's approval letter to the EFSEC Chair

December 4, 2009 - Approval recommendation delivered to Governor

November 16, 2009 - Order No. 843, Order Recommending Approval of Site Certification Agreement

November 6, 2009 - Final Supplemental Environmental Impact Statement

July 13, 2009 - EFSEC holds adjudicative hearings.

April 29, 2009 - Approval of intervenors and beginning of Adjudicative proceeding

April 2, 2009 - Draft Supplemental Environmental Impact Statement is issued addressing possible impacts to the areas that may not have been covered or addressed by the 2004 Environmental Impact Statement prepared by Kittitas County.

March 27, 20009 - The adjudicative process begins with the issuance of the Notice of Adjudication, Notice for Intervention and Notice of Prehearing Conference.

February 6, 2009 - After almost a 2 year pause, enXco submitted a Revised Application to EFSEC.  On February 10, 2009 EFSEC approved an extension of its review period until Dec. 31, 2009.

General Information:
2010 Site Certification Agreement

Site Certification Agreement

Attachment 1 - Project Legal Description
Attachment 2
 - Council Order No. 843, Order Recommending Approval of Site Certification on Condition entered November 16, 2009
Attachment 3 - Stipulation between Counsel for the Environment and Desert Claim Wind Power LLC
Attachment 4
- Agreement between Washington Department of Fish and Wildlife (WDFW) and Desert Claim Wind Power LLC


Order Recommending Approval of Site Certification Agreement and Draft Site Certification Agreement

On November 16, 2009, EFSEC issued Order No. 843 recommending the Governor approve the Desert Claim Wind Power Project - Draft Site Certification Agreement. 


Adjudicative Proceeding


Revised Application for Site Certification (2009):

On February 6, 2009, enXco submitted a Revised Application for the Desert Claim Wind Power Project (includes updated figures and studies).

Introduction Cover, Submittal letter, Table of Contents
Project Project Description
Figures Project Figures
Tab 2 Visual Simulations
Tab 3 Regulatory Matrix
Tab 4 Wetland Information
Tab 5 Update on Vegetation & Wildlife Impacts
Tab 6 Sound Mapping
Tab 7 Hazard Zones
Tab 8 Shadow Mapping
Tab 9 Lighting
Tab 10 Revised Supplemental Regulatory Information
FEIS 2004 Final Environmental Impact Statement prepared by Kittitas County

Application for Site Certification (2006):

Introduction Cover, Submittal letter, Table of Contents (1,593 KB)
Project Project Description (2,891 KB)
Figures Project Figures (7,854 KB)
Tab 2 Visual Simulations (15,309 KB)
Tab 3 Regulatory Matrix (152 KB)
Tab 4 Wetland Information (848 KB)
Tab 5 Update on Vegetation & Wildlife Impacts (3,025 KB)
Tab 6 Sound Mapping (2,535 KB)
Tab 7 Hazard Zones (324 KB)
Tab 8 Shadow Mapping (6,230 KB)
Tab 9 Lighting (1,118 KB)
Tab 10 Supplemental Regulatory Information (1,193 KB)
FEIS Final Environmental Impact Statement

Land Use Consistency:

Council Order No. 825 - Land Use Consistency
Land Use Consistency Hearing Transcript


SEPA:

Final Supplemental Environmental Impact Statement - November 6, 2009

Draft Supplemental Environmental Impact Statement - 4-2-09

Cover, Fact Sheet, Table of Contents
1.0  Summary
2.0
 Alternatives Including the Proposed Action
3.0  Affected Environment, Significant Impacts,
      Mitigation Measures, and Significant
      Unavoidable Adverse Impacts
4.0  References Cited
5.0  Distribution List

Final Environmental Impact Statement (Kittitas County 2004):

FEIS page

Golder Report (PDF format) - Analysis in
Support of a SEPA Threshold Determination
for the Desert Claim Wind Power Project - February 2007.

Recent Activity:

2-2-10 Governor Approves Site Certification Agreement - Governor Gregoire's approval letter

12-4-09 Approval recommendation delivered to Governor

11-16-09 Order No. 843, Order Recommending Approval of Site Certification Agreement

11-10-09 Notice and Agenda of Special Meeting on November 16, 2009 for EFSEC decision and recommendation to Governor

11-6-09 Final Supplemental Environmental Impact Statement

8-17-09 Council for the Environment's Post Hearing Comments

8-17-09 Kittitas County's Post Hearing Submission

7-31-09 Desert Claim's Draft Site Certification Agreement

7-31-09 Desert Claim's Post Hearing Brief in Support of Certification

7-28-09 Transcripts for Adjudicative hearings

7-21-09 Department of Fish & Wildlife Settlement Agreement

7-17-09 Notice of Posthearing Conference on July 22, 2009 at 11:00 am

6-30-09 Stipulation Between Counsel for the Environment and Desert Claim Wind Power LLC

6-23-09 Notice of Prehearing Conference on July 8, 2009 at 1:30 pm

6-18-09 Notice of Public Hearing and Comment Opportunity and Notice of Adjudicative Hearing - July 13 & 21, 2009

6-17-09 Draft Supplemental Environmental Impact Statement Public Comments

6-10-09 Order No. 841 - Granting Extension of Time to File Pre-filed Testimony

5-12-09 Order No. 840 with Mr. Overbeck's Documents - Prehearing Order Denying Intervention; Amending Schedule

5-12-09 Desert Claim LLC Prefiled Testimony

4-29-09 Prehearing Order Granting Petition for Intervention; Allowing Late-Filed Petition; Establishing Hearing Schedule Council Order No. 838

4-2-09 Draft Supplemental Environmental Impact Statement Comments due 5-4-09.  Public comment meeting 4-23-09, Hal Holms Conference Center, Ellensburg, WA.

3-27-09 Commencement of Adjudication, Notice for Intervention , Notice of Prehearing Conference, Notice of Site Tour.  Requests for intervention are due by 5 pm, April 17, 2009.  Prehearing Conference 1:30 pm, April 23, 2009 at the Hal Holms Community Center followed by Site Tour starting at approximately 3 pm April 23, 2009.

2-13-09 EFSEC approves an extension of the application review period to 12-31-09.

2-6-09 Revised Application and request to extend the EFSEC application review time (see page 5 of the submittal letter in the Introduction of Revised Application).

2-12-08 EFSEC approves an extension of the application review period to 2-12-09. Desert Claim's request.

6-29-07 Request for Preemption - enXco's request for preemption. Declaration of David Steeb.

5-8-07 Council Order No. 830 - Order on Determination that Desert Claim Wind Power has Satisfied WAC 463-28-030(1)

5-1-07 Council Order No. 829 - Request for Extension to File Request for Preemption

4-26-07 SPECIAL MEETING April 30, 2007 Request to Extend 90 Day Time Limit.

Special Meeting Documents:

enXco's Motion - WAC 463-28-030(1) Satisfied;
Mr. Steeb's Declaration Support of Motion;
EFSEC requests Response from Recipients
Kittitas County's Response to Motion;
Commissioner Crankovich Affidavit,
Mr. Piercy's Affidavit;
enXco's Supplemental Briefing,
enXco's Request for Extension

Top of page

Project Mailing List

To be added to the Desert Claim project mailing list, please:

  • contact Kali Wraspir kwraspir@utc.wa.gov at (360) 664-1365, or

  • e-mail your complete name and postal address to efsec@utc.wa.gov and indicate if you want to receive notices of future permitting activity for this project by e-mail, surface mail, or both methods of delivery.

Top of page


Home Page | About EFSEC | Certification | Energy Facilities 
Laws & Rules
|
Rulemaking | Meetings | Staff Contacts  
Site Map | Links | Privacy Notice   

Access Washington Logo  

www.efsec.wa.gov
Question or Comment? Contact EFSEC at efsec@utc.wa.gov